Tender Details

Particulars Details
Title
Construction Of Two Wheeler Parking Behind Post Office Haridwar Under Kumbh Mela 2027.
Description
Construction Of Two Wheeler Parking Behind Post Office Haridwar Under Kumbh Mela 2027.
Organisation PWD | State Govt. and UT
Tender Id Login to view
Reference
Number
Login to view
Tender Fee 4720
EMD 2.24 Lakh
Tender Value
Place Haridwar
Link Login to view
Start Date July 07, 2026 15:30
End Date
Closing soon 20/07/2026

3 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Supply and construction of observation post

Supply and construction of observation post

Read more
Work regarding the maintenance and operation for a period of two years of led lights installed by eesl under the madhuban bapudham scheme.

Work regarding the maintenance and operation for a period of two years of led lights installed by eesl under the madhuban bapudham scheme.

Read more
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Read more
Construction of 04 technical building at cad pulgaon under ge pulgaon

Construction of 04 technical building at &#x0d cad pulgaon under ge pulgaon&#x0d

Read more
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2

Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&amp#x0d

Read more
Construction of covered shed alongwith water heating facility at swimming pool at mrc wellington under ge wellington

Construction of covered shed alongwith water heating facility at swimming pool at mrc wellington under ge wellington

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Construction of certain technical, administrative and married / single living accn with connected services at af stn deesa under ph-ii (designated as gp-iii)

Construction of certain technical, &#x0d administrative and married / single living &#x0d accn with connected services at af stn &#x0d deesa under ph-ii (designated as gp-iii)

Read more
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Read more
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp

Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise