Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
30 M High Mast,Cable 3.5 Cx50 Mm2,Excavation With Disposal Outside,Rcc,Steel Reinforcement,Pcc,350 W
|
| Description |
|
| Organisation | Bharat Petroleum Corporation Ltd | Ministry of Petroleum and Natural Gas |
| Tender Id | GEM/2023/B/3850420 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | August 20, 2023 15:30 |
| End Date |
Expired
09/09/2023
Expired 1134 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
ENERGYGREEN TECHNOPOWER PRIVATE LIMITED
5891050
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | A D POLE & HIGH MAST | - | 21-09-2023 12:06:48 | MSE | Qualified |
| 2 | AA3N VENTURES | - | 21-08-2023 16:22:16 | MSE | Qualified |
| 3 | B. S. TRADERS | - | 01-09-2023 14:11:30 | MSE | Disqualified |
| 4 | elektron | - | 14-09-2023 17:39:30 | N/A | Qualified |
| 5 | ENERGYGREEN TECHNOPOWER PRIVATE LIMITED | - | 21-09-2023 11:59:23 | MSE | Qualified |
| 6 | GEETU ENGINEERING AND CONSTRUCTIONS PRIVATE LIMITED | - | 07-09-2023 16:37:36 | N/A | Disqualified |
| 7 | M/S JYOTI ELECTRICAL | - | 20-09-2023 23:25:34 | MSE | Qualified |
| 8 | RUBY ENGINEERS | - | 11-09-2023 14:26:44 | MSE | Qualified |
| 9 | SAHIB ELECTRICAL | - | 16-09-2023 21:16:57 | MSE | Qualified |
| 10 | SAPPHIRE FACILITY SOLUTIONS PRIVATE LIMITED | - | 23-09-2023 01:31:19 | MSE | Disqualified |
| 11 | TRANS ENTERPRISES PRIVATE LIMITED | - | 22-09-2023 18:33:34 | N/A | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | ENERGYGREEN TECHNOPOWER PRIVATE LIMITED(MSE)( MSE Social Category:OBC ) | Item Categories : 30 M HIGH MAST,CABLE 3.5CX50 MM2,EXCAVATION WITH DISPOSAL OUTSIDE,RCC,STEEL REINFORCEMENT,PCC,350 W | 5891050.00 | L1 |
| 2 | TRANS ENTERPRISES PRIVATE LIMITED | Item Categories : 30 M HIGH MAST,CABLE 3.5CX50 MM2,EXCAVATION WITH DISPOSAL OUTSIDE,RCC,STEEL REINFORCEMENT,PCC,350 W | 6076500.00 | L2 |
| 3 | SAHIB ELECTRICAL (MSE)( MSE Social Category:General ) | Item Categories : 30 M HIGH MAST,CABLE 3.5CX50 MM2,EXCAVATION WITH DISPOSAL OUTSIDE,RCC,STEEL REINFORCEMENT,PCC,350 W | 6227155.00 | L3 |
| 4 | M/S JYOTI ELECTRICAL (MSE)( MSE Social Category:General ) | Item Categories : 30 M HIGH MAST,CABLE 3.5CX50 MM2,EXCAVATION WITH DISPOSAL OUTSIDE,RCC,STEEL REINFORCEMENT,PCC,350 W | 6268595.00 | L4 |
| 5 | A D POLE & HIGH MAST (MSE)( MSE Social Category:General ) | Item Categories : 30 M HIGH MAST,CABLE 3.5CX50 MM2,EXCAVATION WITH DISPOSAL OUTSIDE,RCC,STEEL REINFORCEMENT,PCC,350 W | 6818000.00 | L5 |
| 6 | AA3N VENTURES (MSE)( MSE Social Category:General ) | Item Categories : 30 M HIGH MAST,CABLE 3.5CX50 MM2,EXCAVATION WITH DISPOSAL OUTSIDE,RCC,STEEL REINFORCEMENT,PCC,350 W | 7076380.00 | L6 |
| 7 | RUBY ENGINEERS (MSE)( MSE Social Category:General ) | Item Categories : 30 M HIGH MAST,CABLE 3.5CX50 MM2,EXCAVATION WITH DISPOSAL OUTSIDE,RCC,STEEL REINFORCEMENT,PCC,350 W | 7126150.00 | L7 |
| 8 | elektron | Item Categories : 30 M HIGH MAST,CABLE 3.5CX50 MM2,EXCAVATION WITH DISPOSAL OUTSIDE,RCC,STEEL REINFORCEMENT,PCC,350 W | 7229240.00 | L8 |
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| 30 M HIGH MAST | NA | BOQ Item | 5 | ₹ 2345250.000 |
| CABLE 3.5CX50 MM2 | NA | BOQ Item | 500 | ₹ 425000.000 |
| EXCAVATION WITH DISPOSAL OUTSIDE | NA | BOQ Item | 75 | ₹ 86250.000 |
| RCC | NA | BOQ Item | 30 | ₹ 663750.000 |
| STEEL REINFORCEMENT | NA | BOQ Item | 2000 | ₹ 530000.000 |
| PCC | NA | BOQ Item | 20 | ₹ 177000.000 |
| 350 W LED Flood Lights | NA | BOQ Item | 120 | ₹ 1486800.000 |
| EARTHING | NA | BOQ Item | 10 | ₹ 177000.000 |
Excavation,rubble soling,pcc m15,rcc m25,shuttering,brick masonary 230 mm thick,plaster 15mm thick,reinforcement,back filling for raising height,ultratech rapid hard rmc concrete m30 including trimix and grove cutting,150 micron ldp sheet,providing and laying 300mm rcc hume pipe
Excavation,rubble soling,pcc m15,rcc m25,shuttering,brick masonary 230 mm thick,plaster 15mm thick,reinforcement,back filling for raising height,ultratech rapid hard rmc concrete m30 including trimix and grove cutting,150 micron ldp sheet,providing and laying 300mm rcc hume pipe
Read moreExcavation,excv rck dis out,excv hrd rck noblast,dismantl pcc,dismantl rcc,dismntl brick mason,availabl earth fill,ground surf dressing,shor 1.5-3m opn timb,brk flt surf 80 cl75,pcc,precast rcc,steel reinforcement,sfep str stl manual,fence brb wr,sf concertina 600mm,plaster,neat,pnt prm,painting of boundary wall - bld pnt snowcem 2c,fr scrn,pvr block,old paver block lay
Excavation,excv rck dis out,excv hrd rck noblast,dismantl pcc,dismantl rcc,dismntl brick mason,availabl earth fill,ground surf dressing,shor 1.5-3m opn timb,brk flt surf 80 cl75,pcc,precast rcc,steel reinforcement,sfep str stl manual,fence brb wr,sf concertina 600mm,plaster,neat,pnt prm,painting of boundary wall - bld pnt snowcem 2c,fr scrn,pvr block,old paver block lay
Read moreEarth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreSurface excavation n exc not exceeding 30 cm deep and averaging 15cm deep and getting out,excavating in trenches n exc 1 5 m wide and n exc 1 5 m in depth for foundation etc or for shafts wells cesspits manholes pier holes etc n exc 10 sq m on plan and n exc 1 5 m in depth and getting out,providing and laying sand filling under floors or in foundations including watering and consolidation,providing and laying bricks sub class b laid flat in floors old size bricks,material and labour cement concrete in foundations filling and mass concrete type b2 1 2 4,material and labour boring holes 3 m deep in soil for under reamed piles and getting out and disposal of spoil to a distance of n exc 50 m,providing and laying rcc nominal mix in foundations including rafts footings foundation beams plinth beams bases for columns etc,providing and laying brickwork with subclass b bricks straight or curved on plan exc 6m mean radius built in cement mortar 1 4,providing and rendering 12mm thick on fair faces of brick work or conc
Surface excavation n exc not exceeding 30 cm deep and averaging 15cm deep and getting out,excavating in trenches n exc 1 5 m wide and n exc 1 5 m in depth for foundation etc or for shafts wells cesspits manholes pier holes etc n exc 10 sq m on plan and n exc 1 5 m in depth and getting out,providing and laying sand filling under floors or in foundations including watering and consolidation,providing and laying bricks sub class b laid flat in floors old size bricks,material and labour cement concrete in foundations filling and mass concrete type b2 1 2 4,material and labour boring holes 3 m deep in soil for under reamed piles and getting out and disposal of spoil to a distance of n exc 50 m,providing and laying rcc nominal mix in foundations including rafts footings foundation beams plinth beams bases for columns etc,providing and laying brickwork with subclass b bricks straight or curved on plan exc 6m mean radius built in cement mortar 1 4,providing and rendering 12mm thick on fair faces of brick work or conc
Read moreRcc design mix - m25,pcc,excavation for foundation,reinforcement steel,brick masonary,cement plaste
Read more
Site clearance,excavation in earth,pcc 1 4 8 ratio,rcc 1 1.5 3 ratio,reinforcement steel,pcc 1 2 4
Read more
of your Industry type