Tender Details

Particulars Details
Title
Replacement And Fitting Of Chain Link Assly. Head And Tail Sprocket Assly. Bottom Side Top And Bottom Runner Plate, Frame Arrangement Rectification Of Unit No. 225 Chain Conveyor Main Plant Of Kedla Washery
Description
Replacement And Fitting Of Chain Link Assly. Head And Tail Sprocket Assly. Bottom Side Top And Bottom Runner Plate, Frame Arrangement Rectification Of Unit No. 225 Chain Conveyor Main Plant Of Kedla Washery
Organisation Coal India Limited (CIL)
Tender Id 2023_CCL_290397_1
Reference
Number
PO/KW/e-Tender/23-24/37, dated 04.10.2023
Tender Fee
EMD 2100
Tender Value
Place Kedla Washery
Link
View Original Tender Notice

https://coalindiatenders.nic.in

Start Date October 06, 2023 15:30
End Date
Expired 16/10/2023

Expired 975 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Replacement of damaged non-drive (tail-frame arrangement, deck plate arrangement, top, bottom idler frame tail and head, snub pulley) of unit no. 415 , 247 belt conveyor of main plant of kedla washery

Replacement of damaged non-drive (tail-frame arrangement, deck plate arrangement, top, bottom idler frame tail and head, snub pulley) of unit no. 415 , 247 belt conveyor of main plant of kedla washery

Read more
Rectification of worn-out chain link assly. tail,head sprocket assly. bottom,side liner plate,bottom and top runner with mother angle of unit 213 chain conv.,replacement and straightening of decayed conv. support beam channel,bracing of 302 gallery

Rectification of worn-out chain link assly. tail,head sprocket assly. bottom,side liner plate,bottom and top runner with mother angle of unit 213 chain conv.,replacement and straightening of decayed conv. support beam channel,bracing of 302 gallery

Read more
Replacement of scrapper chain, repairing of head n tail sprocket assay of 522 chain conveyor, dismantling, fabrication, and erection n alignment of top, side and bottom liners of 522 chain conveyors at main washing plant at rajrappa washery project

Replacement of scrapper chain, repairing of head n tail sprocket assay of 522 chain conveyor, dismantling, fabrication, and erection n alignment of top, side and bottom liners of 522 chain conveyors at main washing plant at rajrappa washery project

Read more
Replacement of worn-out and damaged bucket link assly. 630mm width 52 subset along with front and back guide angle with liners casing liners tail and head sprocket assly. side cover of unit 222 bucket elevator main plant of kedla washery

Replacement of worn-out and damaged bucket link assly. 630mm width 52 subset along with front and back guide angle with liners casing liners tail and head sprocket assly. side cover of unit 222 bucket elevator main plant of kedla washery

Read more
Replacement of worn-out and damaged tail and tail snub pulley along with tail frame (non-drive) arrangement of unit no. 303 belt conveyor and making of 02 nos. frame stand for belting system of main plant at kedla washery.

Replacement of worn-out and damaged tail and tail snub pulley along with tail frame (non-drive) arrangement of unit no. 303 belt conveyor and making of 02 nos. frame stand for belting system of main plant at kedla washery.

Read more
Supply of head sprocket and tail sprocket shaft for chain conveyor

Supply of head sprocket and tail sprocket shaft for chain conveyor

Read more
Rectification/modification of drive base frame arrangement and under feeding hopper after g/box, drive and non-drive pulley dismantling and re-installation, alignment of unit 121aandb belt conveyor main plant of kedla washery.

Rectification/modification of drive base frame arrangement and under feeding hopper after g/box, drive and non-drive pulley dismantling and re-installation, alignment of unit 121aandb belt conveyor main plant of kedla washery.

Read more
Complete repairing of 02sets of damaged and worn-out drive and driven chain sprocket and shaft assly. of 800mm bucket elevator main plant of kedla washery.

Complete repairing of 02sets of damaged and worn-out drive and driven chain sprocket and shaft assly. of 800mm bucket elevator main plant of kedla washery.

Read more
Complete replacement of worn-out and damaged liner plate in discharge chute of unit no. 303,304 and 307 belt conveyor of main plant at kedla washery

Complete replacement of worn-out and damaged liner plate in discharge chute of unit no. 303,304 and 307 belt conveyor of main plant at kedla washery

Read more
Re-handling of spilled coal around 303 and 304 belt conveyor, tail end gallery and head end and 307 and 308 shuttle conveyor main plant of kedla washery.

Re-handling of spilled coal around 303 and 304 belt conveyor, tail end gallery and head end and 307 and 308 shuttle conveyor main plant of kedla washery.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise