Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Installation Of 700 Mtr. Trackline At Panel 8 In R Viia Seam, 3n4 Incline, J.P.Colly.
|
| Description |
Installation Of 700 Mtr. Trackline At Panel 8 In R Viia Seam, 3n4 Incline, J.P.Colly.
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_ECL_322014_1 |
|
Reference Number |
ECL/GM/JNR/EnM/A2/24-25/90 dated 22.11.2024 |
| Tender Fee | 0 |
| EMD | 5600 |
| Tender Value | - |
| Place | JHANJRA UNDERGROUND |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=333789 |
| Start Date | November 30, 2024 16:30 |
| End Date |
Expired
10/12/2024
Expired 675 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Transportation and installation of two no 22kw 550v tugger haulage complete with trackline from surface and installation for material transportation at lhcm 2 section at 3 and 4 incline jpc
Transportation and installation of two no 22kw 550v tugger haulage complete with trackline from surface and installation for material transportation at lhcm 2 section at 3 and 4 incline jpc
Read moreSimatic hmi ktp 700 basic panel part no. mlfb: 6av2123-2gb03-0ax0 make: siemens
Simatic hmi ktp 700 basic panel part no. mlfb: 6av2123-2gb03-0ax0 make: siemens
Read moreCross stitching at junction of depillaring panel-23 in kenda seam of jambad ug colliery
Cross stitching at junction of depillaring panel-23 in kenda seam of jambad ug colliery
Read moreMaintenance of belt conveyor for cm panel of 10b(top) seam at haldibari ug mine.
Maintenance of belt conveyor for cm panel of 10b(top) seam at haldibari ug mine.
Read moreConstruction of 03 nos sectionalisation stoppings between trunk panel and panel 8a of rvii seam at 3 and 4 unit under jpc
Construction of 03 nos sectionalisation stoppings between trunk panel and panel 8a of rvii seam at 3 and 4 unit under jpc
Read moreRe-support of incline no.01 and 2 intake return ug galleries 10b seam by hiring of dgms approved portable roof bolting machine and cleaning of the approaching area at b seam of west jkd colliery.
Re-support of incline no.01 and 2 intake return ug galleries 10b seam by hiring of dgms approved portable roof bolting machine and cleaning of the approaching area at b seam of west jkd colliery.
Read moreConstruction of 37 nos. isolation stopping in g-iiib seam p-1 panel of bagdewa ug mine.
Construction of 37 nos. isolation stopping in g-iiib seam p-1 panel of bagdewa ug mine.
Read moreConstruction of underground drain along rviiit2, r viiib1 and r vii seam with main incline and construction of three nos. of guard wall at shyamsundarpur colliery.
Construction of underground drain along rviiit2, r viiib1 and r vii seam with main incline and construction of three nos. of guard wall at shyamsundarpur colliery.
Read moreRoof bolting at dewatering routes for preparation of panel 16a in borachak ( r-viii) seam workings, patmohona colliery
Roof bolting at dewatering routes for preparation of panel 16a in borachak ( r-viii) seam workings, patmohona colliery
Read moreRepairing of 6 inch dia delivery pipe range in 2 seam incline ug fabrication of 3 nos. 6 inchu type bend one no. t type bend and 2 nos. at short pieces at 2 seam ug under wmc, akwmc katras area
Repairing of 6 inch dia delivery pipe range in 2 seam incline ug fabrication of 3 nos. 6 inchu type bend one no. t type bend and 2 nos. at short pieces at 2 seam ug under wmc, akwmc katras area
Read moreof your Industry type