Tender Details

Particulars Details
Title
Earth Work In Removing Thecks And Birm Cutting In Internal Section Of E.G.C. Main Canal From Km.47.600 To Km.48.000 For The Year 2024 25 In Distt. Bijnor.
Description
Earth Work In Removing Thecks And Birm Cutting In Internal Section Of E.G.C. Main Canal From Km.47.600 To Km.48.000 For The Year 2024 25 In Distt. Bijnor.
Organisation U P Irrigation Department (Civil) | State Govt. and UT
Tender Id 2024_UPIDC_982032_1
Reference
Number
TENDER NOTICE NO. 03/EE/2024-25
Tender Fee 767
EMD 27000
Tender Value
Place BIJNOR
Link
View Original Tender Notice

https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1728626

Start Date December 10, 2024 15:30
End Date
Expired 16/12/2024

Expired 548 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Earth work in in filling rain cuts, side cuts, pots holes,ruts ,jungle cutting and repair of brick soling between km 12.900 to km 13.500 of vikramjot dhushwa bund on left bank of ghaghra river in distt. basti.

Earth work in in filling rain cuts, side cuts, pots holes,ruts ,jungle cutting and repair of brick soling between km 12.900 to km 13.500 of vikramjot dhushwa bund on left bank of ghaghra river in distt. basti.

Read more
Restoration of landslide affected sections from km 12.800 to km 14.220 of nh-58e (kundal-jhadol section) in the state of rajasthan.

Restoration of landslide affected sections from km 12.800 to km 14.220 of nh-58e (kundal-jhadol section) in the state of rajasthan.

Read more
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Read more
Beautification and improvement works at puducherry urban stretch from km.01.450 to km.03.520 in the project of puducherry tindivanam section of nh-32 (old nh-66)

Beautification and improvement works at puducherry urban stretch from km.01.450 to km.03.520 in the project of puducherry tindivanam section of nh-32 (old nh-66)

Read more
Provision for shifting of the existing pipe line along the road from oerc sqr to lpr road via kanyasharm from 0/600 km to 1/027 km under watco section, niladri vihar

Provision for shifting of the existing pipe line along the road from oerc sqr to lpr road via kanyasharm from 0/600 km to 1/027 km under watco section, niladri vihar

Read more
Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.

Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.

Read more
Repair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313

Repair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313

Read more
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram

Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram

Read more
Independent engineer services for 2 l. paved shoulders/ 4 laning of damoh jabalpur package-1 and 3 section of nh-34 from km 0.000 to km 43.500 and km 66.800 to km 101.563 under nh (o) in madhya pradesh on ham

Independent engineer services for 2 l. paved shoulders/ 4 laning of damoh jabalpur package-1 and 3 section of nh-34 from km 0.000 to km 43.500 and km 66.800 to km 101.563 under nh (o) in madhya pradesh on ham

Read more
Construction of road from kondapuri to barawada under mmsy-trip in the district of nabarangpur for the year 2025-26.

Construction of road from kondapuri to barawada under mmsy-trip in the district of nabarangpur for the year 2025-26.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise