Tender Details

About Tender

📣 Bharat Sanchar Nigam Limited (Bsnl) Requires Gi Pole Tower Arrangement 🏭🛠️ Bsnl, A Govt Of India Enterprise, Is Issuing A Tender For The Provision Of Three 6 Meter Long Gi Pole Tower Arrangements, Inclusive Of Foundation And Erection, At The Holycave Site On The Kalkar New Route From Pahalgam. 📅 Submission Deadline: May 10, 2024, 6:00 Pm Tender Fee: Inr 590 Emd: Inr 5205 Interested Bidders Must Demonstrate Expertise In The Installation Of Gi Pole Tower Arrangements And Adhere To The Project's Specifications And Timelines. Keywords: Bharat Sanchar Nigam Limited, Gi Pole Tower, Construction, Government Tender, Public Sector Undertaking, Erection, Foundation, Holycave, Kalkar New Route, Pahalgam
Particulars Details
Title
03/Ee/Div/Sgr/2024 25
Description
Providing Of Three Nos 6 Metre Long Gi Pole Tower Arrangement Including Foundation And Errection At Kalkar New Site Holy Cave Route From Pahalgam
Organisation Bharat Sanchar Nigam Limited (Govt of India Enterprise) | Public Sector Undertakings
Tender Id 2024_BSNL_194803_1
Reference
Number
03/EE/DIV/SGR/2024-25
Tender Fee 590
EMD 5205
Tender Value
Place Holycave
Link https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=213212
Start Date May 04, 2024 14:30
End Date

10/05/2024 ( Expired 401 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of new tower with pile foundation and associated work in place of river eroded tower

Construction of new tower with pile foundation and associated work in place of river eroded tower &amp#x0d at loc-160 of 132 kv dhaligaon-gossaigaon line

Read more
Construction of 1400 m long approx. new rcc framed brick boundary wall of 230mm thick, 3.05m height and 600mm y overhang with concertina coil by dismantling existing old boundary wall with installing of 2 nos gate near kali bari from hukuta chariali to sbi colony at duliajan, including supply of all materials except cement

Construction of 1400 m long approx. new rcc framed brick boundary wall of 230mm thick, 3.05m height and 600mm y overhang with concertina coil by dismantling existing old boundary wall with installing of 2 nos gate near kali bari from hukuta chariali to sbi colony at duliajan, including supply of all materials except cement

Read more
Construction of new storage overhead tank laying of gi line from newly acquired land and laying of new stp line at tuticorin airport

Construction of new storage overhead tank laying of gi line from newly acquired land and laying of new stp line at tuticorin airport

Read more
Providing, installing and commissioning of 6 nos. submersible pump set with panel and submersible cable complete in all respect contingent thereto at tw no. 13 near grain market in samana district patiala

Providing, installing and commissioning of 6 nos. submersible pump set with panel and submersible cable complete in all respect contingent thereto at tw no. 13 near grain market in samana district patiala

Read more
Development of new a site ro at village bangaon tehsil pathalgaon dist jashpur c.g. srmp location within 3 km from boys and girls high school bangaon towards kansabel on nh-43 katni gumla road under raipur divisional office of mpso.

Development of new a site ro at village bangaon tehsil pathalgaon dist jashpur c.g. srmp location within 3 km from boys and&#x0d girls high school bangaon towards kansabel on nh-43 katni gumla road under raipur divisional office of mpso.

Read more
Construction of new buildings for 1) sw post matric girls hostel at palamaner, 2) sw post matric boys hostel at gudiyatham road, palamamer in chittoor district, 3) sw pre matric girl hostel at proddatur, 4) sw pre matric boys hostel at kalasapadu in ysr kadapa district, 5) sw pre matric girls hostel at manubolu in spsr nellore district and 6) sw pre matric boys hostel at tirupati as package -v (6 nos) under pm ajay - esti.rs.1800.00 lakhs

Construction of new buildings for 1) sw post matric girls hostel at palamaner, 2) sw post matric boys hostel at gudiyatham road, palamamer in chittoor district, 3) sw pre matric girl hostel at proddatur, 4) sw pre matric boys hostel at kalasapadu in ysr kadapa district, 5) sw pre matric girls hostel at manubolu in spsr nellore district and 6) sw pre matric boys hostel at tirupati as package -v (6 nos) under pm ajay - esti.rs.1800.00 lakhs

Read more
Providing concrete lane adjoining newly constructed mettuvoikkal from sivagaminagar 5th cross to pump house at mariyal nagar and providing 2 nos. of concrete slab across mettuvoikkal at sivagaminagar 7th cross and mariyalnagar cross road at reddiarpa

Providing concrete lane adjoining newly constructed mettuvoikkal from sivagaminagar 5th cross to pump house at mariyal nagar and providing 2 nos. of concrete slab across mettuvoikkal at sivagaminagar 7th cross and mariyalnagar cross road at reddiarpa

Read more
Construction of control room building and providing plinth foundation for structure,cable duct, road,bore well with water supply,sanitary arrangements and other allied civil works for the establishment new 110/22 kv ss at kanakiliyanallur.

Construction of control room building and providing plinth foundation for structure,cable duct, road,bore well with water supply,sanitary arrangements and other allied civil works for the establishment new 110/22 kv ss at kanakiliyanallur.

Read more
Construction of control room building and providing plinth foundation for structure,cable duct, road,bore well with water supply,sanitary arrangements and other allied civil works for the establishment new 110 kv ss at panangadi in madurai edc.

Construction of control room building and providing plinth foundation for structure,cable duct, road,bore well with water supply,sanitary arrangements and other allied civil works for the establishment new 110 kv ss at panangadi in madurai edc.

Read more
Maintenance of lift room, toilets, washbasins, including scavenging works in ground, first floor and second floor of the central office main building at tatabad, coimbatore for a period of three months from 01.07.2025. (7 nos laborers per day)

Maintenance of lift room, toilets, washbasins, including &amp#x0d scavenging works in ground, first floor and second floor of the central office main building at tatabad, coimbatore for a period of three months from 01.07.2025. (7 nos laborers per day)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise