Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Transportation Installation Of 379.5 Mtr. 1000mm Belt Structure With Belting And Eleven Times Transportation Installation Of Tail End Unit Along 74 L For Further Development Of Panel 10 In R Viia Seam By Lhcm 1 At 3 N4 Incline, J.P.Colly.
|
| Description |
Transportation Installation Of 379.5 Mtr. 1000mm Belt Structure With Belting And Eleven Times Transportation Installation Of Tail End Unit Along 74 L For Further Development Of Panel 10 In R Viia Seam By Lhcm 1 At 3 N4 Incline, J.P.Colly.
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_ECL_322550_1 |
|
Reference Number |
ECL/GM/JNR/EnM/A2/24-25/94 dated 29.11.2024 |
| Tender Fee | 0 |
| EMD | 23900 |
| Tender Value | - |
| Place | JHANJRA UNDERGROUND |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=334347 |
| Start Date | December 07, 2024 16:30 |
| End Date |
Expired
17/12/2024
Expired 628 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Transportation-installation of 379.5 mtr. 1000mm belt structure with belting and eleven times transportation installation of tail end unit at 84l belt conveyor in panel-8, r-viia seam of 3n4 incline, jhanjra project colliery.
Transportation-installation of 379.5 mtr. 1000mm belt structure with belting and eleven times transportation installation of tail end unit at 84l belt conveyor in panel-8, r-viia seam of 3n4 incline, jhanjra project colliery.
Read moreStrengthening of 72l belt conveyor at lhcm-1, r-viia seam, 3n4 incline, j.p.colly
Strengthening of 72l belt conveyor at lhcm-1, r-viia seam, 3n4 incline, j.p.colly
Read moreStrengthening of 15xd tandem belt conveyor at lhcm-1, r-viia seam, 3n4 incline, j.p.colly.
Strengthening of 15xd tandem belt conveyor at lhcm-1, r-viia seam, 3n4 incline, j.p.colly.
Read moreStrengthening of -11d(2nd) and -11d 3rd belt conveyor at lhcm 1, r viia seam, 3n4 incline, j.p.colly.
Strengthening of -11d(2nd) and -11d 3rd belt conveyor at lhcm 1, r viia seam, 3n4 incline, j.p.colly.
Read moreTransportation-installation of 310.5 mtr. 1000mm belt structure with belting and nine times transportation-installation of tail end unit along 5r for development of trunk road for panel-10, 11 n 12 in r-viia seam by lhcm-1 at 3n4 incline, j.p.colly.
Transportation-installation of 310.5 mtr. 1000mm belt structure with belting and nine times transportation-installation of tail end unit along 5r for development of trunk road for panel-10, 11 n 12 in r-viia seam by lhcm-1 at 3n4 incline, j.p.colly.
Read moreHeightening and proper alignment of structures at 80l belt conveyor at lhcm 1, r viia seam, 3n4 incline, j.p.colly.
Heightening and proper alignment of structures at 80l belt conveyor at lhcm 1, r viia seam, 3n4 incline, j.p.colly.
Read moreTransportation, laying, lapping n fitting of various different length short piece(less than 200mtr) old n used belting in various lhcm-1 belt conveyors at r-viia seam at 3n4 incline unit, j.p.colly.
Transportation, laying, lapping n fitting of various different length short piece(less than 200mtr) old n used belting in various lhcm-1 belt conveyors at r-viia seam at 3n4 incline unit, j.p.colly.
Read moreInstallation of eleven reels 2200 mtr 1000mm belt of lhcm-2 belt conveyors running at 3n4 incline unit, j.p.colly.
Installation of eleven reels 2200 mtr 1000mm belt of lhcm-2 belt conveyors running at 3n4 incline unit, j.p.colly.
Read moreTransportation installation of two nos. 30 mtr. head roto pumps at r-viia seam of 3n4 incline, j.p.colly.
Transportation installation of two nos. 30 mtr. head roto pumps at r-viia seam of 3n4 incline, j.p.colly.
Read moreInstallation of trackline and one no. tugger haulage complete with electricals at panel-9, lhcm-1 in r-viia seam, 3n4 incline unit, j.p.colly.
Installation of trackline and one no. tugger haulage complete with electricals at panel-9, lhcm-1 in r-viia seam, 3n4 incline unit, j.p.colly.
Read moreof your Industry type