Tender Details
Particulars | Details |
---|---|
Title |
Erection And Removal Of Temporary Steel Barricade And Earthen Bund For Arresting Water Entry At Upstream Side Across The Intake And Allied Works During Overhauling Period February 2025 At Bkb I, Samayasangili
|
Description |
Erection And Removal Of Temporary Steel Barricade And Earthen Bund For Arresting Water Entry At Upstream Side Across The Intake And Allied Works During Overhauling Period February 2025 At Bkb I, Samayasangili
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_519781_1 |
Reference Number |
SE/EGC/C/07/24-25/Dt.20.01.25 |
Tender Fee | 0 |
EMD | 2700 |
Tender Value | |
Place | SAMAYASANGILI |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=618540 |
Start Date | January 22, 2025 23:30 |
End Date |
06/02/2025 ( Expired 96 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Maintenence of different pwd roads under the jurisdiction of pwd (r and b) jirania sub-division during the year 2025 26 sh patch brick soling, patch wbm 3, patch carpeting, road side pucca drain, pvc weir crates and other allied works etc. group i
Maintenence of different pwd roads under the jurisdiction of pwd (r and b) jirania sub-division during the year 2025 26 sh patch brick soling, patch wbm 3, patch carpeting, road side pucca drain, pvc weir crates and other allied works etc. group i
Read moreMtc of road from mandai road to bishrambari via narayanbari during the year 2025-26 sh patch soling, patch metalling, re-carpetting, road side pucca drain and other allied works. (l 0.75 km, ch.0.50 km to ch.1.25 km) group i.
Mtc of road from mandai road to bishrambari via narayanbari during the year 2025-26 sh patch soling, patch metalling, re-carpetting, road side pucca drain and other allied works. (l 0.75 km, ch.0.50 km to ch.1.25 km) group i.
Read moreMtc of different m i schemes under matabari rd block and umc area repairing of pump, motor, suction delivery and other allied works etc at different li schemes within the jurisdiction of wr sub division i gomati tripura during the year 2025 26
Mtc of different m i schemes under matabari rd block and umc area repairing of pump, motor, suction delivery and other allied works etc at different li schemes within the jurisdiction of wr sub division i gomati tripura during the year 2025 26
Read moreMtc of different mi schemes under amarpur block and amarpur nagar panchyet area repairing of pump motor suction dilivery and other allied works etc at different li schemes within wr sub division amarpur gomati tripura during the year 2025 26 gr i
Mtc of different mi schemes under amarpur block and amarpur nagar panchyet area repairing of pump motor suction dilivery and other allied works etc at different li schemes within wr sub division amarpur gomati tripura during the year 2025 26 gr i
Read more19(2)/kced-i/kol/2025/717 dated 08/05/2025
Moei fans i/c compound light, rmo motor pump set, dg set, lifts, sub-station equipments, wet riser, fire alarm at c.i.s.f. complex, e.m. bye pass, kasba, kolkata during 2025-26. (sh: supply and fixing of led fittings, exhaust fan and other allied electrical works)
Read moreT e and c of existing 6.6kv, 300 hp bha 700h pumpsets 600 hp submersible pump sets near puttamgandi including mom of pumping station for 4 months and dismantling and transportation of all equipment under td-iii, sahebnagar
Transportation, erection, testing and commissioning of existing 6.6kv, 300hp, bha 700h pump sets, 600hp submersible pump sets and all allied works and formation of bund across the approach main canal to maintain required level in canal for emergency pumping arrangements at foreshore of nagarjunasagar near puttamgandi including mom of pumping station for 4 months and dismantling and transportation of all equipment to kodandapur, nasarlapally and godakondla whenever sufficient inflows ed at nagarjunasagar reservoir under eam section, sd-iv(electrical), transmission div.iii, sahebnagar
Read moreT,e and c of existing 6.6kv, 300hp, bha700h pump sets, 600hp submersible pump sets near puttamgandi including mom of pumping station of 4 months and dismantling and transportation of all equipmentto kpur, gkondla and under td-iii, sahebnagar
Transportation, erection, testing and commissioning of existing 6.6kv, 300hp, bha 700h pump sets, 600hp submersible pump sets and all allied works and formation of bund across the approach main canal to maintain required level in canal for emergency pumping arrangements at foreshore of nagarjunasagar near puttamgandi including mom of pumping station for 4 months and dismantling and transportation of all equipment to kodandapur, nasarlapally and godakondla whenever sufficient inflows ed at nagarjunasagar reservoir under eam section, sd-iv(electrical), transmission div.iii, sahebnagar
Read moreTtps mech ii ahp attending maintenance works in ash slurry sump strainers at ash slurry pump house removal of clinkers and debris to avoid choking in ash slurry pump and ash disposal pipelines of unit i ii iii for the period from 01 04 2025 to 31
Ttps mech ii ahp attending maintenance works in ash slurry sump strainers at ash slurry pump house removal of clinkers and debris to avoid choking in ash slurry pump and ash disposal pipelines of unit i ii iii for the period from 01 04 2025 to 31
Read moreSupplying of unskilled personnel for flag hoisting and gate man for manning at the gate between block-i and block-ii of writers buildings towards lyons range and other allied works during the year 2024-2025 (for 6 months).
Supplying of unskilled personnel for flag hoisting and gate man for manning at the gate between block-i and block-ii of writers buildings towards lyons range and other allied works during the year 2024-2025 (for 6 months).
Read moreErection and removal of temporary steel barricade and earthen bund for arresting water entry at upstream side across the intake and allied works during overhauling period february 2025 at bkb-i, samayasangili
Erection and removal of temporary steel barricade and earthen bund for arresting water entry at upstream side across the intake and allied works during overhauling period february 2025 at bkb-i, samayasangili
Read moreof your Industry type