Tender Details
About Tender
🏗️ Construction Opportunity: Prayagraj Southern Greenfield By Pass 🛣️ The National Highways Authority Of India (Nhai) Is Calling For Tenders For The Construction Of A New 4 Lane Prayagraj Southern Greenfield By Pass From Design Km. 34.400 Near Dandupur To Design Km. 43.200 Near Mahuwari, With A Design Length Of 8.800 Km (Package 1 Under Phase I On Nh 19 In Uttar Pradesh) Under The Bharatmala Pariyojana (Bmp) On An Epc (Engineering, Procurement, And Construction) Mode. 📅 Bid Submission Deadline: May 30, 2024, 11:00 Am Tender Fee: Inr 60,000 Earnest Money Deposit (Emd): Inr 5,58,00,000 Eligible Contractors With Experience In Large Scale Infrastructure Projects Are Invited To Submit Detailed Tenders, Including Technical And Financial Bids, In Accordance With The Specifications And Guidelines Provided In The Tender Document. Keywords: Construction, Nhai, Prayagraj Southern Greenfield By Pass, Nh 19, Uttar Pradesh, Bharatmala Pariyojana, Epc Mode, Tender, Bid, Infrastructure DevelopmentParticulars | Details |
---|---|
Title |
Construction Of New 4 Lane Prayagraj Southern Greenfield By Pass From Design Km.34.400 (Near Dandupur) To Design Km.43.200 (Near Mahuwari) Design Length 8.800 Km Pkg 1 Under Phase I On Nh 19 In Uttar Pradesh Under Bmp On Epc Mode
|
Description |
Construction Of New 4 Lane Prayagraj Southern Greenfield By Pass From Design Km.34.400 (Near Dandupur) To Design Km.43.200 (Near Mahuwari) Design Length 8.800 Km Pkg 1 Under Phase I On Nh 19 In Uttar Pradesh Under Bmp On Epc Mode
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id | 2023_NHAI_171954_1 |
Reference Number |
|
Tender Fee | 60000 |
EMD | 5.58 Crore |
Tender Value | |
Place | NHAI HQ |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=188360 |
Start Date | October 25, 2023 18:45 |
End Date |
11/07/2024 ( Expired 285 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreConst. of ec for gammon junc at km. 903.265 (blackspot id no. ap(05)-092)and diwancheruvu junc at km. 902.308(blackspot id no.ap(03)-299) on nh16 in andhra pradesh under nh(o) on epc mode
Const. of ec for gammon junc at km. 903.265 (blackspot id no. ap(05)-092)and diwancheruvu junc at km. 902.308(blackspot id no.ap(03)-299) on nh16 in andhra pradesh under nh(o) on epc mode
Read moreConstruction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreWidening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24
Widening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24
Read moreIndependent engineer services during operation and maintenance of six-laning of nh-71 from renigunta (km. 0.000) to naidupeta (km.57.046) (length-57.046 km.) on hybrid annuity mode in the state of andhra pradesh under bharatmala pariyojana.
Independent engineer services during operation and maintenance of six-laning of nh-71 from renigunta (km. 0.000) to naidupeta (km.57.046) (length-57.046 km.) on hybrid annuity mode in the state of andhra pradesh under bharatmala pariyojana.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreConstruction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab
Construction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab
Read moreof your Industry type