Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Ttps Mech Ii Ahp Attending Maintenance Works In Ash Slurry Sump Strainers At Ash Slurry Pump House Removal Of Clinkers And Debris To Avoid Choking In Ash Slurry Pump And Ash Disposal Pipelines Of Unit I Ii Iii For The Period From 01 04 2025 To 31
|
Description |
Ttps Mech Ii Ahp Attending Maintenance Works In Ash Slurry Sump Strainers At Ash Slurry Pump House Removal Of Clinkers And Debris To Avoid Choking In Ash Slurry Pump And Ash Disposal Pipelines Of Unit I Ii Iii For The Period From 01 04 2025 To 31
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_525431_1 |
Reference Number |
CE/TTPS/SE/M-II/No.12/2025-26 |
Tender Fee | 0 |
EMD | 8900 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=625554 |
Start Date | February 17, 2025 21:30 |
End Date |
04/03/2025 ( Expired 116 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ttps operation circle mpm i unit iii removal of all the damaged insulation in the hot primary air ducts from air preheaters to mills and insulating the ducts with lrb wool mattresses and cladding with g.i sheet of 0.63mm thickness and removal of ash
Ttps operation circle mpm i unit iii removal of all the damaged insulation in the hot primary air ducts from air preheaters to mills and insulating the ducts with lrb wool mattresses and cladding with g.i sheet of 0.63mm thickness and removal of ash
Read moreTtps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site
Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site
Read moreTtps mech ii bm unit iii replacement of wornout corroded structural supports painting of structurals removal of existing wornout asbestos sheets and providing new galvalume sheets in all four sides in unit iii boiler at 56mtr elevation
Ttps mech ii bm unit iii replacement of wornout corroded structural supports painting of structurals removal of existing wornout asbestos sheets and providing new galvalume sheets in all four sides in unit iii boiler at 56mtr elevation
Read moreNctps i se m ii ahp dn unit iii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Nctps i se m ii ahp dn unit iii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Read moreMtps i oandahs unit iii iv ash handling pump house stage ii dismantling of worn out suction pipe lines bends and grills in ash slurry sump iii and iv fabrication and erection of 300nb m s suction pipes and bends in the suction lines
Mtps i oandahs unit iii iv ash handling pump house stage ii dismantling of worn out suction pipe lines bends and grills in ash slurry sump iii and iv fabrication and erection of 300nb m s suction pipes and bends in the suction lines
Read moreTtps mech ii ahp ash slurry disposal lines in unit i ii strengthening of 340 mm od cast basalt pipes by provision of reinforcement m s plates over the corroded m s outer shell of the pipes in line no 5 of unit i ii ash slurry disposal lines in be
Ttps mech ii ahp ash slurry disposal lines in unit i ii strengthening of 340 mm od cast basalt pipes by provision of reinforcement m s plates over the corroded m s outer shell of the pipes in line no 5 of unit i ii ash slurry disposal lines in be
Read moreNctps i se m ii ahp dn unit ii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Nctps i se m ii ahp dn unit ii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Read moreNctps i se m ii ahp dn unit i attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Nctps i se m ii ahp dn unit i attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Read moreKtps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.
Ktps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.
Read moreTtps mech ii ahp stage i ii awph overhauling and load testing of 7 5 ton capacity eot cranes in ash water pump house
Ttps mech ii ahp stage i ii awph overhauling and load testing of 7 5 ton capacity eot cranes in ash water pump house
Read moreof your Industry type