Tender Details
Particulars | Details |
---|---|
Title |
Improvement And Damrikaran Work Of Kametkhan Toparadhar Motor Road And 3 Years Maintenance In Didihat Constituency Of District Pithoragarh Under The State Plan. (Length 2.200 Km)
|
Description |
Improvement And Damrikaran Work Of Kametkhan Toparadhar Motor Road And 3 Years Maintenance In Didihat Constituency Of District Pithoragarh Under The State Plan. (Length 2.200 Km)
|
Organisation | PWD | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 5900 |
EMD | 2.92 Lakh |
Tender Value | |
Place | Didihat |
Link |
AAAAAAAAAA Login to view |
Start Date | April 11, 2025 22:30 |
End Date |
01/05/2025 ( 11 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreHiring of services for carrying out pre-engineering survey, rou acquisition and obtaining statutory clearance/ permission for projects in onshore assets under rate contract for a period of 3 years
Hiring of services for carrying out pre-engineering survey, rou acquisition and obtaining statutory clearance/ permission for projects in onshore assets under rate contract for a period of 3 years
Read morePerformance based maintenance contract pbmc for maintenance of watul . talgaon section of nh .66 from existing km 332.200 to km 367.200 design km 165.270 to km 198.528 project length 33.258km in the state of maharashtra for 5 years. maintenance p
Performance based maintenance contract pbmc for maintenance of watul . talgaon section of nh .66 from existing km 332.200 to km 367.200 design km 165.270 to km 198.528 project length 33.258km in the state of maharashtra for 5 years. maintenance p
Read moreProcurement of additional civil works for g plus 2 seoc building and g plus 3 asdma building in guwahati assam including 3 years of o and m period under airbmp
Procurement of additional civil works for g plus 2 seoc building and g plus 3 asdma building in guwahati assam including 3 years of o and m period under airbmp
Read moreConsultancy services for preparation of dpr and land acquisition of kinwat city bypass road on nh 161a km 0.00 km 07.00 in taluka kinwat district nanded in the state of maharashtra on epc mode length 7.00 km
Consultancy services for preparation of dpr and land acquisition of kinwat city bypass road on nh 161a km 0.00 km 07.00 in taluka kinwat district nanded in the state of maharashtra on epc mode length 7.00 km
Read moreOperation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Read morePreparation of dpr including land acquisition and forest clearance for construction of road tungri samchung tsela mago from new to nhsl specifications (indicative length 60 kms) under project vartak in state of arunachal pradesh
Preparation of dpr including land acquisition and forest clearance for construction of road tungri samchung tsela mago from new to nhsl specifications (indicative length 60 kms) under project vartak in state of arunachal pradesh
Read moreDesign and execution of necessary protective measures in malshej ghat section of kalyan nirmal road nh-61 form km. 83-100 to 93-200 in the district of thane in the state of maharashtra.
Design and execution of necessary protective measures in malshej ghat section of kalyan nirmal road nh-61 form km. 83-100 to 93-200 in the district of thane in the state of maharashtra.
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreof your Industry type