Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Installation Of One No 90 Mtr Head Complete Turbine Pump Motor By Transportation Installation With Necessary Fabrication Jobs At Lhcm 1 In R Viia Seam At 3n4 Incline Unit Jhanjra Project Colliery
|
| Description |
Installation Of One No 90 Mtr Head Complete Turbine Pump Motor By Transportation Installation With Necessary Fabrication Jobs At Lhcm 1 In R Viia Seam At 3n4 Incline Unit Jhanjra Project Colliery
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_ECL_338692_1 |
|
Reference Number |
ECL/GM/JNR/EnM/A2/25-26/26 dated 26.06.2025 |
| Tender Fee | 0 |
| EMD | 14600 |
| Tender Value | |
| Place | JHANJRA UNDERGROUND |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=351104 |
| Start Date | July 05, 2025 16:30 |
| End Date |
Expired
15/07/2025
Expired 338 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Strengthening of 6d sump at lhcm-1 by transportation and installation with necessary fabrication jobs of one 120-meter head complete turbine pump-motor at 6d/87l in r viia seam at 3n4 incline unit, jhanjra project colliery.
Strengthening of 6d sump at lhcm-1 by transportation and installation with necessary fabrication jobs of one 120-meter head complete turbine pump-motor at 6d/87l in r viia seam at 3n4 incline unit, jhanjra project colliery.
Read moreTransportation, installation with necessary fabrication of one no. 300 mtr. head turbine pump-motor-base frame including civil jobs, placing of er-cable n fitting of pipeline at 75l/-14d of r-viia seam at 3n4 incline unit, jhanjra project co
Transportation, installation with necessary fabrication of one no. 300 mtr. head turbine pump-motor-base frame including civil jobs, placing of er-cable n fitting of pipeline at 75l/-14d of r-viia seam at 3n4 incline unit, jhanjra project co
Read moreTransportation installation with necessary fabrication jobs of one 90 mtr head complete turbine pump motor at 20xd 67l along with its 4 inch dia pipeline from 20xd 67l to 7xd sump in rvii seam at 3n4 incline unit jhanjra project colliery
Transportation installation with necessary fabrication jobs of one 90 mtr head complete turbine pump motor at 20xd 67l along with its 4 inch dia pipeline from 20xd 67l to 7xd sump in rvii seam at 3n4 incline unit jhanjra project colliery
Read moreTransportation, installation with necessary fabrication jobs of one 90mtr. head complete turbine pump-motor set along with its 4 inch dia. pipeline at 77l/-15d in r-vila seam at 3n4 incline unit, jhanjra project colliery.
Transportation, installation with necessary fabrication jobs of one 90mtr. head complete turbine pump-motor set along with its 4 inch dia. pipeline at 77l/-15d in r-vila seam at 3n4 incline unit, jhanjra project colliery.
Read moreStrengthening of 72l belt conveyor at lhcm-1, r-viia seam, 3n4 incline, j.p.colly
Strengthening of 72l belt conveyor at lhcm-1, r-viia seam, 3n4 incline, j.p.colly
Read moreTransportation installation of two nos. 30 mtr. head roto pumps at r-viia seam of 3n4 incline, j.p.colly.
Transportation installation of two nos. 30 mtr. head roto pumps at r-viia seam of 3n4 incline, j.p.colly.
Read moreInstallation of one no. 6.6kv substation at 4d 79l-80l and installation of 3.3kv cable in r-viia seam at 3n4 incline unit, jhanjra project colliery
Installation of one no. 6.6kv substation at 4d 79l-80l and installation of 3.3kv cable in r-viia seam at 3n4 incline unit, jhanjra project colliery
Read moreStrengthening of 15xd tandem belt conveyor at lhcm-1, r-viia seam, 3n4 incline, j.p.colly.
Strengthening of 15xd tandem belt conveyor at lhcm-1, r-viia seam, 3n4 incline, j.p.colly.
Read moreTransportation-installation of 448.5 m 1000mm belt structure with belting and tail end unit along 80l in r viia seam of 3n4 incline, jhanjra project colliery
Transportation-installation of 448.5 m 1000mm belt structure with belting and tail end unit along 80l in r viia seam of 3n4 incline, jhanjra project colliery
Read moreInstallation of trackline and one no. tugger haulage complete with electricals at panel-9, lhcm-1 in r-viia seam, 3n4 incline unit, j.p.colly.
Installation of trackline and one no. tugger haulage complete with electricals at panel-9, lhcm-1 in r-viia seam, 3n4 incline unit, j.p.colly.
Read moreof your Industry type