Title |
Construction Of Behnan Tikhadiya Link Road In Km 1 To 2(800) Under Krishi Vipdan Yojna In Financial Year 2024 25. (Including 5 Year Maintenance Work)
|
Description |
Construction Of Behnan Tikhadiya Link Road In Km 1 To 2(800) Under Krishi Vipdan Yojna In Financial Year 2024 25. (Including 5 Year Maintenance Work)
|
Organisation | Chief Engineer Devipatan (Gonda) Zone PWD Gonda | State Govt. and UT |
Tender Id | 2025_CEDPW_1019449_1 |
Reference Number |
1369/8 Kam/e_Terndering/2024-25 Dated 19-03-2025 |
Tender Fee | 2715 |
EMD | 6.77 Lakh |
Tender Value | |
Place | Bahraich |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1838626 |
Start Date | March 19, 2025 23:30 |
End Date |
24/03/2025 ( Expired 48 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreRoutine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Read moreConstruction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Read moreConstruction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Construction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Read moreUpgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Read moreConstruction of 2 lane service road from km. 1072.900 (umedganj canal) to km. 1079.400 (naya nohara under pass) section of nh 27 (kota bypass) in the state of rajasthan
Construction of 2 lane service road from km. 1072.900 (umedganj canal) to km. 1079.400 (naya nohara under pass) section of nh 27 (kota bypass) in the state of rajasthan
Read moreConsultancy services for preparation of detailed project report and feasibility study for construction of 4 lane in section kohmara to ghoti km 0.000 to km 28.00 forest section in kohmara- goregaon- gondia- tirora- masnar road nh 753 length 28.00 km
Consultancy services for preparation of detailed project report and feasibility study for construction of 4 lane in section kohmara to ghoti km 0.000 to km 28.00 forest section in kohmara- goregaon- gondia- tirora- masnar road nh 753 length 28.00 km
Read moreShort term improvement and routine maintenance work of tolling reach of ramnagar fp from km 1251.814 to 1305.087 l53.273 km on baran shivpuri sec of new nh27 in madhya pradesh on pbmc mode.
Short term improvement and routine maintenance work of tolling reach of ramnagar fp from km 1251.814 to 1305.087 l53.273 km on baran shivpuri sec of new nh27 in madhya pradesh on pbmc mode.
Read moreof your Industry type