Tender Details
Particulars | Details |
---|---|
Title |
AAAAAAAAAA Login to view |
Description |
Barrackpur Barasat (Sh 1) Road From 0.406 Km To 1.991 Km, Widening Works Including Rcc Box Drain Under Barrackpur Division In The District Of North 24 Parganas.. 2nd Call
|
Organisation | PUBLIC WORKS DEPARTMENT | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 10 Lakh |
Tender Value | |
Place | Barrackpore |
Link |
AAAAAAAAAA Login to view |
Start Date | April 14, 2025 20:30 |
End Date |
06/05/2025 ( 16 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreUpgradation of road kargil-dumgil (batalik road) from cl-9 to nhdl specifications from existing km 35.160 to km 49.754 (design chainage km 0.000 to km 14.594) under project vijayak, in ladakh (ut) on epc mode
Upgradation of road kargil-dumgil (batalik road) from cl-9 to nhdl specifications from existing km 35.160 to km 49.754 (design chainage km 0.000 to km 14.594) under project vijayak, in ladakh (ut) on epc mode
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreWidening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24
Widening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24
Read moreWbpwd/pw(r)/se/shc/nit no 02 of 2025-2026(2nd-call)
Herobhanga vidyasagar vidyamandir to jharkhali ferry ghat road, from 0.00 kmp to 3.80 kmp, widening and strengthening work under south 24-parganas highway division, p.w (roads) directorate in the district of south 24-parganas.
Read moreAAAAAAAAAA
Login to viewGhospara road from 2.00 km to 9.00 km and 17.50 km to 21.00 km- strengthening work under barrackpore division, p.w.d. in the district of north 24 parganas. during the year 2024-25..2nd call
Read moreAAAAAAAAAA
Login to viewSitaramdas omkarnath sarani (p.w.d. raod) from 0.00 km to 0.480 km strengthening under kolkata north division, p.w.d. in the district of north 24 parganas (dunlop bound carriageway only).
Read moreG.t. road (sh-2) from 674.35 km to 674.55 km, 675.20 km to 675.70 and 676.10 km to 676.36 km, strengthening work under howrah division in the district of howrah.
G.t. road (sh-2) from 674.35 km to 674.55 km, 675.20 km to 675.70 and 676.10 km to 676.36 km, strengthening work under howrah division in the district of howrah.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreof your Industry type