Tender Details
Particulars | Details |
---|---|
Title |
Repairing / Reconditioning Of Damaged / Worn Out Teeth Of 2 Nos. 3rd Intermediate Gear Wheel (53 Nos. Teeth In Each Gear Wheel) Part No. 4106002554 Of Propel Gear Box Of Be 195 Shovel, Working At Bina Project
|
Description |
Repairing / Reconditioning Of Damaged / Worn Out Teeth Of 2 Nos. 3rd Intermediate Gear Wheel (53 Nos. Teeth In Each Gear Wheel) Part No. 4106002554 Of Propel Gear Box Of Be 195 Shovel, Working At Bina Project
|
Organisation | Northern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_NCL_312474_1 |
Reference Number |
Bina/SO(Excv)/Tender/24-25/20 dt 12.07.2024 |
Tender Fee | 0 |
EMD | 1300 |
Tender Value | |
Place | Bina Project, NCL |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=323826 |
Start Date | July 13, 2024 14:30 |
End Date |
23/07/2024 ( Expired 293 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repairing/rebuilding and line boring of 08 nos. cracked/ worn out lift cylinder rear pin housing (02 nos. per machine) of 10 cum cat992k payloader (sl. no. 500293, 500298, 500300 and 500302) working at kocp
Repairing/rebuilding and line boring of 08 nos. cracked/ worn out lift cylinder rear pin housing (02 nos. per machine) of 10 cum cat992k payloader (sl. no. 500293, 500298, 500300 and 500302) working at kocp. scope of work as per tender documents.
Read moreRepairing and line boring of 04 nos. worn-out bucket eyes and repair welding/shaping of rhs bucket eye housing on the front part of bucket to make the bucket assembly serviceable/ready in float for be1800e shovel at dep.
Repairing and line boring of 04 nos. worn-out bucket eyes and repair welding/shaping of rhs bucket eye housing on the front part of bucket to make the bucket assembly serviceable/ready in float for be1800e shovel at dep.
Read moreRepairing of 4 nos. of support wheel (part no. 3548.05.02.100) sw39l2, sw39l3, sw39r2 and sw39r3 applicable for ekg10 rope shovel.
Repairing of 4 nos. of support wheel (part no. 3548.05.02.100) sw39l2, sw39l3, sw39r2 and sw39r3 applicable for ekg10 rope shovel.
Read moreComplete repairing / overhauling of both side (lhs and rhs), 02 nos. propel gearbox assembly (part no. 4106002575) with providing of spares of be-195, 10 m3 rope shovel working at bina project.
Complete repairing / overhauling of both side (lhs and rhs), 02 nos. propel gearbox assembly (part no. 4106002575) with providing of spares of be-195, 10 m3 rope shovel working at bina project.
Read moreRepairing of 04 nos. tram valve (part no. z2214) of rel750e drills working at bina project.
Repairing of 04 nos. tram valve (part no. z2214) of rel750e drills working at bina project.
Read moreRepairing replacement of swing gear pinion assembly denting fabrication of er weight repairing of bucket cylinder assembly and its fitment along with fitment of 02 nos cabing glass of lnt ck 300 hydraulic shovel sl no b782 working at ttk ocp und
Repairing replacement of swing gear pinion assembly denting fabrication of er weight repairing of bucket cylinder assembly and its fitment along with fitment of 02 nos cabing glass of lnt ck 300 hydraulic shovel sl no b782 working at ttk ocp und
Read moreWelding and co-axial boring of 3rd intermediate shaft outer bearing housing and 3rd intermediate shaft bearing housing and 2nd intermediate shaft bearing housing both side of 2 nos. propel gear box assembly.
Welding and co-axial boring of 3rd intermediate shaft outer bearing housing and 3rd intermediate shaft bearing housing and 2nd intermediate shaft bearing housing both side of 2 nos. propel gear box assembly.
Read moreRepairing / rebuilding of 8 nos. worn out bucket of 24/96 draglines and 3 nos. worn out bucket of 10/70 draglines, working at bina project.
Repairing / rebuilding of 8 nos. worn out bucket of 24/96 draglines and 3 nos. worn out bucket of 10/70 draglines, working at bina project.
Read moreRepairing of input shaft and intermediate pinion shaft (worn out teeth) of gear box of c4 conveyor in all respect, repairing of the fluid coupling t12-12 and removal of the bearing and gear coupling of the drive shaft including shifting of all the ma
Repairing of input shaft and intermediate pinion shaft (worn out teeth) of gear box of c4 conveyor in all respect, repairing of the fluid coupling t12-12 and removal of the bearing and gear coupling of the drive shaft including shifting of all the ma
Read moreRepairing / re-conditioning of damaged / worn-out teeth of 02 nos. 3rd intermediate pinion shaft and 2 nos. tumbler gear of propel gear box system for be-195 shovel working at bina project.
Repairing / re-conditioning of damaged / worn-out teeth of 02 nos. 3rd intermediate pinion shaft and 2 nos. tumbler gear of propel gear box system for be-195 shovel working at bina project.
Read moreof your Industry type