Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Const.Of Dry Brick Paved Ra...
|
| Description |
Const.Of Dry Brick Paved Rasta From F/O &Amp#X0d
Chain Singh To F/O Rishipal Village Gangateri
|
| Organisation | Haryana Government | State Govt. and UT |
| Tender Id | 2025_HRY_424180_1 |
|
Reference Number |
2025C5D07017 D6B5 45A6 95D4 D10FEB053430703DEV |
| Tender Fee | 2180 |
| EMD | 23000 |
| Tender Value | - |
| Place | GANGATHERI |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=500969 |
| Start Date | January 17, 2025 21:30 |
| End Date |
Expired
25/01/2025
Expired 581 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of dry grass to sowthadka sri mahaganapathi temple, kokkada belthngady taluk.
Supply of dry grass to sowthadka sri mahaganapathi temple, kokkada belthngady taluk.
Read moreReplacing / rotating , strengthening of dry / wet fly ash conveying line of unit 7-8 ahp
Replacing / rotating , strengthening of dry / wet fly ash conveying line of unit 7-8 ahp
Read moreDry dock repair of fjb-ii, fjb-ix and fjb-xiii for the year 2026-27
Dry dock repair of fjb-ii, fjb-ix and fjb-xiii for the year 2026-27
Read moreConsultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read moreDg ranjangaon growth center. m and r to water supply schemes at ranjangaon. strengthening of bridge walkway, traction and suspender assemblies and flocculation clarifier tank structure etc for clf no. 1 and other misc works at water supply scheme, ra
Dg ranjangaon growth center. m and r to water supply schemes at ranjangaon. strengthening of bridge walkway, traction and suspender assemblies and flocculation clarifier tank structure etc for clf no. 1 and other misc works at water supply scheme, ra
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years
Read moreDesign, build, construct, install adn commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.
Design, build, construct, install adn commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.
Read moreRoutine, breakdown maintenance and assistance for operation of pumps and compressors of dust extraction, dust suppression, dry fog dust suppression and tunnel ventilation system of chp unit no3
Routine, breakdown maintenance and assistance for operation of pumps and compressors of dust extraction, dust suppression, dry fog dust suppression and tunnel ventilation system of chp unit no 3
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) plant of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years on.(group-01)
Design, build, construct, install, and commissioning of material recovery facility (mrf) plant of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years on.(group-01)
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) plant of 25 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode.
Design, build, construct, install, and commissioning of material recovery facility (mrf) plant of 25 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode.
Read moreof your Industry type