Tender Details
Particulars | Details |
---|---|
Title |
Tree Plantation Maintainance On Nandal Surawadi Pimpalwadi Hol Road Mdr 12 In Km 2/00 To 8/00 Tal Phaltan Dist Satara.
|
Description |
Tree Plantation Maintainance On Nandal Surawadi Pimpalwadi Hol Road Mdr 12 In Km 2/00 To 8/00 Tal Phaltan Dist Satara.
|
Organisation | Public Works Region-Pune | State Govt. and UT |
Tender Id | 2024_PWDRP_1115418_2 |
Reference Number |
SHORT TERM E-TENDER NOTICE NO. 79 FOR 2024-2025 |
Tender Fee | 1680 |
EMD | 59000 |
Tender Value | |
Place | Tal- Phaltan Dist- satara. |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1964149 |
Start Date | December 18, 2024 14:30 |
End Date |
03/01/2025 ( Expired 109 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreUpgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Read moreWidening of existing road 2 laning stretch into 4 lane configuration in phaltan city ch 138 250 to ch 144 425 and construction of new rob at km 179 730 existing km 61 100 of nh 965 in the state of maharashtra
Widening of existing road 2 laning stretch into 4 lane configuration in phaltan city ch 138 250 to ch 144 425 and construction of new rob at km 179 730 existing km 61 100 of nh 965 in the state of maharashtra
Read morePackage no.rd-sta-ahm(ii)-11 chondi to naon daku road km 0/000 to 2/700 tal-karjat dist ahilyanagar
Package no.rd-sta-ahm(ii)-11 chondi to naon daku road km 0/000 to 2/700 tal-karjat dist ahilyanagar
Read moreS.t.b.t pimplas dhamke vasti to surase vasti road km 0/00 to 2/00 (v.r-147) tal rahata dist- ahilyanagar
S.t.b.t pimplas dhamke vasti to surase vasti road km 0/00 to 2/00 (v.r-147) tal rahata dist- ahilyanagar
Read moreConstruction of rob on ramganj mandi jhalawar railway lc no. 3-a/2-e suket pipaliya road km. 8/0 (mdr-109)
Construction of rob on ramganj mandi jhalawar railway lc no. 3-a/2-e suket pipaliya road km. 8/0 (mdr-109)
Read moreRenewal work by sdbc in vijaynager-pathalidhar motor road from km 2 to 8 in augastyamuni block in district rudraprayag under annual repair.
Renewal work by sdbc in vijaynager-pathalidhar motor road from km 2 to 8 in augastyamuni block in district rudraprayag under annual repair.
Read moreConstruction of road from mdr 29 to hudi tanda to dist border road vr 65 km 0/00 to 2/00 tq. sengaon
Construction of road from mdr 29 to hudi tanda to dist border road vr 65 km 0/00 to 2/00 tq. sengaon
Read moreStrengthening and upgradation by pqc and white topping on garoth boliya road km 3,5 to 12 16/6-10,17/6-8 total 10.00 including eclectic poll shifting work dn mandsaour
Strengthening and upgradation by pqc and white topping on garoth boliya road km 3,5 to 12 16/6-10,17/6-8 total 10.00 including eclectic poll shifting work dn mandsaour
Read moreB.t. renewal work on navra to ghagharla road in km 1/2 to 4/6 total 3.60 km
B.t. renewal work on navra to ghagharla road in km 1/2 to 4/6 total 3.60 km
Read moreof your Industry type