Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Two Wheeler Parking Behind Post Office Haridwar Under Kumbh Mela 2027.
|
| Description |
Construction Of Two Wheeler Parking Behind Post Office Haridwar Under Kumbh Mela 2027.
|
| Organisation | PWD | State Govt. and UT |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 4720 |
| EMD | 2.24 Lakh |
| Tender Value | |
| Place | Haridwar |
| Link | Login to view |
| Start Date | July 07, 2026 15:30 |
| End Date |
Closing soon
20/07/2026
3 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Work regarding the maintenance and operation for a period of two years of led lights installed by eesl under the madhuban bapudham scheme.
Work regarding the maintenance and operation for a period of two years of led lights installed by eesl under the madhuban bapudham scheme.
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreConstruction of 04 technical building at cad pulgaon under ge pulgaon
Construction of 04 technical building at 
 cad pulgaon under ge pulgaon
Read moreUnder district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&#x0d
Read moreConstruction of covered shed alongwith water heating facility at swimming pool at mrc wellington under ge wellington
Construction of covered shed alongwith water heating facility at swimming pool at mrc wellington under ge wellington
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstruction of certain technical, administrative and married / single living accn with connected services at af stn deesa under ph-ii (designated as gp-iii)
Construction of certain technical, 
 administrative and married / single living 
 accn with connected services at af stn 
 deesa under ph-ii (designated as gp-iii)
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreof your Industry type