Tender Details

Particulars Details
Title
Ytps
Description
Tggenco Ytps (5x800 Mw) Bm Unit Ii Repair /Rectification Of Esp Fields Of Unit Ii From The Actual Date Of Commencement Of Work To 31.03.2026 As And When Required During The Fy 2025 26
Organisation Information Technology Electronics and Communication Department Telangana | State Govt. and UT
Tender Id 612375
Reference
Number
e- 20/ SE/ EM/Stage-I/ YTPS/2025-26
Tender Fee 192
EMD 8105
Tender Value -
Place TS
Link
View Original Tender Notice

http://eprocurement.telangana.gov.in/

Start Date July 09, 2025 23:30
End Date
Expired 16/07/2025

Expired 459 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Tggenco-ytps(5x800 mw)-chp/stage-ii-supply of different rating of fuses required for electrical maintenance division

Tggenco-ytps(5x800 mw)-chp/stage-ii-supply of different rating of fuses required for electrical maintenance division

Read more
Tggenco-(5x800 mw) ytps - procurement of furniture for ce, se, des, ades and aes offices of stage-i, service building of yadadri thermal power station, veerlapalem (v), dameracherla (m), nalgonda dist.

Tggenco-(5x800 mw) ytps - procurement of furniture for ce, se, des, ades and aes offices of stage-i, service building of yadadri thermal power station, veerlapalem (v), dameracherla (m), nalgonda dist.

Read more
Tggenco-ytps(5x800mw)-switchyard transformer yard division-testing of transformer oil samples of various power transformers as and when required during the fy 2026-27

Tggenco-ytps(5x800mw)-switchyard transformer yard division-testing of transformer oil samples of various power transformers as and when required during the fy 2026-27

Read more
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - crn 4723 overhauling & rectification work of esp fields & hopper of unit #1, 2 & 3 as per sow & tc as per sow & tc

Repair, maintenance, and installation of plant/ systems/equipments (version 2) - crn 4723 overhauling & rectification work of esp fields & hopper of unit #1, 2 & 3 as per sow & tc as per sow & tc

Read more
Tggenco - rts-b- providing of insurance coverage for the operational, non-operational and store items and obsolete spares and burglary including theft policy for plant assets of 1x62.5 mw- rts-b unit, ramagundam for a period of one year from the actual date of commencement of insurance coverage

Tggenco - rts-b- providing of insurance coverage for the operational, non-operational and store items and obsolete spares and burglary including theft policy for plant assets of 1x62.5 mw- rts-b unit, ramagundam for a period of one year from the actual date of commencement of insurance coverage

Read more
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027

Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027

Read more
Tggenco ytps be1 collection and testing of oil samples pertaining to bm-i division from actual date of commencement of work to 31.03.2027

Tggenco ytps be1 collection and testing of oil samples pertaining to bm-i division from actual date of commencement of work to 31.03.2027

Read more
Tggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.

Tggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.

Read more
Tggenco-ytps-up keeping of toilets, urinals and maintenance of sewage pipe lines and manholes at power house 1 and 2, esp control building-1 and 2 and service building 1 at ytps from 01.04.2026 or actual date of commencement of work to 31.03.2027

Tggenco-ytps(5x800mw)-up keeping of toilets, urinals and maintenance of sewage pipe lines and manholes etc at power house-1 and 2, esp control building-1 and 2 and service building-1 at yadadri thermal power station, veerlapalem (v), dameracherla (m), nalgonda district from 01.04.2026 or actual date of commencement of work to 31.03.2027.

Read more
Tggenco-ytps-up keeping of toilets, urinals and maintenance of sewage pipe line and manholes at office sheds and store office building at ytps from 01.04.2026 or actual date of commencement of work to 31.03.2027.

Tggenco-ytps-up keeping of toilets, urinals and maintenance of sewage pipe lines and manholes at various locations in office sheds and store office building of yadadri thermal power station, at veerlapalem(v), dameracherla(m) in nalgonda dist from 01.04.2026 or actual date of commencement of work to 31.03.2027

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise