Tender Details
Particulars | Details |
---|---|
Title |
Pillars Shortening From 1 D 80 L To 6 D 80 L Re Fitting Of 5 Pillars Structure From 6 D 80 L To 1 D 80 L Of 1000mm 80 L Belt Conveyor Of Lhcm 1 Section In R Viia Seam At 3n4 Incline, Jpc
|
Description |
Pillars Shortening From 1 D 80 L To 6 D 80 L Re Fitting Of 5 Pillars Structure From 6 D 80 L To 1 D 80 L Of 1000mm 80 L Belt Conveyor Of Lhcm 1 Section In R Viia Seam At 3n4 Incline, Jpc
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_ECL_327049_1 |
Reference Number |
ECL/GM/JNR/EnM/A2/24-25/123 dated 22.01.2025 |
Tender Fee | 0 |
EMD | 15800 |
Tender Value | |
Place | JHANJRA UNDERGROUND |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=338995 |
Start Date | January 31, 2025 16:30 |
End Date |
10/02/2025 ( Expired 117 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Transportation, installation, commissioning, necessary fabrication and trial including civil work of one 1200 mm width 2x150kw, 6.6kv pvc belt conveyor 3d tandem for a length of 225 mtr. from 3d 4l to 3d 9l cm panel-trunk road t5 in rv seam and e
Transportation, installation, commissioning, necessary fabrication and trial including civil work of one 1200 mm width 2x150kw, 6.6kv pvc belt conveyor 3d tandem for a length of 225 mtr. from 3d 4l to 3d 9l cm panel-trunk road t5 in rv seam and e
Read moreStrengthening of 15xd tandem belt conveyor at lhcm-1, r-viia seam, 3n4 incline, j.p.colly.
Strengthening of 15xd tandem belt conveyor at lhcm-1, r-viia seam, 3n4 incline, j.p.colly.
Read moreInstallation of trackline and one no. tugger haulage complete with electricals at panel-9, lhcm-1 in r-viia seam, 3n4 incline unit, j.p.colly.
Installation of trackline and one no. tugger haulage complete with electricals at panel-9, lhcm-1 in r-viia seam, 3n4 incline unit, j.p.colly.
Read moreTransportation and installation of 1000mm wide belt conveyor from 71x/5l to 71x/4l, 71x/4l to 78x/4lw and 78x/4lw to 5l/78x in shivpur block at west block of churcha mine (ro).
Transportation and installation of 1000mm wide belt conveyor from 71x/5l to 71x/4l, 71x/4l to 78x/4lw and 78x/4lw to 5l/78x in shivpur block at west block of churcha mine (ro).
Read moreEngagaing of 1 no of 8kl capacity truck mounted sewer suction cum jetting machine for 23rd, 24th, 25th and 26th divisions in ae-5 section works division-ii on hire basis for a period of 4 months from june to septemeber 2025
Engagaing of 1 no of 8kl capacity truck mounted sewer suction cum jetting machine for 23rd, 24th, 25th and 26th divisions in ae-5 section works division-ii on hire basis for a period of 4 months from june to septemeber 2025. (rc.v1-109142/2025)
Read moreRe-conductoring of 3 phase lt line from 50 sq. mm. (acsr 6/1/3.35 mm) to 100 sq. mm. (acsr 6/1/4.72 mm) from 400kva, 11/0.4kv dtr nagmandir colony in (e) section mohal uesd, hpsebl, bhuntar.
Re-conductoring of 3 phase lt line from 50 sq. mm. (acsr 6/1/3.35 mm) to 100 sq. mm. (acsr 6/1/4.72 mm) from 400kva, 11/0.4kv dtr nagmandir colony in (e) section mohal uesd, hpsebl, bhuntar.
Read moreImp/dev of drainage system and road in gautampuri (1) sh 1 gali no-12 links from h.no r-93 to t-399, t-397 to t-157/14 (2) t-399 to t-392 (3) t-399 to t-404 (4) t-402 to t-408 (5) t-428 to t-419 (6) t-428 to t-437 in ward no 226 gautampuri ee (miv) s
Imp/dev of drainage system and road in gautampuri (1) sh 1 gali no-12 links from h.no r-93 to t-399, t-397 to t-157/14 (2) t-399 to t-392 (3) t-399 to t-404 (4) t-402 to t-408 (5) t-428 to t-419 (6) t-428 to t-437 in ward no 226 gautampuri ee (miv) s
Read moreWidening and heightening of drift from seam-iii to seam-ii, 0le between incline no. 1 to incline no. 2 and cleaning of fallen coal gallery with support of roof in seam-iii of katkona 1 and 2 incline.
Widening and heightening of drift from seam-iii to seam-ii, 0le between incline no. 1 to incline no. 2 and cleaning of fallen coal gallery with support of roof in seam-iii of katkona 1 and 2 incline.
Read moreInstallation of gear coupling, installation of equalizing pinion set, snub drum of 1000mm wide -8d belt conveyor in lhcm-2 section of r-vii seam at 3n4 incline, j.p.colly.
Installation of gear coupling, installation of equalizing pinion set, snub drum of 1000mm wide -8d belt conveyor in lhcm-2 installation of gear coupling, installation of equalizing pinion set, snub drum of 1000mm wide -8d belt conveyor in lhcm-2 sect
Read moreS/r of 5 nos. l/r from village multhan to bhoodwass (1312 ), pwd road to village patakpur (1324), nagina to bhadas (7130), ter to mohmmadpur (8201), jaitaka to uleta (1294) in ferojpur jhirka constituency (group no-1) under wp for the year 2025-26
S/r of 5 nos. l/r from village multhan to bhoodwass (1312 ), pwd road to village patakpur (1324), nagina to bhadas (7130), ter to mohmmadpur (8201), jaitaka to uleta (1294) in ferojpur jhirka constituency (group no-1) under wp for the year 2025-26
Read moreof your Industry type