Tender Details

About Tender

🛣️ Invitation For Bids: Nh 753 B Rehabilitation And Upgradation Project 🛣️ The Ministry Of Road Transport And Highways, Under The Central Government, Invites Bids From Experienced Contractors For The Rehabilitation And Upgradation Of National Highway 753 B (Nh 753 B) From Km 78.270 To Km 116.670, Including The Taloda Section On The Gujarat Maharashtra Border, To A Four Lane Highway With A Paved Shoulder Configuration. 📅 Bid Submission Deadline: April 26, 2024, 5:00 Pm The Project Will Be Executed On A Hybrid Annuity Mode. Interested Bidders Must Submit An Earnest Money Deposit (Emd) Of Inr 660,00,000. Keywords: Nh 753 B, Highway Upgradation, Infrastructure Development, Hybrid Annuity Mode, Ministry Of Road Transport And Highways, Government Tender, Emd, Bid Submission
Particulars Details
Title
Rehabilitation And Upgradation Of Nh 753 B To Four Lane With Paved Shoulder Configuration From Km 78.270 To Km 116.670 (Section Taloda Gujarat Maharashtra Border) In The State Of Maharashtra On Hybrid Annuity Mode.
Description
Rehabilitation And Upgradation Of Nh 753 B To Four Lane With Paved Shoulder Configuration From Km 78.270 To Km 116.670 (Section Taloda Gujarat Maharashtra Border) In The State Of Maharashtra On Hybrid Annuity Mode.
Organisation Ministry of Road Transport and Highways | Central Govt. Ministry/Department
Tender Id 2024_MoRTH_797991_1
Reference
Number
RO/MUM/TENDER/2023-24/02
Tender Fee 0
EMD 6.6 Crore
Tender Value -
Place Taloda
Link
View Original Tender Notice

https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=838818

Start Date April 09, 2024 16:30
End Date
Expired 09/10/2024

Expired 732 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Services of independent engineer for rehabilitation and upgradation of nh-753b to 4lps configuration from section-taloda gujarat-maharashtra border in the state of maharashtra on hybrid annuity mode.

Services of independent engineer for rehabilitation and upgradation of nh-753b to 4lps configuration from section-taloda gujarat-maharashtra border in the state of maharashtra on hybrid annuity mode.

Read more
Rehabilitation and upgradation of nh 753b from nandurbar to taloda (km. 49.050 to km. 78.270) to 4 lps in the states of maharashtra/gujarat on epc mode.

Rehabilitation and upgradation of nh 753b from nandurbar to taloda (km. 49.050 to km. 78.270) to 4 lps in the states of maharashtra/gujarat on epc mode.

Read more
Rehabilitation and upgradation of nh 753b from nandurbar to taloda (km. 49.050 to km. 78.270) to 4 lps in the states of maharashtra/gujarat on epc mode.

Rehabilitation and upgradation of nh 753b from nandurbar to taloda (km. 49.050 to km. 78.270) to 4 lps in the states of maharashtra/gujarat on epc mode.

Read more
Construction of nh-753b gavhanipada to gujrat border road vr-7. tal. taloda dist. nandurbar

Construction of nh-753b gavhanipada to gujrat border road vr-7. tal. taloda dist. nandurbar

Read more
Upgradation to two lane with paved shoulder configuration from km0.000 to km 62.822 (limbdi - dharangadhra) of nh-51 in the state of gujarat on hybrid annuity mode (ham) (total length- 62.822 km).

Upgradation to two lane with paved shoulder configuration from km0.000 to km 62.822 (limbdi - dharangadhra) of nh-51 in the state of gujarat on hybrid annuity mode (ham) (total length- 62.822 km).

Read more
Up-gradation of shyampur to sabalgarh road section of nh-552ext. from km 111.800 to 166.850 to two lane with paved shoulder configuration in the state of madhya pradesh on hybrid annuity mode

Up-gradation of shyampur to sabalgarh road section of nh-552ext. from km 111.800 to 166.850 to two lane with paved shoulder configuration in the state of madhya pradesh on hybrid annuity mode

Read more
Widening to 2lane with paved shoulder configuration of jalna to pulgaon

Widening to 2lane with paved shoulder configuration of jalna to pulgaon&#x0d section existing ch 150.000 to 186.000 nh753c in the state of maharashtra (pkg.04 from 150.000 to 186.000)&#x0d

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Widening to 2 lane with paved shoulder configuration of jalna to pulgaon

Widening to 2 lane with paved shoulder configuration of jalna to pulgaon&#x0d section existing ch 100.000 to design ch 150.000 nh753c in the state of maharashtra&#x0d (pkg.03, from100.000 to 150.000)&#x0d

Read more
Access controlled highway of 4l with paved shoulder from dc 10.00 to dc 33.87 in bellary moka knt/ap border section of nh167 in karnataka on hybrid annuity mode under nh(o) (project length 23.870 km)

Access controlled highway of 4l with paved shoulder from dc 10.00 to dc 33.87 in bellary moka knt/ap border section of nh167 in karnataka on hybrid annuity mode under nh(o) (project length 23.870 km)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise