Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of 2 Nos Leachpit Under Tetulchita Imis Village
|
| Description |
Construction Of 2 Nos Leachpit Under Tetulchita Imis Village
|
| Organisation | Government of West Bengal |
| Tender Id | 2023_ZPHD_564056_9 |
|
Reference Number |
194/Rai/23, Dated 05/09/2023 |
| Tender Fee | 600 |
| EMD | 1858 |
| Tender Value | |
| Place | RAIPUR GRAM PANCHAYET |
| Link |
View Original Tender Notice
https://wbtenders.gov.in |
| Start Date | September 07, 2023 15:30 |
| End Date |
Expired
20/09/2023
Expired 1034 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&#x0d
Read moreMane colony khandala dist-satara
Water supply scheme for 61 nos rehabilitated families from vele village tal-jaoli,dist-satara (full deposit work)
Read moreConstruction of roads in converted colony pulak vihar and new pulak vihar revenue village sukher. 2808
Construction of roads in converted colony pulak vihar and new pulak vihar revenue village sukher. 2808
Read moreConstruction of two wheeler parking behind post office haridwar under kumbh mela 2027.
Construction of two wheeler parking behind post office haridwar under kumbh mela 2027.
Read moreWidening of local nallah for flood protection work village relgaon block sultanpur tehsil digod district kota
Widening of local nallah for flood protection work village relgaon block sultanpur tehsil digod district kota
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreConstruction of drainage at mgr nagar in narasingarayanpettai
Construction of drainage at mgr nagar in narasingarayanpettai
Read moreConstruction of intermediate pumping stations ips including pl of sewer network rising main and allied works at baramulla
Construction of intermediate pumping stations ips including pl of sewer network rising main and allied works at baramulla
Read moreof your Industry type