Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Transportation And Installation Of 1000mm Belt Structure At 28 Ls, 6 D, 39 L, 45 L, 51 L, 57 L (Length Of Belt Structure 2856.0m), 2) Transportation And Installation Of 7 Nos Drive Head Complete Set, 3) Transportation And Laying Of 4 Pipe Line, 90mm
|
| Description |
Transportation And Installation Of 1000mm Belt Structure At 28 Ls, 6 D, 39 L, 45 L, 51 L, 57 L (Length Of Belt Structure 2856.0m), 2) Transportation And Installation Of 7 Nos Drive Head Complete Set, 3) Transportation And Laying Of 4 Pipe Line, 90mm
|
| Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_SECL_314293_1 |
|
Reference Number |
AGM/HSD/GM(O)/e-Tend/24-25/64 dtd 05.08.2024 |
| Tender Fee | 0 |
| EMD | 1.08 Lakh |
| Tender Value | - |
| Place | SECL Hasdeo Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=325703 |
| Start Date | August 05, 2024 23:30 |
| End Date |
Expired
21/08/2024
Expired 749 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
New installation of belt conveyor structure and drive head in 6d and 9wl of riv seam at khottadih colliery.
New installation of belt conveyor structure and drive head in 6d and 9wl of riv seam at khottadih colliery.
Read moreFacility management services - lumpsum based - transportation and withdrawal of belt structure driv
Read more
(i) dismantling and transportation of 800mm belt structure and 4nos drive head complete length of belt1056m) (ii) transportation and installation of 1000mm belt structure and 5 nos drive head complete (length of belt structure1626m)
(i) dismantling and transportation of 800mm belt structure and 4nos drive head complete length of belt1056m) (ii) transportation and installation of 1000mm belt structure and 5 nos drive head complete (length of belt structure1626m)
Read more(i) erection of temporary stopping by old reject conveyor belt in -39dip and 28ls lhcm panel (ii) cleaning , removal of malma along travelling roadway of -39dip and 28ls panel (iii) transportation, laying, charging of armored cable from old dist. to
(i) erection of temporary stopping by old reject conveyor belt in -39dip and 28ls lhcm panel (ii) cleaning , removal of malma along travelling roadway of -39dip and 28ls panel (iii) transportation, laying, charging of armored cable from old dist. to
Read moreDismantling, transportation and installation of (1000mm size) tail end drum, drum base, tail end guard, side plate/loading brackets (chute), decking plates and belt structure, belt conveyor from old district/surface to new depillaring panel no. -6d,
Dismantling, transportation and installation of (1000mm size) tail end drum, drum base, tail end guard, side plate/loading brackets (chute), decking plates and belt structure, belt conveyor from old district/surface to new depillaring panel no. -6d,
Read moreTransportation of conveyor belt line materials including belt and structure from tb-1 drive head to 18l 5th main dip, to 39l, 5th main dip,loading,walking along with car,rehandling,transport to surface incline mouth,stacking at store oc-3,osa,oa,mcl
Transportation of conveyor belt line materials including belt and structure from tb-1 drive head to 18l 5th main dip, to 39l, 5th main dip,loading,walking along with car,rehandling,transport to surface incline mouth,stacking at store oc-3,osa,oa,mcl
Read morePillars shortening from -1d 80l to -6d 80l re fitting of 5 pillars structure from -6d 80l to 1d 80l of 1000mm 80l belt conveyor of lhcm-1 section in r-viia seam at 3n4 incline, jpc
Pillars shortening from -1d 80l to -6d 80l re fitting of 5 pillars structure from -6d 80l to 1d 80l of 1000mm 80l belt conveyor of lhcm-1 section in r-viia seam at 3n4 incline, jpc
Read moreDismantling, transportation and installation of (800mm size) tail end drum, drum base, tail end guard, side plate/loading brackets (chute), decking plates and belt structure belt conveyor transportation of transformer and transportation of armored
Dismantling, transportation and installation of (800mm size) tail end drum, drum base, tail end guard, side plate/loading brackets (chute), decking plates and belt structure belt conveyor transportation of transformer and transportation of armored
Read moreDismantling, transportation and installation of 1000mm size drive drum, tail end drum, drum base, tail end guard, side plate/loading brackets (chute), decking plates, belt structure, belt conveyor and dismantling, transportation
Dismantling, transportation and installation of 1000mm size drive drum, tail end drum, drum base, tail end guard, side plate/loading brackets (chute), decking plates, belt structure, belt conveyor and dismantling, transportation
Read moreShortening of 1120 meters of 1000mm belt conveyor. dismantling and transportation of 1120meters of belt structure with pvc belt and 1120 meters of 80mm of gi pipe and dismantling and transportation of 3 nos of 1000 mm belt conveyor drive head at tawa
Shortening of 1120 meters of 1000mm belt conveyor. dismantling and transportation of 1120meters of belt structure with pvc belt and 1120 meters of 80mm of gi pipe and dismantling and transportation of 3 nos of 1000 mm belt conveyor drive head at tawa
Read moreof your Industry type