Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Transportation Of 552 Mtr. Trackline Total Rail Length 1104 Mtr Materials From Surface/Previous Panel And Fitting Them From 4 D/74 L To 20 D/74 L, Lhcm 1 In R Viia Seam
|
Description |
Transportation Of 552 Mtr. Trackline Total Rail Length 1104 Mtr Materials From Surface/Previous Panel And Fitting Them From 4 D/74 L To 20 D/74 L, Lhcm 1 In R Viia Seam
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 7800 |
Tender Value | |
Place | JHANJRA UNDERGROUND |
Link |
AAAAAAAAAA Login to view |
Start Date | June 21, 2025 16:30 |
End Date |
01/07/2025 ( 9 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Transportation of 552 mtr. trackline total rail length 1104 mtr materials from surface/previous panel and fitting them from 4d/74l to 20d/74l, lhcm-1 in r-viia seam
Transportation of 552 mtr. trackline total rail length 1104 mtr materials from surface/previous panel and fitting them from 4d/74l to 20d/74l, lhcm-1 in r-viia seam
Read moreInstallation of trackline and one no. tugger haulage complete with electricals at panel-9, lhcm-1 in r-viia seam, 3n4 incline unit, j.p.colly.
Installation of trackline and one no. tugger haulage complete with electricals at panel-9, lhcm-1 in r-viia seam, 3n4 incline unit, j.p.colly.
Read moreTransportation, installation, commissioning, necessary fabrication and trial including civil work of one 1200 mm width 2x150kw, 6.6kv pvc belt conveyor 3d tandem for a length of 225 mtr. from 3d 4l to 3d 9l cm panel-trunk road t5 in rv seam and e
Transportation, installation, commissioning, necessary fabrication and trial including civil work of one 1200 mm width 2x150kw, 6.6kv pvc belt conveyor 3d tandem for a length of 225 mtr. from 3d 4l to 3d 9l cm panel-trunk road t5 in rv seam and e
Read moreDismentling transportation and installation of haulage system laying and packing of haulage tracking line from 70 l to 72l/37d along 70lw/20d to 37 d total length 590 mtr. (for dismentling) and from 70 l to 66lw/ 20rise and along 66lw/20d to 35
Dismentling transportation and installation of haulage system laying and packing of haulage tracking line from 70 l to 72l/37d along 70lw/20d to 37 d total length 590 mtr. (for dismentling) and from 70 l to 66lw/ 20rise and along 66lw/20d to 35
Read moreTransportation of material like roof bolts with nuts bear-ing plates, w-strap capsules, props or planks and stemming material from surface to ug panel of lws and bagdona seam in all running district at tawa-ii mine, pathakhera area, wcl
Transportation of material like roof bolts with nuts bear-ing plates, w-strap capsules, props or planks and stemming material from surface to ug panel of lws and bagdona seam in all running district at tawa-ii mine, pathakhera area, wcl
Read moreDrilling of 1 vertical bore hole from surface to 1 dip in between 2l to 3l in dishergarh r-iv seam of ningha colliery
Drilling of 1 vertical bore hole from surface to 1 dip in between 2l to 3l in dishergarh r-iv seam of ningha colliery
Read moreTransporting 180mt 60lbs rail from surface and 500mt from 6th dip to e 8 panel, tg level inside and laying fitting thereof at e 8 panel tg level inside from 6th dip in xvi(b) seam of moonidih colliery, w j area
Transporting 180mt 60lbs 
 rail from surface and 500mt 
 from 6th dip to e 8 panel, 
 tg level inside and laying 
 fitting thereof at e 8 panel 
 tg level inside from 6th 
 dip in xvi(b) seam of 
 moonidih colliery, 
 w j area
Read moreTransportation and installation of 276 meter 1000mm belt structure with belting and two times transportation and installation of tail end unit along 85l from 13d to 20d in r viia seam of 3n4 incline, jhanjra project colliery
Transportation and installation of 276 meter 1000mm belt structure with belting and two times transportation and installation of tail end unit along 85l from 13d to 20d in r viia seam of 3n4 incline, jhanjra project colliery
Read moreStrengthening of 6d sump at lhcm-1 by transportation and installation with necessary fabrication jobs of one 120-meter head complete turbine pump-motor at 6d/87l in r viia seam at 3n4 incline unit, jhanjra project colliery.
Strengthening of 6d sump at lhcm-1 by transportation and installation with necessary fabrication jobs of one 120-meter head complete turbine pump-motor at 6d/87l in r viia seam at 3n4 incline unit, jhanjra project colliery.
Read moreTransportation and fitting of 3 in dia spray pipeline along 4d and 85l in r-viia seam of lhcm-1 at 3n4 incline, j.p. colliery.
Transportation and fitting of 3 in dia spray pipeline along 4d and 85l in r-viia seam of lhcm-1 at 3n4 incline, j.p. colliery.
Read moreof your Industry type