Tender Details
Particulars | Details |
---|---|
Title |
Strengthening And Periodic Renewal/Maintenance Of National Highway Pathankot Mandi Nh 154 Section From Km . 165.000 To Km. 175.000 Of Chauntra (At Km. 140.625) To Padhar (At Km. 180.000) Of Package 4 In The State Of Himachal Pradesh In Item Rate
|
Description |
Strengthening And Periodic Renewal/Maintenance Of National Highway Pathankot Mandi Nh 154 Section From Km . 165.000 To Km. 175.000 Of Chauntra (At Km. 140.625) To Padhar (At Km. 180.000) Of Package 4 In The State Of Himachal Pradesh In Item Rate
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id | 2025_NHAI_227095_1 |
Reference Number |
NHAI/RO/HP/TENDERS/24-25/18 |
Tender Fee | 10000 |
EMD | 0 |
Tender Value | |
Place | Palampur |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=254852 |
Start Date | February 17, 2025 23:30 |
End Date |
10/03/2025 ( Expired 41 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Renewal of the wearing surface of the road pavement from km 368.147 to km 421.196 of dindigul - samayanallur section of nh-44 in the state of tamil nadu on item rate basis at the risk and cost of concessionaire
Renewal of the wearing surface of the road pavement from km 368.147 to km 421.196 of dindigul - samayanallur section of nh-44 in the state of tamil nadu on item rate basis at the risk and cost of concessionaire
Read moreStrengthening from km. 236 to 254 of nh 05 in the state of himachal pradesh
Strengthening from km. 236 to 254 of nh 05 in the state of himachal pradesh
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreDesign, supply and installation of highway lighting at 17 locations on krishnagiri to walajahpet section of nh-48 (old nh-46) in the state of tamil nadu on an item rate (percentage) basis
Design, supply and installation of highway lighting at 17 locations on krishnagiri to walajahpet section of nh-48 (old nh-46) in the state of tamil nadu on an item rate (percentage) basis
Read moreIe for development of 4 lane economic corridor from before mayurakshi bridge approach to moregram section km 180.000 to km 230.957 of nh 116a (package 5) in the state of west bengal under bharatmala pariyojana on hybrid annuity mode
Ie for development of 4 lane economic corridor from before mayurakshi bridge approach to moregram section km 180.000 to km 230.957 of nh 116a (package 5) in the state of west bengal under bharatmala pariyojana on hybrid annuity mode
Read moreMonsoon preparedness works and restoration works for maintenance of pathankot mandi national highway section of nh-154 in package iv from chauntra at km. 140.625 to padhar at km. 180.000 in the state of himachal pradesh on item rate percentage
Monsoon preparedness works and restoration works for maintenance of pathankot mandi national highway section of nh-154 in package iv from chauntra at km. 140.625 to padhar at km. 180.000 in the state of himachal pradesh on item rate percentage
Read moreMonsoon preparednes and restoration works for maintenance of pathankot mandi national highway section of nh-154 in package iib (from rajol at km. 72.000 to thanpuri at km. 85.135) and package iii (from parour at km. 100.840 to chauntra at km. 140.6
Monsoon preparednes and restoration works for maintenance of pathankot mandi national highway section of nh-154 in package iib (from rajol at km. 72.000 to thanpuri at km. 85.135) and package iii (from parour at km. 100.840 to chauntra at km. 140.6
Read morePeriodic overlay and strengthening of pavement from km 175 to km 252 of kashipur sitarganj section of nh 74 in the state of uttar pradesh and uttarakhand on item rate percentage basis
Periodic overlay and strengthening of pavement from km 175 to km 252 of kashipur sitarganj section of nh 74 in the state of uttar pradesh and uttarakhand on item rate percentage basis
Read moreConstruction of uni-directional grade separated structure with slip service roads (km. 247 00 to km 248 679)(jhiri chowk on of bajaura bypass) on existing 4 lane of takoli-kullu section of nh-3 in the state of himachal pradesh on epc mode
Construction of uni-directional grade separated structure with slip service roads (km. 247 00 to km 248 679)(jhiri chowk on of bajaura bypass) on existing 4 lane of takoli-kullu section of nh-3 in the state of himachal pradesh on epc mode
Read moreConstruction of two lane with paved shoulder from design km 0.000 near hiwarkhedi village junction on nh-47 to design km 45.440 near basinda village section of nh-347b of betul-khandwa package 1 in the state of madhya pradesh on ham.
Construction of two lane with paved shoulder from design km 0.000 near hiwarkhedi village junction on nh-47 to design km 45.440 near basinda village section of nh-347b of betul-khandwa package 1 in the state of madhya pradesh on ham.
Read moreof your Industry type