Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Muck And Debris Cleaning Along 3rd Belt Conveyor In Rvii And Rviia Seam At 3 And 4 Incline Unit Of Jhanjra Project Colliery
|
| Description |
Muck And Debris Cleaning Along 3rd Belt Conveyor In Rvii And Rviia Seam At 3 And 4 Incline Unit Of Jhanjra Project Colliery
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_ECL_319260_1 |
|
Reference Number |
ECL/GM/JNR/MIN.A/24-25/27 Dt. 15.10.2024 |
| Tender Fee | 0 |
| EMD | 9200 |
| Tender Value | - |
| Place | Jhanjra Project Colliery |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=330908 |
| Start Date | October 18, 2024 16:30 |
| End Date |
Expired
28/10/2024
Expired 718 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing of five no pressure drum shell dia 215 mm x 1150 mm long shaft dia 75 mm of 1000 mm belt conveyors rvii and rviia seam installed in 3 and 4 incline j p colliery
Repairing of five no pressure drum shell dia 215 mm x 1150 mm long shaft dia 75 mm of 1000 mm belt conveyors rvii and rviia seam installed in 3 and 4 incline j p colliery
Read moreInstallation and commissioning of 4sets of centrifugal pump set with all electricals, water pipe range in rvii and rviia seam of shyamsundarpur colliery under bankola area.
Installation and commissioning of 4sets of centrifugal pump set with all electricals, water pipe range in rvii and rviia seam of shyamsundarpur colliery under bankola area.
Read moreReplacement of two nos belt conveyor motor at 72l-11d 2nd belt conveyor, two nos starter running at 11( 2 )and72l belt conveyor at 3n4 incline ug of jhanjra project colliery
Replacement of two nos belt conveyor motor at 72l-11d 2nd belt conveyor, two nos starter running at 11( 2 )and72l belt conveyor at 3n4 incline ug of jhanjra project colliery
Read moreProposal for cleaning slurry debris along 48d plus 1 l to 47d plus 1 l in r v seam at mic unit of jhanjra project colliery
Proposal for cleaning slurry debris along 48d plus 1 l to 47d plus 1 l in r v seam at mic unit of jhanjra project colliery
Read moreCleaning along 19l belt from 7wd to 19wd in rvii a seam at shyamsundarpur colliery.
Cleaning along 19l belt from 7wd to 19wd in rvii a seam at shyamsundarpur colliery.
Read more08 (eight) nos. vulcanizing joints for steel cord belt conveyor of mic, jhanjra project colliery.
08 (eight) nos. vulcanizing joints for steel cord belt conveyor of mic, jhanjra project colliery.
Read moreCleaning of debris mixed with coal at r-vii bonbahal seam of porascole west colliery
Cleaning of debris mixed with coal at r-vii bonbahal seam of porascole west colliery
Read moreEstablishment of track lines for transporting of materials at inter mediate sum area in rvii seam at shyamsundarpur colliery.
Establishment of track lines for transporting of materials at inter mediate sum area in rvii seam at shyamsundarpur colliery.
Read moreRepairing of five nos. conveyor pulley (pcc 36a, pcc 58a, pcc 50a, pcc 51a, pcc 59a) of different size and two nos. conveyor drum (pcc 128, pcc 112) of mic, jhanjra project colliery
Repairing of five nos. conveyor pulley (pcc 36a, pcc 58a, pcc 50a, pcc 51a, pcc 59a) of different size and two nos. conveyor drum (pcc 128, pcc 112) of mic, jhanjra project colliery
Read moreRectification of gear coupling and rectification of loop-take-up unit and changing old vcb, starter of 4d belt in rvi seam of mic, jhanjra project colliery.
Rectification of gear coupling and rectification of loop-take-up unit and changing old vcb, starter of 4d belt in rvi seam of mic, jhanjra project colliery.
Read moreof your Industry type