Tender Details
Particulars | Details |
---|---|
Title |
Independent Engineer Services For Supervision Of Development Of Ropeway Between Kamakhya Railway Station To Near Kamakhya Temple In Kamrup Metro District, Guwahati In The State Of Assam On Hybrid Annuity Mode.
|
Description |
Independent Engineer Services For Supervision Of Development Of Ropeway Between Kamakhya Railway Station To Near Kamakhya Temple In Kamrup Metro District, Guwahati In The State Of Assam On Hybrid Annuity Mode.
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id | 2025_NHAI_231204_1 |
Reference Number |
NHLML-ROPE0INDE(KMKY)/1/2025 |
Tender Fee | 5900 |
EMD | 0 |
Tender Value | |
Place | NHLML |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=260866 |
Start Date | March 25, 2025 23:30 |
End Date |
08/05/2025 ( Expired 27 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Independent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode
Independent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode.
Read moreConstruction of 2-lane rob near lc-80 at railway km 107/140 between bhagega - neem ka thana station on rpc section (on sh-37b) neemkathana bypass near agawadi (job no. crif/1013/rj/2022-23)(epc mode), on epc mode in district sikar
Construction of 2-lane rob near lc-80 at railway km 107/140 between bhagega - neem ka thana station on rpc section (on sh-37b) neemkathana bypass near agawadi (job no. crif/1013/rj/2022-23)(epc mode), on epc mode in district sikar
Read moreIndependent engineering services for operation and maintenance of churhat bypass section including tunnel on rewa-sidhi section of nh 75e from ch. 33.200 to ch. 55.400 design length 15.350 km. in the state of mp on hybrid annuity mode.
Independent engineering services for operation and maintenance of churhat bypass section including tunnel on rewa-sidhi section of nh 75e from ch. 33.200 to ch. 55.400 design length 15.350 km. in the state of mp on hybrid annuity mode.
Read moreIe services for construction of new six lane access controlled capital region ring road from rameswar (nh16) to gobindpur package ii from design ch. km. 40.700 to km. 70.995 in the state of odisha under nh(o) on hybrid annuity mode.
Ie services for construction of new six lane access controlled capital region ring road from rameswar (nh16) to gobindpur package ii from design ch. km. 40.700 to km. 70.995 in the state of odisha under nh(o) on hybrid annuity mode.
Read moreIe services for construction of new six lane access controlled capital region ring road from gobindpur (nh 55) to tangi from km. 70.995 to km. 111.325 in the state of odisha under nh(o) on hybrid annuity mode (package 3)
Ie services for construction of new six lane access controlled capital region ring road from gobindpur (nh 55) to tangi from km. 70.995 to km. 111.325 in the state of odisha under nh(o) on hybrid annuity mode (package 3)
Read moreIe services for construction of new six lane access controlled capital region ring road from rameshwar (nh 16) to bilipada from km. 0.000 to km. 40.700 in the state of odisha under nh(o) on hybrid annuity mode (package 1)
Ie services for construction of new six lane access controlled capital region ring road from rameshwar (nh 16) to bilipada from km. 0.000 to km. 40.700 in the state of odisha under nh(o) on hybrid annuity mode (package 1)
Read moreConstruction of new 6 lane capital region ring road (crrr) from gobindpur near kuspangi (nh 42) to tangi near bandalo toll palza (nh 16) (km. 70.540 to km. 110.870) on hybrid annuity mode in the state of odisha
Construction of new 6 lane capital region ring road (crrr) from gobindpur near kuspangi (nh 42) to tangi near bandalo toll palza (nh 16) (km. 70.540 to km. 110.870) on hybrid annuity mode in the state of odisha
Read moreIndependent engineering services for construction of four lane from sahebganj (design.ch. km 44.650) to areraj (design.ch. km. 82.200) section of nh139w in the state of bihar on hybrid annuity mode.
Independent engineering services for construction of four lane from sahebganj (design.ch. km 44.650) to areraj (design.ch. km. 82.200) section of nh139w in the state of bihar on hybrid annuity mode.
Read moreIndependent engineering services for construction of four laning of areraj-bettiah starting from areraj (0.500) near sh-54 and terminating near village gurwalia biswas (41.080) at nh-727 of nh-139w in the state of bihar on ham mode
Independent engineering services for construction of four laning of areraj-bettiah starting from areraj (0.500) near sh-54 and terminating near village gurwalia biswas (41.080) at nh-727 of nh-139w in the state of bihar on ham mode
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreof your Industry type