Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supplying, Fabrication, Erection On Suitable Rcc Foundation And Commissioning Including 3 (Three) Months Trial Run And 5 (Five) Years O M (Including Cost Of Routine Testing Of Water Sample For Performance Evaluation) Of Pressure Type Iron Removal Pla
|
| Description |
Supplying, Fabrication, Erection On Suitable Rcc Foundation And Commissioning Including 3 (Three) Months Trial Run And 5 (Five) Years O M (Including Cost Of Routine Testing Of Water Sample For Performance Evaluation) Of Pressure Type Iron Removal Pla
|
| Organisation | MUNICIPAL AFFAIRS DEPARTMENT | State Govt. and UT |
| Tender Id | 2024_MAD_770461_1 |
|
Reference Number |
4/AMRUT 2.0/SE(CC)/2024-25(2nd Call) |
| Tender Fee | 0 |
| EMD | 2 Lakh |
| Tender Value | - |
| Place | ISLAMPUR MUNICIPALITY |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1706124 |
| Start Date | November 25, 2024 15:30 |
| End Date |
Expired
17/12/2024
Expired 667 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Epc and performance run followed by o and m of stp of 50 mld capacity based on sbr technology at nevta including 3 months trial run and 1 year o and m and after with 10 years o and m for ward 65 66 67 bhankrota and surrounding nearby areas upto nevta
Epc and performance run followed by o and m of stp of 50 mld capacity based on sbr technology at nevta including 3 months trial run and 1 year o and m and after with 10 years o and m for ward 65 66 67 bhankrota and surrounding nearby areas upto nevta
Read moreEpc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Read moreSupplying, fabrication, erection on suitable rcc foundation and commissioning including 3 (three) months trial run and 5 (five) years o m (including cost of routine testing of water sample for performance evaluation) of pressure type iron removal pla
Supplying, fabrication, erection on suitable rcc foundation and commissioning including 3 (three) months trial run and 5 (five) years o m (including cost of routine testing of water sample for performance evaluation) of pressure type iron removal pla
Read moreSupplying, fabrication, erection on suitable rcc foundation and commissioning including 3 (three) months trial run and 5 (five) years o m (including cost of routine testing of water sample for performance evaluation) of pressure type iron removal pla
Supplying, fabrication, erection on suitable rcc foundation and commissioning including 3 (three) months trial run and 5 (five) years o m (including cost of routine testing of water sample for performance evaluation) of pressure type iron removal pla
Read moreSupplying, fabrication, erection on suitable rcc foundation and commissioning including 3 (three) months trial run and 5 (five) years operation and maintenance including cost of routine testing of water sample for performance evaluation of pressure t
Supplying, fabrication, erection on suitable rcc foundation and commissioning including 3 (three) months trial run and 5 (five) years operation and maintenance including cost of routine testing of water sample for performance evaluation of pressure t
Read moreSupplying, fabrication, erection on suitable rcc foundation and commissioning including 3 (three) months trial run and 5 (five) years operation and maintenance including cost of routine testing of water sample for performance evaluation of pressure t
Supplying, fabrication, erection on suitable rcc foundation and commissioning including 3 (three) months trial run and 5 (five) years operation and maintenance including cost of routine testing of water sample for performance evaluation of pressure t
Read moreSupplying, fabrication, erection on suitable rcc foundation and commissioning with 3 (three) months trial run (including cost of routine testing of water sample for performance evaluation) of pressure type iron removal plant as per design norms of th
Supplying, fabrication, erection on suitable rcc foundation and commissioning with 3 (three) months trial run (including cost of routine testing of water sample for performance evaluation) of pressure type iron removal plant as per design norms of th
Read moreSupplying, fabrication, erection on suitable rcc foundation and commissioning with 3 (three) months trial run (including cost of routine testing of water sample for performance evaluation) of pressure type iron removal plant as per design norms of th
Supplying, fabrication, erection on suitable rcc foundation and commissioning with 3 (three) months trial run (including cost of routine testing of water sample for performance evaluation) of pressure type iron removal plant as per design norms of th
Read moreMaintenance service/inspection of caterpillar make gas engine-a (model g3606) installed at iocl compressor station, srpl ramanathapuram for final performance evaluation of iocl grade servo green edge field trial run.
Maintenance service/inspection of caterpillar make gas engine-a (model g3606) installed at iocl compressor station, srpl ramanathapuram for final performance evaluation of iocl grade servo green edge field trial run.
Read moreSupplying, fabrication, erection on suitable rcc foundation and commissioning including 3 (three) months trial run and 5 (five) ..etc. with common manifold connection for the water supply scheme within maynaguri municipality under amrut 2.
Supplying, fabrication, erection on suitable rcc&#x0d foundation and commissioning including 3 (three) months trial run and 5 (five) ..etc. with common manifold connection for the water supply scheme within maynaguri municipality under amrut 2.
Read moreof your Industry type