Tender Details

Particulars Details
Title
Const.Of Dry Brick Paved Ra...
Description
Const.Of Dry Brick Paved Rasta From F/O &Amp#X0d Chain Singh To F/O Rishipal Village Gangateri
Organisation Haryana Government | State Govt. and UT
Tender Id 2025_HRY_424180_1
Reference
Number
2025C5D07017 D6B5 45A6 95D4 D10FEB053430703DEV
Tender Fee 2180
EMD 23000
Tender Value -
Place GANGATHERI
Link
View Original Tender Notice

https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=500969

Start Date January 17, 2025 21:30
End Date
Expired 25/01/2025

Expired 581 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Supply of dry grass to sowthadka sri mahaganapathi temple, kokkada belthngady taluk.

Supply of dry grass to sowthadka sri mahaganapathi temple, kokkada belthngady taluk.

Read more
Replacing / rotating , strengthening of dry / wet fly ash conveying line of unit 7-8 ahp

Replacing / rotating , strengthening of dry / wet fly ash conveying line of unit 7-8 ahp

Read more
Dry dock repair of fjb-ii, fjb-ix and fjb-xiii for the year 2026-27

Dry dock repair of fjb-ii, fjb-ix and fjb-xiii for the year 2026-27

Read more
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode

Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode

Read more
Dg ranjangaon growth center. m and r to water supply schemes at ranjangaon. strengthening of bridge walkway, traction and suspender assemblies and flocculation clarifier tank structure etc for clf no. 1 and other misc works at water supply scheme, ra

Dg ranjangaon growth center. m and r to water supply schemes at ranjangaon. strengthening of bridge walkway, traction and suspender assemblies and flocculation clarifier tank structure etc for clf no. 1 and other misc works at water supply scheme, ra

Read more
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years

Design, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years

Read more
Design, build, construct, install adn commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.

Design, build, construct, install adn commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.

Read more
Routine, breakdown maintenance and assistance for operation of pumps and compressors of dust extraction, dust suppression, dry fog dust suppression and tunnel ventilation system of chp unit no3

Routine, breakdown maintenance and assistance for operation of pumps and compressors of dust extraction, dust suppression, dry fog dust suppression and tunnel ventilation system of chp unit no 3

Read more
Design, build, construct, install, and commissioning of material recovery facility (mrf) plant of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years on.(group-01)

Design, build, construct, install, and commissioning of material recovery facility (mrf) plant of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years on.(group-01)

Read more
Design, build, construct, install, and commissioning of material recovery facility (mrf) plant of 25 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode.

Design, build, construct, install, and commissioning of material recovery facility (mrf) plant of 25 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise