Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏭 Invitation For Bids: Development Work In Ratanpur Scheme 🏘️🛠️ The Kanpur Development Authority, Under The Aegis Of The State Government And Union Territories, Invites Bids For The Development Work Between Residential Plots Situated Amidst Commercial Plots No. C 1, C 2, C 3, C 4, And C 5 Within The Ratanpur Scheme In Kanpur Nagar. 📅 Bid Submission Deadline: April 12, 2024, 3:00 Pm Tender Fee: Inr 7080 Emd: Inr 291000 Interested Bidders Must Possess The Requisite Expertise And Experience To Undertake Comprehensive Development Projects. Proposals Should Encompass Detailed Project Plans, Cost Estimates, And Timelines For Completion. Keywords: Development Work, Ratanpur Scheme, Kanpur Development Authority, State Government And Ut, Tender, Bid, Construction Project| Particulars | Details |
|---|---|
| Title |
Development Work Between Residential Plots Arranged In Commercial Plots No. C 1, C 2, C 3, C 4 And C 5 In Ratanpur Scheme
|
| Description |
Development Work Between Residential Plots Arranged In &Amp#X0d
Commercial Plots No. C 1, C 2, C 3, C 4 And C 5 In &Amp#X0d
Ratanpur Scheme
|
| Organisation | Kanpur Development Authority | State Govt. and UT |
| Tender Id | 2024_UPKDA_918201_1 |
|
Reference Number |
11/EE2/KDA/2023-24 |
| Tender Fee | 7080 |
| EMD | 2.91 Lakh |
| Tender Value | |
| Place | KANPUR NAGAR |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1586694 |
| Start Date | March 16, 2024 17:30 |
| End Date |
Expired
12/04/2024
Expired 812 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development works in unauthorized colonies. c/o roads and s.w. rcc and brick work drains at shiv vihar phase-3 (part-2) in mustafabad (a.c.69) (regn. no.766).
Development works in unauthorized colonies. c/o roads and s.w. rcc and brick work drains at shiv vihar phase-3 (part-2) in mustafabad (a.c.69) (regn. no.766).
Read moreBorewell drilling, pumping plant, and borewell chamber construction work for kallipur residential scheme. total number 2 units
Borewell drilling, pumping plant, and borewell chamber construction work for kallipur residential scheme. total number 2 units
Read moreDevelopment works in unauthorized colonies. c/o roads and s.w. brick work drains at west vinod nagar, e-block (part-1) in patparganj ac-27 (regn. no. 610)
Development works in unauthorized colonies. c/o roads and s.w. brick work drains at west vinod nagar, e-block (part-1) in patparganj ac-27 (regn. no. 610)
Read moreDevelopment works in unauthorized colonies. c/o roads and s.w. brick work drains at east vinod nagar, j-block in patparganj (a.c.-57) (regn. no. 47)
Development works in unauthorized colonies. c/o roads and s.w. brick work drains at east vinod nagar, j-block in patparganj (a.c.-57) (regn. no. 47)
Read moreRepair/maintenance of central ac plants at msl 1, 2, 3 and 4 at military station kanasar under ge(n) bikaner
Repair/maintenance of central ac plants at msl 1, 2, 3 and 4 at military station kanasar under ge(n) bikaner
Read moreConstruction of road by interlocking tiles in vill. adarsh tehri, pathri part-2 and basti no. 3 and 4 main road to towards bishan singh panwar house in constituency haridwar gradistt. haridwar under state sector (job 2)
Construction of road by interlocking tiles in vill. adarsh tehri, pathri part-2 and basti no. 3 and 4 main road to towards bishan singh panwar house in constituency haridwar gradistt. haridwar under state sector (job 2)
Read morePfs hyaluronic acid for ortho cases.1)sodium hyaluronic acid of higher concentration equal or more than 60mg/3ml.2)should be of higher molecular weight 5 million dalton.3)highly cross linked and stabilised for long duration of action.4)non avion source.5) certificate to be attached with the offer.
For complete deion and other details, please refer to tender
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreHyderabad division: sw(i) sc-mue section: proposed construction of 2 lane rob in lieu of lc no.180 at rly km 422/1-2 of span 1x36.00 m composite girder between dab-bsx stations on mue-sc section of hyb division - deposit work sw(ii) hyb div: sc-mue section: proposed construction of 2 lane rob at rly km 418/0-1 of span 1x36.00 m composite girder between kek- dab stations on mue-sc section on sh/mdr at km 1002.9 at atkur side road bypass near dharmabad-deposit work. - electrical trd arrang
For complete deion and other details, please refer to tender
Read moreProj no -300/2026-27(part 2) thrikkakara mun-desilting various thodu zone 3 (jetting cross culvert in mary matha road and culvert near green field park)
Proj no -300/2026-27(part&#x0d 2) thrikkakara mun-desilting various thodu&#x0d zone 3 (jetting cross culvert in mary matha&#x0d road and culvert near green field park)
Read moreof your Industry type