Tender Details
Particulars | Details |
---|---|
Title |
Strengthening Of 6 D Sump At Lhcm 1 By Transportation And Installation With Necessary Fabrication Jobs Of One 120 Meter Head Complete Turbine Pump Motor At 6 D/87 L In R Viia Seam At 3 N4 Incline Unit, Jhanjra Project Colliery.
|
Description |
Strengthening Of 6 D Sump At Lhcm 1 By Transportation And Installation With Necessary Fabrication Jobs Of One 120 Meter Head Complete Turbine Pump Motor At 6 D/87 L In R Viia Seam At 3 N4 Incline Unit, Jhanjra Project Colliery.
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_ECL_329182_1 |
Reference Number |
ECL/GM/JNR/EnM/A2/24-25/144 dated 12.02.2025 |
Tender Fee | 0 |
EMD | 11100 |
Tender Value | |
Place | JHANJRA UNDERGROUND |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=341198 |
Start Date | February 18, 2025 16:30 |
End Date |
28/02/2025 ( Expired 52 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Transportation, installation, necessary fabrication, commissioning trial including extension of one no. 1000mm width, 1x90kw, 550v, single drive belt conveyor along 64l from 8d to 10d in r-vii seam at 3n4 incline, j.p. colly.
Transportation, installation, necessary fabrication, commissioning trial including extension of one no. 1000mm width, 1x90kw, 550v, single drive belt conveyor along 64l from 8d to 10d in r-vii seam at 3n4 incline, j.p. colly.
Read moreTransportation and installation of 276 meter 1000mm belt structure with belting and two times transportation and installation of tail end unit along 85l from 13d to 20d in r viia seam of 3n4 incline, jhanjra project colliery
Transportation and installation of 276 meter 1000mm belt structure with belting and two times transportation and installation of tail end unit along 85l from 13d to 20d in r viia seam of 3n4 incline, jhanjra project colliery
Read moreStrengthening of 6d sump at lhcm-1 by transportation and installation with necessary fabrication jobs of one 120-meter head complete turbine pump-motor at 6d/87l in r viia seam at 3n4 incline unit, jhanjra project colliery.
Strengthening of 6d sump at lhcm-1 by transportation and installation with necessary fabrication jobs of one 120-meter head complete turbine pump-motor at 6d/87l in r viia seam at 3n4 incline unit, jhanjra project colliery.
Read moreTransportation and fitting of 3 in dia spray pipeline along 4d and 85l in r-viia seam of lhcm-1 at 3n4 incline, j.p. colliery.
Transportation and fitting of 3 in dia spray pipeline along 4d and 85l in r-viia seam of lhcm-1 at 3n4 incline, j.p. colliery.
Read moreLoading, transportation, unloading installation of one 22kw 550v tugger haulage complete with electrical at 13d 83l and one time shifting in r-viia seam after necessary fabrication of base frame and fencing
Loading, transportation, unloading installation of one 22kw 550v tugger haulage complete with electrical at 13d 83l and one time shifting in r-viia seam after necessary fabrication of base frame and fencing
Read morePillars shortening from -1d 80l to -6d 80l re fitting of 5 pillars structure from -6d 80l to 1d 80l of 1000mm 80l belt conveyor of lhcm-1 section in r-viia seam at 3n4 incline, jpc
Pillars shortening from -1d 80l to -6d 80l re fitting of 5 pillars structure from -6d 80l to 1d 80l of 1000mm 80l belt conveyor of lhcm-1 section in r-viia seam at 3n4 incline, jpc
Read moreTransportation, installation, necessary fabrication, commissioning trial of one no. 1000 mm width, 1 90kw, 550v, single drive belt conveyor along 85l from 4d to 12d in r-viia seam at 3n4 incline, j.p.colly
Transportation, installation, necessary fabrication, commissioning trial of one no. 1000 mm width, 1 90kw, 550v, single drive belt conveyor along 85l from 4d to 12d in r-viia seam at 3n4 incline, j.p.colly
Read moreInstallation of one no turbine pump with motor 90m head, 90kw 550v, base frame and er in sector -a in cm-1 panel at rv seam after transportation of pipe from surface and installation one pipeline for a length of 360m approx 60 nos pipe 4 in dia
Installation of one no turbine pump with motor 90m head, 90kw 550v, base frame and er in sector -a in cm-1 panel at rv seam after transportation of pipe from surface and installation one pipeline for a length of 360m approx 60 nos pipe 4 in dia
Read moreTransportation placing of one no. 6.6kv/550v tsu, four no. 6.6kv vcb, two nos 550v acbs and their cables for power distribution at panel-8, r-vii seam, 3n4 incline, jpc
Transportation placing of one no. 6.6kv/550v tsu, four no. 6.6kv vcb, two nos 550v acbs and their cables for power distribution at panel-8, r-vii seam, 3n4 incline, jpc
Read moreStrengthening of 74al belt conveyor by fabrication of fixed unit of loop take up, installing gear coupling at 3n4 incline, j.p.colly.
Strengthening of 74al belt conveyor by fabrication of fixed unit of loop take up, installing gear coupling at 3n4 incline, j.p.colly.
Read moreof your Industry type