Tender Details
Particulars | Details |
---|---|
Title |
Replacement Of Worn Out And Damaged Bucket Link Assly. 630mm Width 52 Subset Along With Front And Back Guide Angle With Liners Casing Liners Tail And Head Sprocket Assly. Side Cover Of Unit 222 Bucket Elevator Main Plant Of Kedla Washery
|
Description |
Replacement Of Worn Out And Damaged Bucket Link Assly. 630mm Width 52 Subset Along With Front And Back Guide Angle With Liners Casing Liners Tail And Head Sprocket Assly. Side Cover Of Unit 222 Bucket Elevator Main Plant Of Kedla Washery
|
Organisation | Coal India Limited (CIL) |
Tender Id | 2023_CCL_290474_1 |
Reference Number |
PO/KW/e-Tender/23-24/41, dated 06.10.2023 |
Tender Fee | |
EMD | 2200 |
Tender Value | |
Place | Kedla Washery |
Link | https://coalindiatenders.nic.in |
Start Date | October 07, 2023 15:30 |
End Date |
17/10/2023 ( Expired 553 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dismantling, repairing and replacement of damaged/ worn-out gear coupling, along with re-alignment and re-fitting of gear box of unit 402 conveyor at moonidih coal washery
Dismantling, repairing and replacement of damaged/ worn-out gear coupling, along with re-alignment and re-fitting of gear box of unit 402 conveyor at moonidih coal washery
Read moreDismantling, repairing and replacement of damaged/ worn-out gear coupling, overhauling and adjustment of intermediate pinions, along with re-alignment and re-fitting of gear box of unit 401 of moonidih coal washery.
Dismantling, repairing and replacement of damaged/ worn-out gear coupling, overhauling and adjustment of intermediate pinions, along with re-alignment and re-fitting of gear box of unit 401 of moonidih coal washery.
Read moreReplacement of 58 subsets of 1250mm bucket elevator along with tail n head sprocket assembly tumbler side cover of tail tumbler, front and back guide liner with mother angle, casing liner and gearbox maintenance of unit no. 208 bucket elevator of kw
Replacement of 58 subsets of 1250mm bucket elevator along with tail and head sprocket assembly tumbler side cover of tail tumbler, front and back guide liner with mother angle, casing liner and gearbox maintenance of unit no. 208 bucket elevator of k
Read moreComplete repairing of 02 nos. side cover of bucket elevator and 01 no. tail tumbler of each of unit no. 222 and 223 reject chamber and middling chamber of fine coal jig of main plant of kedla washery.
Complete repairing of 02 nos. side cover of bucket elevator and 01 no. tail tumbler of each of unit no. 222 and 223 reject chamber and middling chamber of fine coal jig of main plant of kedla washery.
Read moreComplete repairing of 02sets of damaged and worn-out drive and driven chain sprocket and shaft assly. of 800mm bucket elevator main plant of kedla washery.
Complete repairing of 02sets of damaged and worn-out drive and driven chain sprocket and shaft assly. of 800mm bucket elevator main plant of kedla washery.
Read moreReplacement of 630mm width 52 subsets of 630mm bucket elevator along with tail and head sprocket assly., tumbler, side cover of tail tumbler, front and back guide lines with mother angle, casing liner and gearbox maintenance of unit no. 222 b/e of kw
Replacement of 630mm width 52 subsets of 630mm bucket elevator along with tail and head sprocket assly., tumbler, side cover of tail tumbler, front and back guide lines with mother angle, casing liner and gearbox maintenance of unit no. 222 b/e of kw
Read moreReplacement of tail drum assembly and snub drum assembly after dismantling of existing worn-out drums for unit 501-a belt conveyor along with strengthening of base frame of its tail drum at moonidih coal washery.
Replacement of tail drum assembly and snub drum assembly after dismantling of existing worn-out drums for unit 501-a belt conveyor along with strengthening of base frame of its tail drum at moonidih coal washery.
Read moreDismantling and replacement of damaged/worn-out gear coupling, overhauling and adjustment of intermediate pinions along with re-alignment and re-fitting of gear box of unit 504 conveyor at moonidih coal washery.
Dismantling and replacement of damaged/worn-out gear coupling, overhauling and adjustment of intermediate pinions along with re-alignment and re-fitting of gear box of unit 504 conveyor at moonidih coal washery.
Read moreDismantling, repairing and re-fitting of 52subsets of 630mm b/e, along with tail tumbler side cover, front and back liner with mother angle, casing liner gear box maintenance of 223, b/e of main plant of k/w.
Dismantling, repairing and re-fitting of 52subsets of 630mm b/e, along with tail tumbler side cover, front and back liner with mother angle, casing liner gear box maintenance of 223, b/e of main plant of k/w.
Read moreReplacement of worn-out and damaged tail and tail snub pulley along with tail frame (non-drive) arrangement of unit no. 303 belt conveyor and making of 02 nos. frame stand for belting system of main plant at kedla washery.
Replacement of worn-out and damaged tail and tail snub pulley along with tail frame (non-drive) arrangement of unit no. 303 belt conveyor and making of 02 nos. frame stand for belting system of main plant at kedla washery.
Read moreof your Industry type