Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Cs For Preparation Of Dpr For Upgradation To 4 Lane/2 L Plus Ps Of Parour To Chauntra From Km 100.840 To Km 140.625 And Chauntra To Padhar From Km 140.625 To Km 180.00 Of Pathankot Mandi Section Of Nh154 In Himachal Pradesh Through Bot/Ham/Epc Mode
|
Description |
Cs For Preparation Of Dpr For Upgradation To 4 Lane/2 L Plus Ps Of Parour To Chauntra From Km 100.840 To Km 140.625 And Chauntra To Padhar From Km 140.625 To Km 180.00 Of Pathankot Mandi Section Of Nh154 In Himachal Pradesh Through Bot/Ham/Epc Mode
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id | 2025_NHAI_229449_1 |
Reference Number |
NHAI/Tech/HP/DPR/ Pathankot Mandi/2025/3rd call |
Tender Fee | 5000 |
EMD | 0 |
Tender Value | |
Place | NHAI HQ |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=258218 |
Start Date | March 11, 2025 00:00 |
End Date |
23/04/2025 ( Expired 76 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for preparation of dpr for i. widening to 2l ps of balance reaches km 184.840 to km 190.00 and km 194.840 to 198.800, ii. construction of additional vent to existing major bridge at km 210.0 to 2 of nizamabad to jagdalpur nh 63
Consultancy services for preparation of dpr for i. widening to 2l ps of balance reaches km 184.840 to km 190.00 and km 194.840 to 198.800, ii. construction of additional vent to existing major bridge at km 210.0 to 2 of nizamabad to jagdalpur nh 63
Read moreIndependent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode
Independent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode.
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode.
Read moreUpgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
Upgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
Read moreRehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Read moreConsultancy services for ae for supervision of construction of missing link from birhu to lathiani into 4 lane from km 35.550 to km 42.800 on nh-503a including cable stayed bridge (0.860 km) in himachal pradesh on epc mode.
Consultancy services for ae for supervision of construction of missing link from birhu to lathiani into 4 lane from km 35.550 to km 42.800 on nh-503a including cable stayed bridge (0.860 km) in himachal pradesh on epc mode.
Read moreConsultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode
Consultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode
Read moreConstruction of road kibithu kundao from km 0.000 to km 52.000 design length 0.000 to 19.557 kms green field alignment to nhsl specifications under project udayak in anjaw district of arunachal pradesh state on epc mode
Construction of road kibithu kundao from km 0.000 to km 52.000
 design length 0.000 to 19.557 kms green field alignment to nhsl
 specifications under project udayak in anjaw district of arunachal
 pradesh state on epc mode
Read moreRfp for construction of 4 lane jaunpur bypass from km 80.220 to km 107.780 of nh 135a pkg i (jaunpur akbarpur section) in the state of uttar pradesh on ham mode.
Rfp for construction of 4 lane jaunpur bypass from km 80.220 to km 107.780 of nh 135a pkg i (jaunpur akbarpur section) in the state of uttar pradesh on ham mode.
Read moreUpgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Read moreof your Industry type