Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of 2 Lane Rob ...
|
| Description |
Construction Of 2 Lane Rob At Level Crossing 87 C At Km. 117/1 2 On Kanina Ateli Road (Mdr 124) Crossing Rewari Sadalpur Railway Line Mohindergarh Distt. (Ht/Lt Line Shifting) (Additional Work)
|
| Organisation | Haryana Government | State Govt. and UT |
| Tender Id | 2025_HRY_481207_1 |
|
Reference Number |
2025EEF4BBEB 4979 48E7 A7EE 38574C520FE9668BAR |
| Tender Fee | 6180 |
| EMD | 1.32 Lakh |
| Tender Value | |
| Place | Kanina |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=559192 |
| Start Date | November 03, 2025 23:00 |
| End Date |
Expired
13/11/2025
Expired 230 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hyderabad division: sw(i) sc-mue section: proposed construction of 2 lane rob in lieu of lc no.180 at rly km 422/1-2 of span 1x36.00 m composite girder between dab-bsx stations on mue-sc section of hyb division - deposit work sw(ii) hyb div: sc-mue section: proposed construction of 2 lane rob at rly km 418/0-1 of span 1x36.00 m composite girder between kek- dab stations on mue-sc section on sh/mdr at km 1002.9 at atkur side road bypass near dharmabad-deposit work. - electrical trd arrang
For complete deion and other details, please refer to tender
Read moreEngagement of user fee collection agency on the basis of cb through e-tender for ujara fee plaza for widening to 2 lane with paved shoulders and strengthening including construction of cd structures on nh-86 in the state of mp
Engagement of user fee collection agency on the basis of cb through e-tender for ujara fee plaza for widening to 2 lane with paved shoulders and strengthening including construction of cd structures on nh-86 in the state of mp
Read moreDevelopment and upgradation of existing airport at valmiki nagar for code-2b type of aircraft
Construction of runway, taxiway, apron, perimeter road, gse area, vehicular lane, emergency access road, resa, runway basic strip and other associated works at valmiki nagar airport.
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read more7) construction of bt road gandher to chacha khedi km 2/0 to 3/00
7) construction of bt road gandher to chacha khedi km 2/0 to 3/00
Read moreUnder district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&#x0d
Read moreConstruction of 08 courts on 4th and 5th floor and 2 courts building at3rd floor of court complex bharatpur
Construction of 08 courts on 4th and 5th floor and 2 courts building at3rd floor of court complex bharatpur
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Read moreof your Industry type