Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ttps Mech Ii Tm I Unit I Removal Of Deteriorated Cladding Over The Surface Of Condenser East West Cooling Water Inlet Spool Piece And Outlet Bends And Rebuild The Cladding With Special Epoxy Putties To The Required Level Including Cost Of Mate
|
| Description |
Ttps Mech Ii Tm I Unit I Removal Of Deteriorated Cladding Over The Surface Of Condenser East West Cooling Water Inlet Spool Piece And Outlet Bends And Rebuild The Cladding With Special Epoxy Putties To The Required Level Including Cost Of Mate
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_461072_1 |
|
Reference Number |
CE/TTPS/SE/M-II/No.337/2024-25 |
| Tender Fee | 0 |
| EMD | 2100 |
| Tender Value | - |
| Place | TTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=547995 |
| Start Date | July 06, 2024 23:30 |
| End Date |
Expired
22/07/2024
Expired 777 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ttps mech ii tm i unit ii removal of deteriorated cladding over the surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mate
Ttps mech ii tm i unit ii removal of deteriorated cladding over the surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mate
Read moreTtps mech ii tm i unit iii removal of deteriorated cladding over the surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mat
Ttps mech ii tm i unit iii removal of deteriorated cladding over the surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mat
Read moreTtps mech ii tm i unit i removal of deteriorated cladding over the inner surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mater
Ttps mech ii tm i unit i removal of deteriorated cladding over the inner surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mater
Read moreTtps mech ii tm i unit iii removal of deteriorated cladding over the surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mat
Ttps mech ii tm i unit iii removal of deteriorated cladding over the surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mat
Read moreTtps mech ii tm ii unit v inspection and rectification of epoxy cladding over the condenser water box and tube sheet east and west and rebuild the cladding with special epoxy putties ie average 4.5mm thick to be built up in the peeled off area of co
Ttps mech ii tm ii unit v inspection and rectification of epoxy cladding over the condenser water box and tube sheet east and west and rebuild the cladding with special epoxy putties ie average 4.5mm thick to be built up in the peeled off area of co
Read moreTtps mech ii tm ii unit iv inspection and rectification of epoxy cladding over the condenser water box and tube sheet east and west and rebuild the cladding with special epoxy putties ie average 4 5mm thick to be built up in the peeled off area of c
Ttps mech ii tm ii unit iv inspection and rectification of epoxy cladding over the condenser water box and tube sheet east and west and rebuild the cladding with special epoxy putties ie average 4 5mm thick to be built up in the peeled off area of c
Read moreTtps mech ii tm ii unit iv inspection and rectification of epoxy cladding over the condenser east west front side tube sheet and water box in the reduced thickness area rebuild the claddings with special epoxy putties ie average 4 5 mm to be built
Ttps mech ii tm ii unit iv inspection and rectification of epoxy cladding over the condenser east west front side tube sheet and water box in the reduced thickness area rebuild the claddings with special epoxy putties ie average 4 5 mm to be built
Read moreTtps mechii tm i uniti condenser repairing and arresting the leak points in the longitudinal bellows and side walls of lpt exhaust hood during annual overhaul 2024 2025
Ttps mechii tm i uniti condenser repairing and arresting the leak points in the longitudinal bellows and side walls of lpt exhaust hood during annual overhaul 2024 2025
Read moreTtps mii tm ii unit iv inspection and rectification of epoxy cladding over the condenser east west front side tube sheet and water box in the reduced thickness area rebuild the claddings with special epoxy putties ie average 4 5 mm to be built up to
Ttps mii tm ii unit iv inspection and rectification of epoxy cladding over the condenser east west front side tube sheet and water box in the reduced thickness area rebuild the claddings with special epoxy putties ie average 4 5 mm to be built up to
Read moreTtps mechii bm unit i replacement of boiler pressure parts tubes bends in i pass of unit i boiler during the year 2024 2025
Ttps mechii bm unit i replacement of boiler pressure parts tubes bends in i pass of unit i boiler during the year 2024 2025
Read moreof your Industry type