Tender Details
Particulars | Details |
---|---|
Title |
Transportation Installation Of 379.5 Mtr. 1000mm Belt Structure With Belting And Eleven Times Transportation Installation Of Tail End Unit Along 74 L For Further Development Of Panel 10 In R Viia Seam By Lhcm 1 At 3 N4 Incline, J.P.Colly.
|
Description |
Transportation Installation Of 379.5 Mtr. 1000mm Belt Structure With Belting And Eleven Times Transportation Installation Of Tail End Unit Along 74 L For Further Development Of Panel 10 In R Viia Seam By Lhcm 1 At 3 N4 Incline, J.P.Colly.
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_ECL_322550_1 |
Reference Number |
ECL/GM/JNR/EnM/A2/24-25/94 dated 29.11.2024 |
Tender Fee | 0 |
EMD | 23900 |
Tender Value | |
Place | JHANJRA UNDERGROUND |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=334347 |
Start Date | December 07, 2024 16:30 |
End Date |
17/12/2024 ( Expired 173 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Transportation, installation, commissioning, necessary fabrication and trial including civil work of one 1200 mm width 2x150kw, 6.6kv pvc belt conveyor 3d tandem for a length of 225 mtr. from 3d 4l to 3d 9l cm panel-trunk road t5 in rv seam and e
Transportation, installation, commissioning, necessary fabrication and trial including civil work of one 1200 mm width 2x150kw, 6.6kv pvc belt conveyor 3d tandem for a length of 225 mtr. from 3d 4l to 3d 9l cm panel-trunk road t5 in rv seam and e
Read moreInstallation of trackline and one no. tugger haulage complete with electricals at panel-9, lhcm-1 in r-viia seam, 3n4 incline unit, j.p.colly.
Installation of trackline and one no. tugger haulage complete with electricals at panel-9, lhcm-1 in r-viia seam, 3n4 incline unit, j.p.colly.
Read moreStrengthening of 15xd tandem belt conveyor at lhcm-1, r-viia seam, 3n4 incline, j.p.colly.
Strengthening of 15xd tandem belt conveyor at lhcm-1, r-viia seam, 3n4 incline, j.p.colly.
Read moreInstallation of gear coupling, installation of equalizing pinion set, snub drum of 1000mm wide -8d belt conveyor in lhcm-2 section of r-vii seam at 3n4 incline, j.p.colly.
Installation of gear coupling, installation of equalizing pinion set, snub drum of 1000mm wide -8d belt conveyor in lhcm-2 installation of gear coupling, installation of equalizing pinion set, snub drum of 1000mm wide -8d belt conveyor in lhcm-2 sect
Read moreRegular cleaning of malma/debris/slurry from below and sides of 1000mm belt conveyor and tail end point of 15 no. incline mouth to underground upto 2l in 4a seam at jhiria ug mine
Regular cleaning of malma/debris/slurry from below and sides of 1000mm belt conveyor and tail end point of 15 no. incline mouth to underground upto 2l in 4a seam at jhiria ug mine
Read moreTransportation, installation, necessary fabrication, commissioning trial including extension of one no. 1000mm width, 1x90kw, 550v, single drive belt conveyor along 64l from 8d to 10d in r-vii seam at 3n4 incline, j.p. colly.
Transportation, installation, necessary fabrication, commissioning trial including extension of one no. 1000mm width, 1x90kw, 550v, single drive belt conveyor along 64l from 8d to 10d in r-vii seam at 3n4 incline, j.p. colly.
Read moreInstallation of gate belt (1000mm) for proposed development/dep. panel cm 6 and cm 7 (vii seam)at bangwar ug mine, sgp area
Installation of gate belt (1000mm) for proposed development/dep. panel cm 6 and cm 7 (vii seam)at bangwar ug mine, sgp area
Read moreTransportation, installation, commissioning, and trial of one 1000mm width, 1x90kw, 550v, single drive belt conveyor at 8r in r vii seam.
Transportation, installation, commissioning, and trial of one 1000mm width, 1x90kw, 550v, single drive belt conveyor at 8r in r vii seam.
Read moreTransportation and installation of 276 meter 1000mm belt structure with belting and two times transportation and installation of tail end unit along 85l from 13d to 20d in r viia seam of 3n4 incline, jhanjra project colliery
Transportation and installation of 276 meter 1000mm belt structure with belting and two times transportation and installation of tail end unit along 85l from 13d to 20d in r viia seam of 3n4 incline, jhanjra project colliery
Read moreStrengthening of 6d sump at lhcm-1 by transportation and installation with necessary fabrication jobs of one 120-meter head complete turbine pump-motor at 6d/87l in r viia seam at 3n4 incline unit, jhanjra project colliery.
Strengthening of 6d sump at lhcm-1 by transportation and installation with necessary fabrication jobs of one 120-meter head complete turbine pump-motor at 6d/87l in r viia seam at 3n4 incline unit, jhanjra project colliery.
Read moreof your Industry type