Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Installation Of 2000 Gpm Pump Motor In Jharna Face Sump And Erection Its Delivery From The Sump To Tanker Filling Point And Extension Of Delivery Of Both The Pump From Kalipahari To River And Maintenance Of Both Pump Of Jharna Face Sump, Ampc.
|
| Description |
Installation Of 2000 Gpm Pump Motor In Jharna Face Sump And Erection Its Delivery From The Sump To Tanker Filling Point And Extension Of Delivery Of Both The Pump From Kalipahari To River And Maintenance Of Both Pump Of Jharna Face Sump, Ampc.
|
| Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
| Tender Id | 2024_BCCL_298500_1 |
|
Reference Number |
BCCL/GM/AR-I/AM (ENM)/E-TENDER/2023-24/474 |
| Tender Fee | 0 |
| EMD | 2300 |
| Tender Value | - |
| Place | AMP COLLIERY BARORA AREA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=309197 |
| Start Date | January 13, 2024 23:30 |
| End Date |
Expired
24/01/2024
Expired 995 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dismanteling of suspension,both side eye repairing by material filling and grinding and fittment of repaired suspension . total of 10 nos suspension for 9 nos running dumpers and 3 nos running water tanker of dakra ocp nk area
Dismanteling of suspension,both side eye repairing by material filling and grinding and fittment of repaired suspension . total of 10 nos suspension for 9 nos running dumpers and 3 nos running water tanker of dakra ocp nk area
Read more(a)shifting of 4000gpm pump of coalface and jharna face sump for 02times with gradual decreasing of water level and(b)dismantling and transporting of 10inch dia mspipe from idle delivery range of jharna face to attendance room premises under ampc
(a)shifting of 4000gpm pump of coalface and jharna face sump for 02times with gradual decreasing of water level 
 and(b)dismantling and transporting of 10inch dia mspipe from idle delivery range of jharna face to attendance room 
 premises under ampc
Read moreShifting 4000gpm and 2000gpm pump west coal face sump with delivery di as per installation place at 1t coal face under abocp mine
Shifting 4000gpm and 2000gpm pump west coal face sump with delivery di as per installation place at 1t coal face under abocp mine
Read moreShifting 4000 gpm and 2000gpm pump west coal face sump with delivery di as per installation place at 1t coal face under abocp mine
Shifting 4000 gpm and 2000gpm pump west coal face sump with delivery di as per installation place at 1t coal face under abocp mine
Read moreShifting of 4000gpm pumpmotor set of jharna sump as and when required (03times) with its pipeline for extraction of coal from the floor of the sump and maintenance of 4000gpm pump of jharna face and purba face and their pipe line of muraidih, ampc.
Shifting of 4000gpm pumpmotor set of jharna sump as and when required (03times) with its pipeline for extraction of coal from the floor of the sump and maintenance of 4000gpm pump of jharna face and purba face and their pipe line of muraidih, ampc.
Read more(a) installation of 4000gpm pump motor in sadbhavna face sump and jointing of its delivery with the existing range and (b) maintenance of 4000gpm pumps of coal face, jharna face and purba face sump under amp colliery.
(a) installation of 4000gpm pump motor in sadbhavna face sump and jointing of its delivery with the existing 
 range and (b) maintenance of 4000gpm pumps of coal face, jharna face and purba face sump under amp colliery.
Read moreReplacing of b/d 4000gpm pump motor set by 2000gpm pump motor set of jharna face sump along with diversion of its delivery line in safe and suitable route for safety purpose at muraidih, amp colliery.
Replacing of b/d 4000gpm pump motor set by 2000gpm pump motor set of jharna face sump along with diversion of its delivery line in safe and suitable route for safety purpose at muraidih, amp colliery.
Read moreRecovery of 10inch dia m.s.pipe of idle 2nd and 3rd range of jharna face sump from the top bench of the sump to tanker filling point and transporting the pipes to attendance room premises and other miscellaneous jobs under amp colliery.
Recovery of 10inch dia m.s.pipe of idle 2nd and 3rd range of jharna face sump from the top bench of the sump to 
 tanker filling point and transporting the pipes to attendance room premises and other miscellaneous jobs under amp colliery.
Read moreDismantling, extension and di of 6.6kv o/h line in different location i.e.purba face,jharna face sump and silo side for uninterrupted power supply to domestic water supply pump and advancement of ob face in silo side under muraidih, ampc.
Dismantling, extension and di of 6.6kv o/h line in different location i.e.purba face,jharna face sump and 
 silo side for uninterrupted power supply to domestic water supply pump and advancement of ob face in silo side 
 under muraidih, ampc.
Read moreInstallation of 2000gpm pump of main coal face sump and erection its delivery to barora durga mandir and jointing with the existing range to barora village and chitahi basti as well as supplying of water to barora workers colony of muraidih, ampc.
Installation of 2000gpm pump of main coal face sump and erection its delivery to barora durga mandir and jointing with the existing range to barora village and chitahi basti as well as supplying of water to barora workers colony of muraidih, ampc.
Read moreof your Industry type