Tender Details

Particulars Details
Title
Transportation Installation Of 310.5 Mtr. 1000mm Belt Structure With Belting And Nine Times Transportation Installation Of Tail End Unit Along 5 R For Development Of Trunk Road For Panel 10, 11 N 12 In R Viia Seam By Lhcm 1 At 3n4 Incline, J.P.Colly.
Description
Transportation Installation Of 310.5 Mtr. 1000mm Belt Structure With Belting And Nine Times Transportation Installation Of Tail End Unit Along 5 R For Development Of Trunk Road For Panel 10, 11 N 12 In R Viia Seam By Lhcm 1 At 3n4 Incline, J.P.Colly.
Organisation Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2024_ECL_322903_1
Reference
Number
ECL/GM/JNR/EnM/A2/24-25/96 dated 03.12.2024
Tender Fee 0
EMD 15000
Tender Value
Place JHANJRA UNDERGROUND
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=334707
Start Date December 13, 2024 16:30
End Date

23/12/2024 ( Expired 166 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Transportation, installation, commissioning, necessary fabrication and trial including civil work of one 1200 mm width 2x150kw, 6.6kv pvc belt conveyor 3d tandem for a length of 225 mtr. from 3d 4l to 3d 9l cm panel-trunk road t5 in rv seam and e

Transportation, installation, commissioning, necessary fabrication and trial including civil work of one 1200 mm width 2x150kw, 6.6kv pvc belt conveyor 3d tandem for a length of 225 mtr. from 3d 4l to 3d 9l cm panel-trunk road t5 in rv seam and e

Read more
Strengthening of 15xd tandem belt conveyor at lhcm-1, r-viia seam, 3n4 incline, j.p.colly.

Strengthening of 15xd tandem belt conveyor at lhcm-1, r-viia seam, 3n4 incline, j.p.colly.

Read more
Installation of trackline and one no. tugger haulage complete with electricals at panel-9, lhcm-1 in r-viia seam, 3n4 incline unit, j.p.colly.

Installation of trackline and one no. tugger haulage complete with electricals at panel-9, lhcm-1 in r-viia seam, 3n4 incline unit, j.p.colly.

Read more
Installation of gear coupling, installation of equalizing pinion set, snub drum of 1000mm wide -8d belt conveyor in lhcm-2 section of r-vii seam at 3n4 incline, j.p.colly.

Installation of gear coupling, installation of equalizing pinion set, snub drum of 1000mm wide -8d belt conveyor in lhcm-2 installation of gear coupling, installation of equalizing pinion set, snub drum of 1000mm wide -8d belt conveyor in lhcm-2 sect

Read more
Regular cleaning of malma/debris/slurry from below and sides of 1000mm belt conveyor and tail end point of 15 no. incline mouth to underground upto 2l in 4a seam at jhiria ug mine

Regular cleaning of malma/debris/slurry from below and sides of 1000mm belt conveyor and tail end point of 15 no. incline mouth to underground upto 2l in 4a seam at jhiria ug mine

Read more
Transportation, installation, necessary fabrication, commissioning trial including extension of one no. 1000mm width, 1x90kw, 550v, single drive belt conveyor along 64l from 8d to 10d in r-vii seam at 3n4 incline, j.p. colly.

Transportation, installation, necessary fabrication, commissioning trial including extension of one no. 1000mm width, 1x90kw, 550v, single drive belt conveyor along 64l from 8d to 10d in r-vii seam at 3n4 incline, j.p. colly.

Read more
Installation of gate belt (1000mm) for proposed development/dep. panel cm 6 and cm 7 (vii seam)at bangwar ug mine, sgp area

Installation of gate belt (1000mm) for proposed development/dep. panel cm 6 and cm 7 (vii seam)at bangwar ug mine, sgp area

Read more
Transportation and installation of 276 meter 1000mm belt structure with belting and two times transportation and installation of tail end unit along 85l from 13d to 20d in r viia seam of 3n4 incline, jhanjra project colliery

Transportation and installation of 276 meter 1000mm belt structure with belting and two times transportation and installation of tail end unit along 85l from 13d to 20d in r viia seam of 3n4 incline, jhanjra project colliery

Read more
Strengthening of 6d sump at lhcm-1 by transportation and installation with necessary fabrication jobs of one 120-meter head complete turbine pump-motor at 6d/87l in r viia seam at 3n4 incline unit, jhanjra project colliery.

Strengthening of 6d sump at lhcm-1 by transportation and installation with necessary fabrication jobs of one 120-meter head complete turbine pump-motor at 6d/87l in r viia seam at 3n4 incline unit, jhanjra project colliery.

Read more
Extension of 1000mm wide belt conveyor of trunk belt conveyor tb 4 extension of tail end with conveyor structure (length 339 mtr.) and gate belt of 81l west dist.in seam 1(combined) (top seam)(length 1488 mtr.) total length 1827 mtrs. at gayatri ug m

Extension of 1000mm wide belt conveyor of trunk belt conveyor tb 4 extension of tail end with conveyor structure (length 339 mtr.) and gate belt of 81l west dist.in seam 1(combined) (top seam)(length 1488 mtr.) total length 1827 mtrs. at gayatri ug m

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise