Tender Details
Particulars | Details |
---|---|
Title |
Supplying, Fabrication, Erection On Suitable Rcc Foundation And Commissioning Including 3 (Three) Months Trial Run And 5 (Five) Years Operation And Maintenance Including Cost Of Routine Testing Of Water Sample For Performance Evaluation Of Pressure T
|
Description |
Supplying, Fabrication, Erection On Suitable Rcc Foundation And Commissioning Including 3 (Three) Months Trial Run And 5 (Five) Years Operation And Maintenance Including Cost Of Routine Testing Of Water Sample For Performance Evaluation Of Pressure T
|
Organisation | MUNICIPAL AFFAIRS DEPARTMENT | State Govt. and UT |
Tender Id | 2024_MAD_780001_1 |
Reference Number |
20/AMRUT 2.0/SE(CC)/2024-25 |
Tender Fee | 0 |
EMD | 2 Lakh |
Tender Value | |
Place | Buniadpur Municipality |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1728084 |
Start Date | December 12, 2024 15:30 |
End Date |
31/12/2024 ( Expired 133 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Designing , construction and commissioning of 1000,3000 cum cwr with em works and four numbers em works and construction and commissioning of rcc ohr 11 nos intze type with three months trial and five years om under amrut 2.0 within kharagpur
Designing , construction and commissioning of 1000,3000 cum cwr with em works and four numbers em works and construction and&#x0d commissioning of rcc ohr 11 nos intze type with three months trial and five years om under amrut 2.0 within kharagpur
Read moreSupply, installation, commissioning, and testing of digital gallery at ujjain planetarium tara mandal including operation and comprehensive maintenance for five years under ujjain smart city 3rd call
Supply, installation, commissioning, and testing of digital gallery at ujjain planetarium tara mandal including operation and comprehensive maintenance for five years under ujjain smart city 3rd call
Read moreSupplying, fabrication, erection on suitable rcc foundation and commissioning with 3 (three) months trial run (including cost of routine testing of water sample for performance evaluation) of pressure type iron removal plant as per design norms of th
Supplying, fabrication, erection on suitable rcc foundation and commissioning with 3 (three) months trial run (including cost of routine testing of water sample for performance evaluation) of pressure type iron removal plant as per design norms of th
Read moreDesign manufacture supply erection testing and commissioning of 01 kw and 02 kw off grid solar pv power plants at various places of distt nainital including five years warrantee operation and maintenance
Design manufacture supply erection testing and commissioning of 01 kw and 02 kw off grid solar pv power plants at various places of distt nainital including five years warrantee operation and maintenance
Read moreDesign, supply, construction, installation, testing and commissioning of sewage treatment plant of capacity 3.1 mld at ashwani khad based on advanced modern sbr technology
Contingent civil including staff quarter electrical mechanical piping and instrumentation works with three months trial including three-year defect liability period and 5 years of operation and maintenance.
Read moreDesign supply, installation, testing and commissioning (on turnkey basis) of construction of lift water supply scheme hundurman broq through a dynamic head of 690 mtr, including five (05) years maintenance and operation.
Design supply, installation, testing and commissioning (on turnkey basis) of construction of lift water supply scheme hundurman broq through a dynamic head of 690 mtr, including five (05) years maintenance and operation.&#x0d complete automation of the s
Read moreOperation and maintenance of water testing sample in jal shakti divisional building jubbal in tehsil jubbal distt shimla hp physical and becteriogical test for three years
Operation and maintenance of water testing sample in jal shakti divisional building jubbal in tehsil jubbal distt shimla hp physical and becteriogical test for three years
Read moreDesign, supplying, fabrication, erection and commissioning of structural staging, rcc foundation, roofing, smc-gfrp panel tanks for 0.25 lac gallons capacity, construction of rcc sump 0.25 gallons capacity, etc etc wss gasoo under ut capex
Design, supplying, fabrication, erection and commissioning of structural staging, rcc foundation, roofing, smc-gfrp panel tanks for 0.25 lac gallons capacity, construction of rcc sump 0.25 gallons capacity, etc etc wss gasoo under ut capex
Read moreSupply, installation, commissioning, and testing of digital gallery at ujjain planetarium tara mandal including operation and comprehensive maintenance for five years under ujjain smart city- 2nd call
Supply, installation, commissioning, and testing of digital gallery at ujjain planetarium tara mandal including operation and comprehensive maintenance for five years under ujjain smart city- 2nd call
Read morePre-engineered turnkey execution for design, supply, erection, commissioning, trial run, testing with o and m during dlp etc. for coal handling plant with silo loading arrangement at lakhanpur area, ib valley coalfields of mcl.
Pre-engineered turnkey execution for design, supply, erection, commissioning, trial run, testing with o and m during dlp etc. for coal handling plant with silo loading arrangement at lakhanpur area, ib valley coalfields of mcl.
Read moreof your Industry type