Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Providing And Laying Of Additional Parallel Line From Head Quarter Tank To Bakra Chowk Under Sd I, Cd, Diglipur
|
Description |
Providing And Laying Of Additional Parallel Line From Head Quarter Tank To Bakra Chowk Under Sd I, Cd, Diglipur
|
Organisation | Government of Andaman and Nicobar Islands (U.T) |
Tender Id | 2023_APWD_11347_1 |
Reference Number |
NIT No. 54/EE/CD/APWD/DP/2023-24 |
Tender Fee | 0 |
EMD | 55882 |
Tender Value | |
Place | Executive Engineer, CD, APWD, Diglipur |
Link | https://eprocure.andaman.gov.in |
Start Date | August 23, 2023 15:30 |
End Date |
04/09/2023 ( Expired 659 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read more2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreDevelopment of 4-lane access controlled gf regional expressway on northern side of hyderabad from girmapur village (design ch.-1.518) to reddipalle village (designch.33.000) length of 34.518km in telangana under nh(o) on epc mode (package-i)
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from girmapur village (design ch.-1.518) to reddipalle village (designch.33.000) length of 34.518km in telangana under nh(o) on epc mode (package-i)
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreProviding, laying, jointing, testing and commissioning of 315 mm dia hdpe pipeline at from mahima smart city super corridor road of zone no.16 ward no.15 (as per schedule)
Providing, laying, jointing, testing and commissioning of 315 mm dia hdpe pipeline at from mahima smart city super corridor road of zone no.16 ward no.15 (as per schedule)
Read moreRehabilitation and modernization of jhanjharpur branch canal from km 0.00 to km 42.06 of western kosi irrigation scheme under bwsimp
Rehabilitation and modernization of jhanjharpur branch canal from km 0.00 to km 42.06 of western kosi irrigation scheme under bwsimp
Read moreLaying new drainage line in place of damaged drainage line from councillor fund in nehru nagar road no. 03 and 04 under zone no. 09 ward no. 26 in ghanshyam verma, shiv gogde and kamala tent back line in road no. 04 and 05.
Laying new drainage line in place of damaged drainage line from councillor fund in nehru nagar road no. 03 and 04 under zone no. 09 ward no. 26 in ghanshyam verma, shiv gogde and kamala tent back line in road no. 04 and 05.
Read moreof your Industry type