Tender Details

Particulars Details
Title
Ttps Mech Ii Tm I Unit I Removal Of Deteriorated Cladding Over The Surface Of Condenser East West Cooling Water Inlet Spool Piece And Outlet Bends And Rebuild The Cladding With Special Epoxy Putties To The Required Level Including Cost Of Mate
Description
Ttps Mech Ii Tm I Unit I Removal Of Deteriorated Cladding Over The Surface Of Condenser East West Cooling Water Inlet Spool Piece And Outlet Bends And Rebuild The Cladding With Special Epoxy Putties To The Required Level Including Cost Of Mate
Organisation TNEB Limited | State Govt. and UT
Tender Id 2024_EB_461072_1
Reference
Number
CE/TTPS/SE/M-II/No.337/2024-25
Tender Fee 0
EMD 2100
Tender Value
Place TTPS
Link
View Original Tender Notice

https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=547995

Start Date July 06, 2024 23:30
End Date
Expired 22/07/2024

Expired 699 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Ttps mech ii tm i unit ii removal of deteriorated cladding over the surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mate

Ttps mech ii tm i unit ii removal of deteriorated cladding over the surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mate

Read more
Ttps mech ii tm i unit iii removal of deteriorated cladding over the surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mat

Ttps mech ii tm i unit iii removal of deteriorated cladding over the surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mat

Read more
Ttps mech ii tm i unit i removal of deteriorated cladding over the inner surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mater

Ttps mech ii tm i unit i removal of deteriorated cladding over the inner surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mater

Read more
Ttps mech ii tm i unit iii removal of deteriorated cladding over the surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mat

Ttps mech ii tm i unit iii removal of deteriorated cladding over the surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mat

Read more
Ttps mech ii tm ii unit v inspection and rectification of epoxy cladding over the condenser water box and tube sheet east and west and rebuild the cladding with special epoxy putties ie average 4.5mm thick to be built up in the peeled off area of co

Ttps mech ii tm ii unit v inspection and rectification of epoxy cladding over the condenser water box and tube sheet east and west and rebuild the cladding with special epoxy putties ie average 4.5mm thick to be built up in the peeled off area of co

Read more
Ttps mech ii tm ii unit iv inspection and rectification of epoxy cladding over the condenser water box and tube sheet east and west and rebuild the cladding with special epoxy putties ie average 4 5mm thick to be built up in the peeled off area of c

Ttps mech ii tm ii unit iv inspection and rectification of epoxy cladding over the condenser water box and tube sheet east and west and rebuild the cladding with special epoxy putties ie average 4 5mm thick to be built up in the peeled off area of c

Read more
Ttps mech ii tm ii unit iv inspection and rectification of epoxy cladding over the condenser east west front side tube sheet and water box in the reduced thickness area rebuild the claddings with special epoxy putties ie average 4 5 mm to be built

Ttps mech ii tm ii unit iv inspection and rectification of epoxy cladding over the condenser east west front side tube sheet and water box in the reduced thickness area rebuild the claddings with special epoxy putties ie average 4 5 mm to be built

Read more
Ttps mii tm ii unit iv inspection and rectification of epoxy cladding over the condenser east west front side tube sheet and water box in the reduced thickness area rebuild the claddings with special epoxy putties ie average 4 5 mm to be built up to

Ttps mii tm ii unit iv inspection and rectification of epoxy cladding over the condenser east west front side tube sheet and water box in the reduced thickness area rebuild the claddings with special epoxy putties ie average 4 5 mm to be built up to

Read more
Ttps mechii bm unit iv removal and relaying of insulation with cladding sheet in unit iv esp flue gas inlet duct outlet duct for the year 2024 2025

Ttps mechii bm unit iv removal and relaying of insulation with cladding sheet in unit iv esp flue gas inlet duct outlet duct for the year 2024 2025

Read more
Nctps i se mi circle aoh 23 24 tm dn unit i removal of deteriorated cladding from the inner surface of entire condenser

Nctps i se mi circle aoh 23 24 tm dn unit i removal of deteriorated cladding from the inner surface of entire condenser water box front and rear side l r and rebuild the entire area in front and rear side, with loctite fix master superior metal paste

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise