Tender Details
Particulars | Details |
---|---|
Title |
Dismantling, Transportation And Installation Of (800mm Size) Tail End Drum, Drum Base, Tail End Guard, Side Plate/Loading Brackets (Chute), Decking Plates And Belt Structure Belt Conveyor Transportation Of Transformer And Transportation Of Armored
|
Description |
Dismantling, Transportation And Installation Of (800mm Size) Tail End Drum, Drum Base, Tail End Guard, Side Plate/Loading Brackets (Chute), Decking Plates And Belt Structure Belt Conveyor Transportation Of Transformer And Transportation Of Armored
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_SECL_317560_1 |
Reference Number |
AGM/HSD/GM(O)/e-Tend/24-25/84 dtd 17.09.2024 |
Tender Fee | 0 |
EMD | 79400 |
Tender Value | |
Place | SECL Hasdeo Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=329146 |
Start Date | September 17, 2024 23:30 |
End Date |
08/10/2024 ( Expired 195 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dismantling, loading, unloading, laying of track line its accessories and dismantling, loading, unloading, transportation of pvc belt and its accessories from 25 lw panel then installation in proposed depillaring panel 40le.
Dismantling, loading, unloading, laying of track line its accessories and dismantling, loading, unloading, transportation of pvc belt and its accessories from 25 lw panel then installation in proposed depillaring panel 40le.
Read moreReplacement of tail end drum of -2l tandem belt and repairing of o belt discharge chute
Replacement of tail end drum of -2l tandem belt and repairing of o belt discharge chute
Read moreUpkeepment of spilled materials from deck plates, rollers, gallery and ground area tail end side of 1201 and 1301 belt conveyor of ps-9 section at madhuban coal washery under block-ii area, bccl .
Upkeepment of spilled materials from deck plates, rollers, gallery and ground area tail end side of 1201 and 1301 belt conveyor of ps-9 section at madhuban coal washery under block-ii area, bccl .
Read moreReplacement, repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1401 belt conveyor at loading section at madhuban coal washery under block-ii area, bccl .
Replacement, repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1401 belt conveyor at loading section at madhuban coal washery under block-ii area, bccl .
Read moreRepairing of 02 nos tail end drum of c3 and c7 belt and 01 no discharge drum of c8 belt conveyor of bhatgaon chp
Repairing of 02 nos tail end drum of c3 and c7 belt and 01 no discharge drum of c8 belt conveyor of bhatgaon chp
Read moreFabrication and erection of discharge chute with side guard and its channel, angle and plate etc of unit no. 52 complete dismantling and fitting in rcb section at kathara washery
Fabrication and erection of discharge chute with side guard and its channel, angle and plate etc of unit no. 52 complete dismantling and fitting in rcb section at kathara washery
Read moreLoading, transportation and unloading of new dismantling and shortening of 800mm belt with drive head and structure complete with electricals from e9lhd depillaring panel to e8/main dip panel of bagdona seam at tawa mine of pathakhera area.
Loading, transportation and unloading of new dismantling and shortening of 800mm belt with drive head and structure complete with electricals from e9lhd depillaring panel to e8/main dip panel of bagdona seam at tawa mine of pathakhera area.
Read moreRepairing/ strengthening and replacement of discharge chute along with its side skirts after dismantling of existing worn-out chute for unit c-2 and 801-b belt conveyor at moonidih coal washery.
Repairing/ strengthening and replacement of discharge chute along with its side skirts after dismantling of existing worn-out chute for unit c-2 and 801-b belt conveyor at moonidih coal washery.
Read moreDismantling, loading, transportation and unloading of 1200 mm conveyor belt drive structure from sonepur bazari area for necessary fabrication work at unit workshop at pandaveswar colliery under pandaveswar area.
Dismantling, loading, transportation and unloading of 1200 mm conveyor belt drive structure from sonepur bazari area for necessary fabrication work at unit workshop at pandaveswar colliery under pandaveswar area.
Read moreEchpii clearing the coal coal dust and foreign materials daily on walkways of both side side under belt throughout conveyors deck sheet and tail end areas monitoring cleaning and checking the mechanical equipments of conveyor 72 73 .
Echpii clearing the coal coal dust and foreign materials daily on walkways of both side side under belt throughout conveyors deck sheet and tail end areas monitoring cleaning and checking the mechanical equipments of conveyor 72 73 .
Read moreof your Industry type