Tender Details

Particulars Details
Title
Replacement Of Damaged Front And Back Guide Liner Along With Motor Angle Bracing Angles, Casing Liner Plate Of 1250 Mm Bucket Elevator Of Unit No. 208 Of Main Plant Of Kedla Washery
Description
Replacement Of Damaged Front And Back Guide Liner Along With Motor Angle Bracing Angles, Casing Liner Plate Of 1250mm Bucket Elevator Of Unit No. 208 Of Main Plant Of Kedla Washery
Organisation Coal India Limited (CIL)
Tender Id 2023_CCL_291054_1
Reference
Number
PO/KW/e-Tender/23-24/52, dated 12.10.2023
Tender Fee -
EMD 2200
Tender Value -
Place Kedla Washery
Link
View Original Tender Notice

https://coalindiatenders.nic.in

Start Date October 13, 2023 15:30
End Date
Expired 23/10/2023

Expired 1086 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Painting of belt conveyor gallery beam, bracing angles, truss angles conveyor side bracing angle, cross plate and cable trench of 123 belt conveyor main plant of kedla washery

Painting of belt conveyor gallery beam, bracing angles, truss angles conveyor side bracing angle, cross plate and cable trench of 123 belt conveyor main plant of kedla washery

Read more
Repairing of 133b belt conveyor panel of 132kw motor and 208 bucket elevator panel of kedla washery

Repairing of 133b belt conveyor panel of 132kw motor and 208 bucket elevator panel of kedla washery

Read more
Replacement of 58 subsets of 1250mm bucket elevator along with tail n head sprocket assembly tumbler side cover of tail tumbler, front and back guide liner with mother angle, casing liner and gearbox maintenance of unit no. 208 bucket elevator of kw

Replacement of 58 subsets of 1250mm bucket elevator along with tail and head sprocket assembly tumbler side cover of tail tumbler, front and back guide liner with mother angle, casing liner and gearbox maintenance of unit no. 208 bucket elevator of k

Read more
Repairing and maintenance of 6.6kv, 1250 a trafofeeder panel of tr3 of main plant under kedla washery

Repairing and maintenance of 6.6kv, 1250 a trafofeeder panel of tr3 of main plant under kedla washery

Read more
Repairing of damaged/decayed boot (lining plate) after repairing of unit 222and223 bucket elevator and replacement of damaged/worn-out discharge chute of liner plate in unit of bucket elevator 222,223,207,208 of kedla washery.

Repairing of damaged/decayed boot (lining plate) after repairing of unit 222and223 bucket elevator and replacement of damaged/worn-out discharge chute of liner plate in unit of bucket elevator 222,223,207,208 of kedla washery.

Read more
Replacement of worn-out and damaged bucket link assly. 630mm width 52 subset along with front and back guide angle with liners casing liners tail and head sprocket assly. side cover of unit 222 bucket elevator main plant of kedla washery

Replacement of worn-out and damaged bucket link assly. 630mm width 52 subset along with front and back guide angle with liners casing liners tail and head sprocket assly. side cover of unit 222 bucket elevator main plant of kedla washery

Read more
Repairing/ strengthening of base pillars, posts and bracing angles for conveyor gantry of unit c-1 belt conveyor at moonidih coal washery.

Repairing/ strengthening of base pillars, posts and bracing angles for conveyor gantry of unit c-1 belt conveyor at moonidih coal washery.

Read more
Complete repairing/overhauling of 02 nos. of u-800 gear box for bucket elevator of main plant of kedla washery.

Complete repairing/overhauling of 02 nos. of u-800 gear box for bucket elevator of main plant of kedla washery.

Read more
Complete repairing/ overhauling of u-1000, mamc make gear box for unit no, 223 bucket elevator of main plant of kedla washery.

Complete repairing/ overhauling of u-1000, mamc make gear box for unit no, 223 bucket elevator of main plant of kedla washery.

Read more
Dismantling, repairing, re-installation, fitting and tension adjustment work in bucket elevator unit no. 222, 223 and 207 main plant of kedla washery.

Dismantling, repairing, re-installation, fitting and tension adjustment work in bucket elevator unit no. 222, 223 and 207 main plant of kedla washery.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise