Tender Details
Particulars | Details |
---|---|
Title |
Package No. Tn13 126 R Avudayarkoil Panchayat Union Periodical Renewal Road From L089 Muthukudah Road Km 0/0 2/070 In Nattanipurasakudi Panchayat
|
Description |
Package No. Tn13 126 R Avudayarkoil Panchayat Union Periodical Renewal Road From L089 Muthukudah Road Km 0/0 2/070 In Nattanipurasakudi Panchayat
|
Organisation | National Rural Roads Development Agency (NRRDA) | Central Govt. Ministry/Department |
Tender Id | 2025_RDTN_141410_1 |
Reference Number |
PDKT/TN13-126R/AVK |
Tender Fee | 0 |
EMD | 84000 |
Tender Value | |
Place | Avudaiyarkoil |
Link | https://pmgsytenderstn.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=220297 |
Start Date | May 18, 2025 00:00 |
End Date |
03/06/2025 ( Expired 6 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Read moreIe services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)
Ie services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreConstruction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham
Construction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham
Read moreProvn of bathroom and toilet block in otm accn bldg no. 40 and provn of fence at boundary wall from palta road junction ishapur to mt area of 2 sikh at bgtc area barrackpur under ge barrackpore
Provn of bathroom and toilet block in otm accn bldg no. 40 and provn of fence at boundary wall from palta road junction ishapur to mt area of 2 sikh at bgtc area barrackpur under ge barrackpore
Read moreConsultancy services for authoritys engineer for supervision of construction of four lane of chausa_buxar bypass from km 45.000 to km 65.915 (package 2) of nh 319a in the state of bihar on epc mode.
Consultancy services for authoritys engineer for supervision of construction of four lane of chausa_buxar bypass from km 45.000 to km 65.915 (package 2) of nh 319a in the state of bihar on epc mode.
Read moreUnder state scheme (chief minister road connectivity scheme) extension of math lamkoti motor road from km 2 to 5 in purola development block of purola assembly constituency of uttarkashi distt (stage-2, iind phase) (including maintenance of 3 year)
Under state scheme (chief minister road connectivity scheme) extension of math lamkoti motor road from km 2 to 5 in purola development block of purola assembly constituency of uttarkashi distt (stage-2, iind phase) (including maintenance of 3 year)
Read moreConstruction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 15 0 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Construction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 15 0 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Read moreConstruction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 1 50 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Construction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 1 50 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Read moreCa no ge south amb 18 2025 2026 periodical services for certain married and otm accn of sardar patel road in b 2 sector mahesh nagar and adjoining area of age age b r ii south under ge south ambala cantt
Ca no ge south amb 18 2025 2026 periodical services for certain married and otm accn of sardar patel road in b 2 sector mahesh nagar and adjoining area of age age b r ii south under ge south ambala cantt
Read moreof your Industry type