Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Providing Concrete Lane Adjoining Newly Constructed Mettuvoikkal From Sivagaminagar 5th Cross To Pump House At Mariyal Nagar And Providing 2 Nos. Of Concrete Slab Across Mettuvoikkal At Sivagaminagar 7th Cross And Mariyalnagar Cross Road At Reddiarpa
|
Description |
Providing Concrete Lane Adjoining Newly Constructed Mettuvoikkal From Sivagaminagar 5th Cross To Pump House At Mariyal Nagar And Providing 2 Nos. Of Concrete Slab Across Mettuvoikkal At Sivagaminagar 7th Cross And Mariyalnagar Cross Road At Reddiarpa
|
Organisation | Public Works Department | State Govt. and UT |
Tender Id | 2025_PWDC2_18810_1 |
Reference Number |
TN.27/PW/IRRN/2025-2026 |
Tender Fee | 525 |
EMD | 45644 |
Tender Value | |
Place | Puducherry |
Link | https://pudutenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=19174 |
Start Date | June 13, 2025 22:45 |
End Date |
26/06/2025 ( Expired 21 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Reconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra
Reconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra
Read moreWidening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m
Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m
Read moreConsultancy services for pre of dpr for rehabi, upgradation of existing road bet km 29.300 to km 55.550 jhala to sukhi bend from existing single lane to double lane with paved shoulder specification on gangotri uttarkashi dharasu road
Consultancy services for prepar of dpr for rehabilitation and upgradation of existing road bet km 29.300 to km 55.550 jhala to sukhi bend from existing single lane to double lane with paved shoulder specification on gangotri uttarkashi dharasu road
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreRepairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)
Repairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)
Read moreConstruction of road from km 0.00 to km 27.430 (package-1) of bile- migging section (km 0.00 at bile) of nh-913 (frontier highway) to intermediate lane on epc mode in the state of arunachal pradesh
Construction of road from km 0.00 to km 27.430 (package-1) of bile-
 migging section (km 0.00 at bile) of nh-913 (frontier highway) to intermediate
 lane on epc mode in the state of arunachal pradesh
Read moreConstruction of road from km 0.000 to km 17.812 (package-3) of bile- migging section (km 0.00 at migging end) of nh-913 (frontier highway) to intermediate lane on epc mode in the state of arunachal pradesh
Construction of road from km 0.000 to km 17.812 (package-3) of bile-
 migging section (km 0.00 at migging end) of nh-913 (frontier highway) to
 intermediate lane on epc mode in the state of arunachal pradesh
Read moreConstruction of road from km 17.812 to km 55.377 (package-2) of bile- migging section (km 0.00 at migging end) of nh-913 (frontier highway) to intermediate lane on epc mode in the state of arunachal pradesh
Construction of road from km 17.812 to km 55.377 (package-2) of bile-
 migging section (km 0.00 at migging end) of nh-913 (frontier highway) to
 intermediate lane on epc mode in the state of arunachal pradesh
Read moreFabrication and installation of mild steel median safety grills in reach-6 line of elevated section from gottigere (kalena agrahara) to swagath road cross (tavarekere station) chainage- 0.00m to 7501.00 m of bangalore metro rail project, phase-2
Fabrication and installation of mild steel 
 median safety grills in reach-6 line of elevated section from gottigere (kalena agrahara) to swagath road 
 cross (tavarekere station) chainage- 0.00m to 7501.00 m of bangalore metro rail project, phase-2
Read moreof your Industry type