Tender Details

About Tender

🏭 Invitation For Bids: Iron Removal Plant 🚫🚫 The Municipal Affairs Department Of A State Government Or Union Territory Is Seeking Bids From Experienced Contractors For The Supply, Fabrication, Erection, And Commissioning Of A Pressure Type Iron Removal Plant. The Project Scope Includes A 3 Month Trial Run And 5 Years Of Operation & Maintenance (O&M), Including Routine Testing Of Water Samples For Performance Evaluation. 📅 Bid Submission Deadline: May 06, 2024, 5:00 Pm A Tender Fee Of Inr 200,000 Must Be Submitted With The Bid. Interested Bidders Should Submit Detailed Proposals, Including Technical Specifications, Cost Estimates, And A Comprehensive O&M Plan For The Duration Of The Contract. Keywords: Iron Removal Plant, Supply, Fabrication, Erection, Commissioning, Operation & Maintenance, Municipal Affairs Department, State Govt. And Ut, Water Treatment, Tender, Bid
Particulars Details
Title
Supplying, Fabrication, Erection On Suitable Rcc Foundation And Commissioning Including 3 (Three) Months Trial Run And 5 (Five) Years O M (Including Cost Of Routine Testing Of Water Sample For Performance Evaluation) Of Pressure Type Iron Removal Pla
Description
Supplying, Fabrication, Erection On Suitable Rcc Foundation And Commissioning Including 3 (Three) Months Trial Run And 5 (Five) Years O M (Including Cost Of Routine Testing Of Water Sample For Performance Evaluation) Of Pressure Type Iron Removal Pla
Organisation MUNICIPAL AFFAIRS DEPARTMENT | State Govt. and UT
Tender Id 2024_MAD_682967_1
Reference
Number
12ofSE(N)/MED/2023-24
Tender Fee 0
EMD 2 Lakh
Tender Value -
Place Maynaguri
Link
View Original Tender Notice

https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1487311

Start Date April 05, 2024 20:30
End Date
Expired 06/05/2024

Expired 892 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Epc and performance run followed by o and m of stp of 50 mld capacity based on sbr technology at nevta including 3 months trial run and 1 year o and m and after with 10 years o and m for ward 65 66 67 bhankrota and surrounding nearby areas upto nevta

Epc and performance run followed by o and m of stp of 50 mld capacity based on sbr technology at nevta including 3 months trial run and 1 year o and m and after with 10 years o and m for ward 65 66 67 bhankrota and surrounding nearby areas upto nevta

Read more
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).

Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).

Read more
Supplying, fabrication, erection on suitable rcc foundation and commissioning including 3 (three) months trial run and 5 (five) years o m (including cost of routine testing of water sample for performance evaluation) of pressure type iron removal pla

Supplying, fabrication, erection on suitable rcc foundation and commissioning including 3 (three) months trial run and 5 (five) years o m (including cost of routine testing of water sample for performance evaluation) of pressure type iron removal pla

Read more
Supplying, fabrication, erection on suitable rcc foundation and commissioning including 3 (three) months trial run and 5 (five) years o m (including cost of routine testing of water sample for performance evaluation) of pressure type iron removal pla

Supplying, fabrication, erection on suitable rcc foundation and commissioning including 3 (three) months trial run and 5 (five) years o m (including cost of routine testing of water sample for performance evaluation) of pressure type iron removal pla

Read more
Supplying, fabrication, erection on suitable rcc foundation and commissioning including 3 (three) months trial run and 5 (five) years operation and maintenance including cost of routine testing of water sample for performance evaluation of pressure t

Supplying, fabrication, erection on suitable rcc foundation and commissioning including 3 (three) months trial run and 5 (five) years operation and maintenance including cost of routine testing of water sample for performance evaluation of pressure t

Read more
Supplying, fabrication, erection on suitable rcc foundation and commissioning including 3 (three) months trial run and 5 (five) years operation and maintenance including cost of routine testing of water sample for performance evaluation of pressure t

Supplying, fabrication, erection on suitable rcc foundation and commissioning including 3 (three) months trial run and 5 (five) years operation and maintenance including cost of routine testing of water sample for performance evaluation of pressure t

Read more
Supplying, fabrication, erection on suitable rcc foundation and commissioning with 3 (three) months trial run (including cost of routine testing of water sample for performance evaluation) of pressure type iron removal plant as per design norms of th

Supplying, fabrication, erection on suitable rcc foundation and commissioning with 3 (three) months trial run (including cost of routine testing of water sample for performance evaluation) of pressure type iron removal plant as per design norms of th

Read more
Supplying, fabrication, erection on suitable rcc foundation and commissioning with 3 (three) months trial run (including cost of routine testing of water sample for performance evaluation) of pressure type iron removal plant as per design norms of th

Supplying, fabrication, erection on suitable rcc foundation and commissioning with 3 (three) months trial run (including cost of routine testing of water sample for performance evaluation) of pressure type iron removal plant as per design norms of th

Read more
Maintenance service/inspection of caterpillar make gas engine-a (model g3606) installed at iocl compressor station, srpl ramanathapuram for final performance evaluation of iocl grade servo green edge field trial run.

Maintenance service/inspection of caterpillar make gas engine-a (model g3606) installed at iocl compressor station, srpl ramanathapuram for final performance evaluation of iocl grade servo green edge field trial run.

Read more
Supplying, fabrication, erection on suitable rcc foundation and commissioning including 3 (three) months trial run and 5 (five) ..etc. with common manifold connection for the water supply scheme within maynaguri municipality under amrut 2.

Supplying, fabrication, erection on suitable rcc&amp#x0d foundation and commissioning including 3 (three) months trial run and 5 (five) ..etc. with common manifold connection for the water supply scheme within maynaguri municipality under amrut 2.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise