Tender Details
Particulars | Details |
---|---|
Title |
Transportation, Installation With Necessary Fabrication Of One No. 300 Mtr. Head Turbine Pump Motor Base Frame Including Civil Jobs, Placing Of Er Cable N Fitting Of Pipeline At 75 L/ 14 D Of R Viia Seam At 3 N4 Incline Unit, Jhanjra Project Co
|
Description |
Transportation, Installation With Necessary Fabrication Of One No. 300 Mtr. Head Turbine Pump Motor Base Frame Including Civil Jobs, Placing Of Er Cable N Fitting Of Pipeline At 75 L/ 14 D Of R Viia Seam At 3 N4 Incline Unit, Jhanjra Project Co
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_ECL_323282_1 |
Reference Number |
ECL/GM/JNR/EnM/A2/24-25/97 dated 09.12.2024 |
Tender Fee | 0 |
EMD | 6700 |
Tender Value | |
Place | JHANJRA UNDERGROUND |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=335115 |
Start Date | December 23, 2024 16:30 |
End Date |
27/12/2024 ( Expired 115 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dismantling fabrication and erection and fitting of rom b/c, transfer b/c motor and gear box base frame structure repairing of fresh water er pipeline for water sprinkling in both side hopper, crusher inlet and in different locations in p.c.h sec
Dismantling fabrication and erection and fitting of rom b/c, transfer b/c motor and gear box base frame structure repairing of fresh water er pipeline for water sprinkling in both side hopper, crusher inlet and in different locations in p.c.h sec
Read moreTransportation and installation of 276 meter 1000mm belt structure with belting and two times transportation and installation of tail end unit along 85l from 13d to 20d in r viia seam of 3n4 incline, jhanjra project colliery
Transportation and installation of 276 meter 1000mm belt structure with belting and two times transportation and installation of tail end unit along 85l from 13d to 20d in r viia seam of 3n4 incline, jhanjra project colliery
Read moreStrengthening of 6d sump at lhcm-1 by transportation and installation with necessary fabrication jobs of one 120-meter head complete turbine pump-motor at 6d/87l in r viia seam at 3n4 incline unit, jhanjra project colliery.
Strengthening of 6d sump at lhcm-1 by transportation and installation with necessary fabrication jobs of one 120-meter head complete turbine pump-motor at 6d/87l in r viia seam at 3n4 incline unit, jhanjra project colliery.
Read moreMatching of 02 nos. motor pump with base frame fabrication/modification followed by supplying and fixing tire coupling r-140, base frame foot bolt, suction and delivery nipple fabrication n fitting to install additional pump at main sump for
Matching of 02 nos. motor pump with base frame fabrication/modification followed by supplying and fixing tire coupling r-140, base frame foot bolt, suction and delivery nipple fabrication n fitting to install additional pump at main sump for
Read moreTransportation and fitting of 3 in dia spray pipeline along 4d and 85l in r-viia seam of lhcm-1 at 3n4 incline, j.p. colliery.
Transportation and fitting of 3 in dia spray pipeline along 4d and 85l in r-viia seam of lhcm-1 at 3n4 incline, j.p. colliery.
Read moreLoading, transportation, unloading installation of one 22kw 550v tugger haulage complete with electrical at 13d 83l and one time shifting in r-viia seam after necessary fabrication of base frame and fencing
Loading, transportation, unloading installation of one 22kw 550v tugger haulage complete with electrical at 13d 83l and one time shifting in r-viia seam after necessary fabrication of base frame and fencing
Read moreTransportation, installation, necessary fabrication, commissioning trial of one no. 1000 mm width, 1 90kw, 550v, single drive belt conveyor along 85l from 4d to 12d in r-viia seam at 3n4 incline, j.p.colly
Transportation, installation, necessary fabrication, commissioning trial of one no. 1000 mm width, 1 90kw, 550v, single drive belt conveyor along 85l from 4d to 12d in r-viia seam at 3n4 incline, j.p.colly
Read moreInstallation of one no turbine pump with motor 90m head, 90kw 550v, base frame and er in sector -a in cm-1 panel at rv seam after transportation of pipe from surface and installation one pipeline for a length of 360m approx 60 nos pipe 4 in dia
Installation of one no turbine pump with motor 90m head, 90kw 550v, base frame and er in sector -a in cm-1 panel at rv seam after transportation of pipe from surface and installation one pipeline for a length of 360m approx 60 nos pipe 4 in dia
Read moreTransportation, installation, necessary fabrication, commissioning trial of one no. 1000 mm width, 1x90kw, 550v, single drive belt conveyor along 4d from 80l to 85l in r-viia seam at 3n4 incline, j.p.colly.
Transportation, installation, necessary fabrication, commissioning trial of one no. 1000 mm width, 1x90kw, 550v, single drive belt conveyor along 4d from 80l to 85l in r-viia seam at 3n4 incline, j.p.colly.
Read moreInstallation of one no new 1000gpm, 230m head turbine pump at 0d 9l with 250kw 6.6kv motor on baseframe and er after mounting of baseframe on a concrete platform 4mtrx2mtrx1ft fabrication and laying of 210 mtr 6 dia ms pipe from 0d 9l to 0d 4l b
Installation of one no new 1000gpm, 230m head turbine pump at 0d 9l with 250kw 6.6kv motor on baseframe and er after mounting of baseframe on a concrete platform 4mtrx2mtrx1ft fabrication and laying of 210 mtr 6 dia ms pipe from 0d 9l to 0d 4l b
Read moreof your Industry type