Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Transportation, Installation With Necessary Fabrication Jobs Of One 90 Mtr. Head Complete Turbine Pump Motor Set Along With Its 4 Inch Dia. Pipeline At 77 L/ 15 D In R Vila Seam At 3 N4 Incline Unit, Jhanjra Project Colliery.
|
| Description |
Transportation, Installation With Necessary Fabrication Jobs Of One 90 Mtr. Head Complete Turbine Pump Motor Set Along With Its 4 Inch Dia. Pipeline At 77 L/ 15 D In R Vila Seam At 3 N4 Incline Unit, Jhanjra Project Colliery.
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_ECL_288761_1 |
|
Reference Number |
ECL/GM/JNR/EnM/A2/23-24/12 DATE07-09-23 |
| Tender Fee | - |
| EMD | 3000 |
| Tender Value | - |
| Place | Online |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | September 15, 2023 16:30 |
| End Date |
Expired
30/09/2023
Expired 1112 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Installation of track line at r-vii (sector f) seam at 3n4 incline, jpc
Installation of track line at r-vii (sector f) seam at 3n4 incline, jpc
Read moreReplacement of two nos belt conveyor motor at 72l-11d 2nd belt conveyor, two nos starter running at 11( 2 )and72l belt conveyor at 3n4 incline ug of jhanjra project colliery
Replacement of two nos belt conveyor motor at 72l-11d 2nd belt conveyor, two nos starter running at 11( 2 )and72l belt conveyor at 3n4 incline ug of jhanjra project colliery
Read moreSalvaging two nos. 315kva, 6.6kv/550v tsus and 4 nos vcbs, acbs from 7d, 71l substations of lhcm2 section in r vii seam to surface of 3n4 incline, jpc
Salvaging two nos. 315kva, 6.6kv/550v tsus and 4 nos vcbs, acbs from 7d, 71l substations of lhcm2 section in r vii seam to surface of 3n4 incline, jpc
Read moreInstallation of one no 90 mtr head complete turbine pump motor by transportation installation with necessary fabrication jobs at lhcm 1 in r viia seam at 3n4 incline unit jhanjra project colliery
Installation of one no 90 mtr head complete turbine pump motor by transportation installation with necessary fabrication jobs at lhcm 1 in r viia seam at 3n4 incline unit jhanjra project colliery
Read moreStrengthening of 6d sump at lhcm-1 by transportation and installation with necessary fabrication jobs of one 120-meter head complete turbine pump-motor at 6d/87l in r viia seam at 3n4 incline unit, jhanjra project colliery.
Strengthening of 6d sump at lhcm-1 by transportation and installation with necessary fabrication jobs of one 120-meter head complete turbine pump-motor at 6d/87l in r viia seam at 3n4 incline unit, jhanjra project colliery.
Read moreTransportation n placing of one complete 6.6kv/550v ug sub-station at 15d/(71l-72l) in r-vii seam of 3n4 incline unit, jpc.
Transportation n placing of one complete 6.6kv/550v ug sub-station at 15d/(71l-72l) in r-vii seam of 3n4 incline unit, jpc.
Read moreTransportation installation with necessary fabrication jobs of one 90 mtr head complete turbine pump motor at 20xd 67l along with its 4 inch dia pipeline from 20xd 67l to 7xd sump in rvii seam at 3n4 incline unit jhanjra project colliery
Transportation installation with necessary fabrication jobs of one 90 mtr head complete turbine pump motor at 20xd 67l along with its 4 inch dia pipeline from 20xd 67l to 7xd sump in rvii seam at 3n4 incline unit jhanjra project colliery
Read moreTransportation, installation with necessary fabrication of one no. 300 mtr. head turbine pump-motor-base frame including civil jobs, placing of er-cable n fitting of pipeline at 75l/-14d of r-viia seam at 3n4 incline unit, jhanjra project co
Transportation, installation with necessary fabrication of one no. 300 mtr. head turbine pump-motor-base frame including civil jobs, placing of er-cable n fitting of pipeline at 75l/-14d of r-viia seam at 3n4 incline unit, jhanjra project co
Read moreTransportation, installation, necessary fabrication, commissioning, trail run including extension of 80ltandem belt conveyor (8d to 19d) in rviia seam of 3n4 incline under jhanjra area.
Transportation, installation, necessary fabrication, commissioning, trail run including extension of 80ltandem belt conveyor (8d to 19d) in rviia seam of 3n4 incline under jhanjra area.
Read moreTransportation, installation, necessary fabrication, commissioning, trail run including extension of 80ltandem belt conveyor (8d to 19d) in rviia seam of 3n4 incline under jhanjra area.
Transportation, installation, necessary fabrication, commissioning, trail run including extension of 80ltandem belt conveyor (8d to 19d) in rviia seam of 3n4 incline under jhanjra area.
Read moreof your Industry type