Tender Details

Particulars Details
Title
Improvement Of Water Detention Structure With Allied Structure Of Nafarkata Bandh
Description
Improvement Of Water Detention Structure With Allied Structure Of Nafarkata Bandh At Mouza Narasanda, J.L. No. 01,Plot No 11, Under Batikar Gram Panchayet Within Illambazar Panchayet Wsamity In The District Birbhum Under Jalatirtha (Phase Ix) Prog
Organisation WATER RESOURCES DEV. DTE. | State Govt. and UT
Tender Id 2024_WRDD_676007_1
Reference
Number
WRDD/BDNAID/05/2023-24/Gr.B 2nd Call of E.E AI BURDWAN
Tender Fee 0
EMD 1.27 Lakh
Tender Value
Place Birbhum
Link
View Original Tender Notice

https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1470164

Start Date February 29, 2024 23:30
End Date
Expired 13/03/2024

Expired 861 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Development of ujjain airport, ujjain madhya pradesh. sh detailed designing engineering, procurement and construction of new domestic terminal building and allied works

Development of ujjain airport, ujjain, madhya pradesh. sh detailed designing, engineering, procurement and construction of new domestic terminal building and allied works

Read more
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp

Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Read more
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.

Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.

Read more
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Read more
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Read more
Improvement of water detention structure with allied structure of deni bandh wds

Improvement of water detention structure with allied structure of deni bandh wds at mouza-bogasola, j.l. no. -133 plot no 3889, under panchra gram panchayet within khoyrasole panchayet samity in the district birbhum under jalatirtha(phase-ix) program

Read more
Improvement of water detention structure with allied structure of nafarkata bandh at mouza - narasanda

Improvement of water detention structure with allied structure of nafarkata bandh at mouza - narasanda, j.l. no. -01, plot no 11, under batikar gram panchayet within illambazar panchayet wsamity in the district birbhum under jalatirtha (phase-ix) pr

Read more
Improvement of water detention structure with allied structure of tentul bandh wds

Improvement of water detention structure with allied structure of tentul bandh wds at mouza-kuldiha, j.l. no.-53 plot no 1916,under malandighi gram panchayet within kanksa panchayet samity in the district of paschim bardhaman under matir sristi pr

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise