Title
Rcc Design Mix M25,Pcc,Excavation For Foundation,Reinforcement Steel,Brick Masonary,Cement Plaste
Description
Organisation Bharat Petroleum Corporation Ltd | Ministry of Petroleum and Natural Gas
Tender Id GEM/2023/B/4181719
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://gem.gov.in/

Start Date November 08, 2023 03:51
End Date
Expired 23/11/2023

Expired 1056 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Awarded Contractor / Winner

SAPPHIRE FACILITY SOLUTIONS PRIVATE LIMITED

Contract Value

1278176

Tender Status: active
Additional Information: Average Turn Over of Last 3 Years: Lakhs Experience with Gov. Required: Years
Buyer Name: Hemant Sharma
Ministry: Ministry Of Petroleum And Natural Gas
Department: Bharat Petroleum Corporation Ltd
Organisation: Bharat Petroleum Corporation Ltd

Technical Evaluation Results

S.No. Seller Name Offered Item Participated On MSE/MII Status Status
1 M/S RUHI ELECTRICAL & ELECTRONICS - 23-11-2023 19:12:50 MSE Qualified
2 SAPPHIRE FACILITY SOLUTIONS PRIVATE LIMITED - 17-11-2023 22:48:46 MSE Qualified
3 VEECONS INTERNATIONAL - 23-11-2023 09:34:21 MSE Qualified

Financial Evaluation Results

S.No. Seller Name Offered Item Total Price Rank
1 SAPPHIRE FACILITY SOLUTIONS PRIVATE LIMITED(MSE)( MSE Social Category:General ) Item Categories : RCC DESIGN MIX - M25,PCC,Excavation for Foundation,Reinforcement Steel,BRICK MASONARY,CEMENT PLASTE 1278176.00 L1
2 M/S RUHI ELECTRICAL & ELECTRONICS (MSE)( MSE Social Category:OBC ) Item Categories : RCC DESIGN MIX - M25,PCC,Excavation for Foundation,Reinforcement Steel,BRICK MASONARY,CEMENT PLASTE 1362647.48 L2
3 VEECONS INTERNATIONAL (MSE)( MSE Social Category:General ) Item Categories : RCC DESIGN MIX - M25,PCC,Excavation for Foundation,Reinforcement Steel,BRICK MASONARY,CEMENT PLASTE 1451454.28 L3

Ordered Items & Contract Pricing

Product Brand Model Ordered Quantity Price
RCC DESIGN MIX - M25 NA BOQ Item 32 ₹ 281600.000
PCC NA BOQ Item 9 ₹ 76500.000
Excavation for Foundation NA BOQ Item 21 ₹ 7350.000
Reinforcement Steel NA BOQ Item 3612 ₹ 353976.000
BRICK MASONARY NA BOQ Item 23 ₹ 195500.000
CEMENT PLASTER NA BOQ Item 167 ₹ 75150.000
INTERNAL PAINTING OF ROOM NA BOQ Item 105 ₹ 15750.000
EXTERNAL PAINTING OF ROOM NA BOQ Item 63 ₹ 9450.000
Supplying and Fixing of VITRIFIED Tiles NA BOQ Item 42 ₹ 77700.000
Supply and fixing of Kota Stone NA BOQ Item 19 ₹ 28500.000
Supply and fixing of Al frame Glass door NA BOQ Item 2 ₹ 29000.000
Supply and installation of Al frame double leaf double sliding Windows NA BOQ Item 4 ₹ 50000.000
Waterproofing of Roof NA BOQ Item 42 ₹ 77700.000
Similar Tenders
Excavation,excv rck dis out,excv hrd rck noblast,dismantl pcc,dismantl rcc,dismntl brick mason,availabl earth fill,ground surf dressing,shor 1.5-3m opn timb,brk flt surf 80 cl75,pcc,precast rcc,steel reinforcement,sfep str stl manual,fence brb wr,sf concertina 600mm,plaster,neat,pnt prm,painting of boundary wall - bld pnt snowcem 2c,fr scrn,pvr block,old paver block lay

Excavation,excv rck dis out,excv hrd rck noblast,dismantl pcc,dismantl rcc,dismntl brick mason,availabl earth fill,ground surf dressing,shor 1.5-3m opn timb,brk flt surf 80 cl75,pcc,precast rcc,steel reinforcement,sfep str stl manual,fence brb wr,sf concertina 600mm,plaster,neat,pnt prm,painting of boundary wall - bld pnt snowcem 2c,fr scrn,pvr block,old paver block lay

Read more
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise