Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Transportation Installation With Necessary Fabrication Jobs Of One 90 Mtr Head Complete Turbine Pump Motor At 20 Xd 67 L Along With Its 4 Inch Dia Pipeline From 20 Xd 67 L To 7 Xd Sump In Rvii Seam At 3 N4 Incline Unit Jhanjra Project Colliery
|
| Description |
Transportation Installation With Necessary Fabrication Jobs Of One 90 Mtr Head Complete Turbine Pump Motor At 20 Xd 67 L Along With Its 4 Inch Dia Pipeline From 20 Xd 67 L To 7 Xd Sump In Rvii Seam At 3 N4 Incline Unit Jhanjra Project Colliery
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_ECL_316034_1 |
|
Reference Number |
ECL/GM/JNR/EnM/A2/24-25/51 dated 26.08.2024 |
| Tender Fee | 0 |
| EMD | 4600 |
| Tender Value | |
| Place | JHANJRA UNDERGROUND |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=327505 |
| Start Date | August 31, 2024 16:30 |
| End Date |
Expired
10/09/2024
Expired 646 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Transportation, installation with necessary fabrication jobs of one 90mtr. head complete turbine pump-motor set along with its 4 inch dia. pipeline at 77l/-15d in r-vila seam at 3n4 incline unit, jhanjra project colliery.
Transportation, installation with necessary fabrication jobs of one 90mtr. head complete turbine pump-motor set along with its 4 inch dia. pipeline at 77l/-15d in r-vila seam at 3n4 incline unit, jhanjra project colliery.
Read moreInstallation of one no 90 mtr head complete turbine pump motor by transportation installation with necessary fabrication jobs at lhcm 1 in r viia seam at 3n4 incline unit jhanjra project colliery
Installation of one no 90 mtr head complete turbine pump motor by transportation installation with necessary fabrication jobs at lhcm 1 in r viia seam at 3n4 incline unit jhanjra project colliery
Read moreStrengthening of 6d sump at lhcm-1 by transportation and installation with necessary fabrication jobs of one 120-meter head complete turbine pump-motor at 6d/87l in r viia seam at 3n4 incline unit, jhanjra project colliery.
Strengthening of 6d sump at lhcm-1 by transportation and installation with necessary fabrication jobs of one 120-meter head complete turbine pump-motor at 6d/87l in r viia seam at 3n4 incline unit, jhanjra project colliery.
Read moreTransportation, installation with necessary fabrication of one no. 300 mtr. head turbine pump-motor-base frame including civil jobs, placing of er-cable n fitting of pipeline at 75l/-14d of r-viia seam at 3n4 incline unit, jhanjra project co
Transportation, installation with necessary fabrication of one no. 300 mtr. head turbine pump-motor-base frame including civil jobs, placing of er-cable n fitting of pipeline at 75l/-14d of r-viia seam at 3n4 incline unit, jhanjra project co
Read moreTransportation installation of 74bl 2nd pump set 18xd pump set 20xd pump set with 360 mtr.4inchdia pipeline n 7xd 3rd pump set with 150mtr 6 inch dia pipeline at 3n4 incline unit jhanjra project colliery
Transportation installation of 74bl 2nd pump set 18xd pump set 20xd pump set with 360 mtr.4inchdia pipeline n 7xd 3rd pump set with 150mtr 6 inch dia pipeline at 3n4 incline unit jhanjra project colliery
Read moreTransportation installation of one no 30 m head roto pump motor with electricals 300 m 3 dia pipeline at r vii seam of 3n4 incline j.p.colly
Transportation installation of one no 30 m head roto pump motor with electricals 300 m 3 dia pipeline at r vii seam of 3n4 incline j.p.colly
Read moreTransportation installation of one endless haulage complete with transportation fitting of 621 mtr track line 1242 mtr rails at panel 9 of rvii seam at 3n4 incline jpc
Transportation installation of one endless haulage complete with transportation fitting of 621 mtr track line 1242 mtr rails at panel 9 of rvii seam at 3n4 incline jpc
Read moreTransportation-installation of 448.5 m 1000mm belt structure with belting and tail end unit along 80l in r viia seam of 3n4 incline, jhanjra project colliery
Transportation-installation of 448.5 m 1000mm belt structure with belting and tail end unit along 80l in r viia seam of 3n4 incline, jhanjra project colliery
Read moreTransportation and fitting of 3 in dia spray pipeline along 4d and 85l in r-viia seam of lhcm-1 at 3n4 incline, j.p. colliery.
Transportation and fitting of 3 in dia spray pipeline along 4d and 85l in r-viia seam of lhcm-1 at 3n4 incline, j.p. colliery.
Read moreTransportation, installation, necessary fabrication commissioning trail run including extension of one no 1000mm width 2x150kw belt conveyor along 48l from oxd to 8d in panel t4 at rvii seam, 3n4 incline jpc
Transportation, installation, necessary fabrication commissioning trail run including extension of one no 1000mm width 2x150kw belt conveyor along 48l from oxd to 8d in panel t4 at rvii seam, 3n4 incline jpc
Read moreof your Industry type