Strengthening And Periodic Renewal/Maintenance Of National Highway Pathankot Mandi Nh 154 Section From Km . 165.000 To Km. 175.000 Of Chauntra (At Km. 140.625) To Padhar (At Km. 180.000) Of Package 4 In The State Of Himachal Pradesh In Item Rate
Description
Strengthening And Periodic Renewal/Maintenance Of National Highway Pathankot Mandi Nh 154 Section From Km . 165.000 To Km. 175.000 Of Chauntra (At Km. 140.625) To Padhar (At Km. 180.000) Of Package 4 In The State Of Himachal Pradesh In Item Rate
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id 2025_NHAI_227095_1
Reference
Number
NHAI/RO/HP/TENDERS/24-25/18
Tender Fee 10000
EMD 0
Tender Value
Place Palampur
Link https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=254852
Start Date February 17, 2025 23:30
End Date

10/03/2025 ( Expired 41 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Renewal of the wearing surface of the road pavement from km 368.147 to km 421.196 of dindigul - samayanallur section of nh-44 in the state of tamil nadu on item rate basis at the risk and cost of concessionaire

Renewal of the wearing surface of the road pavement from km 368.147 to km 421.196 of dindigul - samayanallur section of nh-44 in the state of tamil nadu on item rate basis at the risk and cost of concessionaire

Read more
Strengthening from km. 236 to 254 of nh 05 in the state of himachal pradesh

Strengthening from km. 236 to 254 of nh 05 in the state of himachal pradesh

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Design, supply and installation of highway lighting at 17 locations on krishnagiri to walajahpet section of nh-48 (old nh-46) in the state of tamil nadu on an item rate (percentage) basis

Design, supply and installation of highway lighting at 17 locations on krishnagiri to walajahpet section of nh-48 (old nh-46) in the state of tamil nadu on an item rate (percentage) basis

Read more
Ie for development of 4 lane economic corridor from before mayurakshi bridge approach to moregram section km 180.000 to km 230.957 of nh 116a (package 5) in the state of west bengal under bharatmala pariyojana on hybrid annuity mode

Ie for development of 4 lane economic corridor from before mayurakshi bridge approach to moregram section km 180.000 to km 230.957 of nh 116a (package 5) in the state of west bengal under bharatmala pariyojana on hybrid annuity mode

Read more
Monsoon preparedness works and restoration works for maintenance of pathankot mandi national highway section of nh-154 in package iv from chauntra at km. 140.625 to padhar at km. 180.000 in the state of himachal pradesh on item rate percentage

Monsoon preparedness works and restoration works for maintenance of pathankot mandi national highway section of nh-154 in package iv from chauntra at km. 140.625 to padhar at km. 180.000 in the state of himachal pradesh on item rate percentage

Read more
Monsoon preparednes and restoration works for maintenance of pathankot mandi national highway section of nh-154 in package iib (from rajol at km. 72.000 to thanpuri at km. 85.135) and package iii (from parour at km. 100.840 to chauntra at km. 140.6

Monsoon preparednes and restoration works for maintenance of pathankot mandi national highway section of nh-154 in package iib (from rajol at km. 72.000 to thanpuri at km. 85.135) and package iii (from parour at km. 100.840 to chauntra at km. 140.6

Read more
Periodic overlay and strengthening of pavement from km 175 to km 252 of kashipur sitarganj section of nh 74 in the state of uttar pradesh and uttarakhand on item rate percentage basis

Periodic overlay and strengthening of pavement from km 175 to km 252 of kashipur sitarganj section of nh 74 in the state of uttar pradesh and uttarakhand on item rate percentage basis

Read more
Construction of uni-directional grade separated structure with slip service roads (km. 247 00 to km 248 679)(jhiri chowk on of bajaura bypass) on existing 4 lane of takoli-kullu section of nh-3 in the state of himachal pradesh on epc mode

Construction of uni-directional grade separated structure with slip service roads (km. 247 00 to km 248 679)(jhiri chowk on of bajaura bypass) on existing 4 lane of takoli-kullu section of nh-3 in the state of himachal pradesh on epc mode

Read more
Construction of two lane with paved shoulder from design km 0.000 near hiwarkhedi village junction on nh-47 to design km 45.440 near basinda village section of nh-347b of betul-khandwa package 1 in the state of madhya pradesh on ham.

Construction of two lane with paved shoulder from design km 0.000 near hiwarkhedi village junction on nh-47 to design km 45.440 near basinda village section of nh-347b of betul-khandwa package 1 in the state of madhya pradesh on ham.