Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Earth Work In Removing Thecks And Berm Cutting In Internal Section Of E.G.C. Main Canal From Km.47.600 To Km.48.000 For The Year 2024 25 In Distt. Bijnor.
|
| Description |
Earth Work In Removing Thecks And&Amp#X0d
Berm Cutting In Internal Section Of&Amp#X0d
E.G.C. Main Canal From&Amp#X0d
Km.47.600 To Km.48.000 For The&Amp#X0d
Year 2024 25 In Distt. Bijnor.
|
| Organisation | U P Irrigation Department (Civil) | State Govt. and UT |
| Tender Id | 2025_UPIDC_998640_1 |
|
Reference Number |
TENDER NOTICE-05/EE/2024-25 |
| Tender Fee | 767 |
| EMD | 27000 |
| Tender Value | |
| Place | BIJNOR |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1773533 |
| Start Date | January 28, 2025 15:30 |
| End Date |
Expired
03/02/2025
Expired 497 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Restoration of landslide affected sections from km 12.800 to km 14.220 of nh-58e (kundal-jhadol section) in the state of rajasthan.
Restoration of landslide affected sections from km 12.800 to km 14.220 of nh-58e (kundal-jhadol section) in the state of rajasthan.
Read moreBeautification and improvement works at puducherry urban stretch from km.01.450 to km.03.520 in the project of puducherry tindivanam section of nh-32 (old nh-66)
Beautification and improvement works at puducherry urban stretch from km.01.450 to km.03.520 in the project of puducherry tindivanam section of nh-32 (old nh-66)
Read moreProvision for shifting of the existing pipe line along the road from oerc sqr to lpr road via kanyasharm from 0/600 km to 1/027 km under watco section, niladri vihar
Provision for shifting of the existing pipe line along the road from oerc sqr to lpr road via kanyasharm from 0/600 km to 1/027 km under watco section, niladri vihar
Read moreUnder the renewal item year 2026-27 renewal work by sdbc in the motor road for km 5 to of bageshwar dafaut motor road and for km 1 of bagehwar kapkot link motor road
Under the renewal item year 2026-27 renewal work by sdbc in the motor road for km 5 to of bageshwar dafaut motor road and for km 1 of bagehwar kapkot link motor road
Read moreConstruction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
Read moreIndependent engineer services for 2 l. paved shoulders/ 4 laning of damoh jabalpur package-1 and 3 section of nh-34 from km 0.000 to km 43.500 and km 66.800 to km 101.563 under nh (o) in madhya pradesh on ham
Independent engineer services for 2 l. paved shoulders/ 4 laning of damoh jabalpur package-1 and 3 section of nh-34 from km 0.000 to km 43.500 and km 66.800 to km 101.563 under nh (o) in madhya pradesh on ham
Read moreConstruction of road from kondapuri to barawada under mmsy-trip in the district of nabarangpur for the year 2025-26.
Construction of road from kondapuri to barawada under mmsy-trip in the district of nabarangpur for the year 2025-26.
Read moreConstruction of interlocking road and drain from manokamna temple gate to the pond in mohammed ramlila ward no. 7 of nagar panchayat jhalhu, bijnor district. length 80.30 meters.
Construction of interlocking road and drain from manokamna temple gate to the pond in mohammed ramlila ward no. 7 of nagar panchayat jhalhu, bijnor district. length 80.30 meters.&#x0d
Read moreRejinagar - sarbangapur road from chainage 0.00 kmp. to 0.50 km. and 5.50 km. to 8.00 kmp. (in stretches) repairing work under murshidabad highway division no.i. in the district of murshidabad during 2026-27
Rejinagar - sarbangapur road from chainage 0.00 kmp. to 0.50 km. and 5.50 km. to 8.00 kmp. (in stretches) repairing work under murshidabad highway division no.i. in the district of murshidabad during 2026-27
Read moreConstruction of road from pwd road to bagiriaguda under mmsy-trip in the district of malkangir for the year 2025-26.
Construction of road from pwd road to bagiriaguda under mmsy-trip in the district of malkangir for the year 2025-26.
Read moreof your Industry type