Tender Details
Particulars | Details |
---|---|
Title |
Plan Cheramangalam Scheme 2024 25 Improvements And Urgent Rectification Work To Main Canal Ch10400 To 10515 Km, Breached Portion Of 16 A Branch Side Wall 0 575 To 0 600
|
Description |
Plan Cheramangalam Scheme&Amp#X0d
2024 25 Improvements And Urgent&Amp#X0d
Rectification Work To Main Canal Ch10400 To&Amp#X0d
10515 Km, Breached Portion Of 16 A Branch&Amp#X0d
Side Wall 0 575 To 0 600 &Amp#X0d
|
Organisation | Irrigation Department | State Govt. and UT |
Tender Id | 2025_Irrig_747606_1 |
Reference Number |
IRR/PI/TR/2828/2024_5_7_6/1 |
Tender Fee | 2005 |
EMD | 22710 |
Tender Value | |
Place | ALATHUR |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1208039 |
Start Date | March 07, 2025 22:30 |
End Date |
14/03/2025 ( Expired 38 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of protection wall and protective mesh for tunnel shaft, resectioning of canal from 0 to 26 km, protection wall/bund for jankapur tank on ghodazari branch canal.
Construction of protection wall and protective mesh for tunnel shaft, resectioning of canal from 0 to 26 km, protection wall/bund for jankapur tank on ghodazari branch canal.
Read moreSub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district
Sub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district
Read moreBalance earth work from km. 0.00 to 2.300 and construction of head regulator of ichauli minor-ist off taking form km. 19.700 of kabrai main canal.
Balance earth work from km. 0.00 to 2.300 and construction of head regulator of ichauli minor-ist off taking form km. 19.700 of kabrai main canal.
Read moreVkv/2024/259 c/o geometrical improvement of road from main road to village rakharara hppwd division kotla behar and sub division dada siba(sh c/o r/wall from rd 0/460 to 0/478 with cc and wire crate) deposit work
Vkv/2024/259 c/o geometrical improvement of road from main road to village rakharara hppwd division kotla behar and sub division dada siba(sh c/o r/wall from rd 0/460 to 0/478 with cc and wire crate) deposit work
Read moreWidening of service road in mettupalayam side approach of periyanaickenpalayam flyover including land acquisition from km.31/600 to 32/000 of nh-181 (coimbatore - ootty - gundlupet road) - on epc basis contract under annual plan 2024-25 in the stat
Widening of service road in mettupalayam side approach of periyanaickenpalayam flyover including land acquisition from km.31/600 to 32/000 of nh-181 (coimbatore - ootty - gundlupet road) - on epc basis contract under annual plan 2024-25 in the stat
Read moreWidening from sl to dl and improvements at km 4/0 - 8/6 of puthanchanthai - kondampatty - musiri road including construction and reconstruction of culverts and construction of retaining and protective wall
Widening from sl to dl and improvements at km 4/0 - 8/6 of puthanchanthai - kondampatty - musiri road including construction and reconstruction of culverts and construction of retaining and protective wall
Read morePothundy project - 2024 - 25 - rectification works between ch . 3/100 km and 3/ 160km of kairady branch canal
The work is proposed for the urgent&#x0d rectification of kairady branch canal
Read moreSub-work:-hiring of private vehicle for the purpose of inspection of the works in (rb) sub-division, chandragiri for the year 2024-25 from 01.08.2024 to 31.03.2025 under the main work of improvements of riding surface of piler-bhakarapeta road via yellamanda km.16/0 to 37/0 in tirupati district(3rd call)
Sub-work:-hiring of private vehicle for the purpose of inspection of the works in (rb) sub-division, chandragiri for the year 2024-25 from 01.08.2024 to 31.03.2025 under the main work of improvements of riding surface of piler-bhakarapeta road via yellamanda km.16/0 to 37/0 in tirupati district(3rd call)
Read moreGeneral-annual plan 2024-25-rlis canal maintenance and extention of chaligadha li scheme in mananthavady municipality,la mananthavadi,wayanad district-general civil work
General-annual plan 2024-25-rlis canal&#x0d maintenance and extention of chaligadha li&#x0d scheme in mananthavady municipality,la&#x0d mananthavadi,wayanad district-general civil&#x0d work
Read moreConstruction of lining, remaining excavation and other ancillary works between 0 to 18.54 km on branch canal of pentakli project.
Construction of lining, remaining excavation and other ancillary works between 0 to 18.54 km on branch canal of pentakli project.
Read moreof your Industry type