Tender Details
Particulars | Details |
---|---|
Title |
Ttps Mech Ii Tm I Unit I Removal Of Deteriorated Cladding Over The Inner Surface Of Condenser East West Cooling Water Inlet Spool Piece And Outlet Bends And Rebuild The Cladding With Special Epoxy Putties To The Required Level Including Cost Of Mater
|
Description |
Ttps Mech Ii Tm I Unit I Removal Of Deteriorated Cladding Over The Inner Surface Of Condenser East West Cooling Water Inlet Spool Piece And Outlet Bends And Rebuild The Cladding With Special Epoxy Putties To The Required Level Including Cost Of Mater
|
Organisation | Government of Tamil Nadu |
Tender Id | 2023_EB_344561_1 |
Reference Number |
SE/M-II /TTPS/ No.246/2023-24 |
Tender Fee | 0 |
EMD | 2300 |
Tender Value | |
Place | O/o SE M II / TTPS |
Link | https://tntenders.gov.in |
Start Date | July 15, 2023 23:30 |
End Date |
31/07/2023 ( Expired 678 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ttps mechii tm i uniti removal of deteriorated cladding over the surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mate
Ttps mechii tm i uniti removal of deteriorated cladding over the surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mate
Read moreTtps mech ii tm i unit iii removal of deteriorated cladding over the surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mat
Ttps mech ii tm i unit iii removal of deteriorated cladding over the surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mat
Read moreTtps mech ii tm i unit iii conducting tube cleaning in the surface of the condenser for its entire 10 02m length using a flexible hose fitted with nylon brush and fine water tube jet arrangement subsequent jet cleaning during annual overhaul
Ttps mech ii tm i unit iii conducting tube cleaning in the surface of the condenser for its entire 10 02m length using a flexible hose fitted with nylon brush and fine water tube jet arrangement subsequent jet cleaning during annual overhaul
Read moreTtps mech ii bm unit iii removal and relaying of insulation with cladding sheet in unit iii esp flue gas inlet duct outlet duct esp hoppers for the year 2024 2025
Ttps mech ii bm unit iii removal and relaying of insulation with cladding sheet in unit iii esp flue gas inlet duct outlet duct esp hoppers for the year 2024 2025
Read moreTtps mech ii tm i unit ii removal of deteriorated cladding over the surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mate
Ttps mech ii tm i unit ii removal of deteriorated cladding over the surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mate
Read moreTtps mech ii tm i units i ii iii conducting tube cleaning in the inner surface of the condenser for its entire 10 02m length using a flexible hose fitted with nylon brush and fine water tube jet arrangement whenever condenser vacuum from 1 4 24 to 31
Ttps mech ii tm i units i ii iii conducting tube cleaning in the inner surface of the condenser for its entire 10 02m length using a flexible hose fitted with nylon brush and fine water tube jet arrangementwhenever condenservacuum from 1 4 24 31 3 25
Read moreTtps mech ii tm i unit i removal of deteriorated cladding over the inner surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mater
Ttps mech ii tm i unit i removal of deteriorated cladding over the inner surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mater
Read moreTtps mech ii tm i unit i conducting tube cleaning in the inner surface of the condenser for its entire 10 02m length using a flexible hose fitted with nylon brush and fine water tube jet arrangement subsequent jet cleaning during the forthcoming an
Ttps mech ii tm i unit i conducting tube cleaning in the inner surface of the condenser for its entire 10 02m length using a flexible hose fitted with nylon brush and fine water tube jet arrangement subsequent jet cleaning during the forthcoming an
Read moreNctps i se mi circle aoh 23 24 tm dn unit i removal of deteriorated cladding from the inner surface of entire condenser
Nctps i se mi circle aoh 23 24 tm dn unit i removal of deteriorated cladding from the inner surface of entire condenser water box front and rear side l r and rebuild the entire area in front and rear side, with loctite fix master superior metal paste
Read moreTtps mech ii tm ii unit iv inspection and rectification of epoxy cladding over the condenser east west front side tube sheet and water box in the reduced thickness area rebuild the claddings with special epoxy putties ie average 4 5 mm to be built
Ttps mech ii tm ii unit iv inspection and rectification of epoxy cladding over the condenser east west front side tube sheet and water box in the reduced thickness area rebuild the claddings with special epoxy putties ie average 4 5 mm to be built
Read moreof your Industry type